scholarly journals Peak capacity analysis of coal power in China based on full-life cycle cost model optimization

Author(s):  
Xiaoqing Yan ◽  
Jinfang Zhang ◽  
Xinting Huang
2013 ◽  
Vol 357-360 ◽  
pp. 2454-2459
Author(s):  
Hui Ling Li ◽  
Hang Tian Liu ◽  
Xiao Qin Li

This paper first selects the theory of full lifecycle cost as the entry point and analyses the composition of full lifecycle cost of energy-saving buildings. Then it clarifies that the full lifecycle cost estimation of energy-saving buildings is an analytical tool in capital investment and a way to minimize the full lifecycle cost of energy-saving buildings. We also construct the concept and steps of cost estimation and build two mathematical models of full lifecycle cost estimation under two different application conditions; Finally, this paper illustrates the economic and social benefits brought by full life cycle cost estimation of energy-saving buildings through the case studies.


2014 ◽  
Vol 521 ◽  
pp. 159-162
Author(s):  
Xue Bing Zheng ◽  
Ran Li

For a long time, the power company is always concerned about acquisition costs in power equipment selection and ignores the impact of operating costs on the selection decision. Thus, the selection model has a certain one-sidedness. In this paper, the life cycle costs theory is applied to the transformer selection, which consider transformer initial investment costs, operation and maintenance costs, technological overhaul costs, the cost of failure and scrap disposal costs in full life cycle more comprehensively. The result not only gives the transformer blind number expectations of full life cycle cost, but also can give the credibility of different costs interval and have a certain reference value.


2014 ◽  
Vol 1079-1080 ◽  
pp. 1220-1223
Author(s):  
Bin Guo ◽  
Hai Bo Mu ◽  
Ao Jiao

Public rental housing plays an important role in the construction ofsecurity housing system in our country, but in the current development andoperation mode, public rental housing project of its own financial viabilityCo., need the government to give large amounts of funds and policy support, thedependence is strong, is not conducive to sustainable development projects,limiting its security role play. In this paper, by using the life cycle costtheory, the construction of public rental housing life cycle cost model,analyze the existing problems in the development and operation mode, and thenputs forward the improvement direction of development and operation pattern,causes it to have certain financial viability, provide policy recommendationsfor the future development of China's public rental housing.


2013 ◽  
Vol 773 ◽  
pp. 961-964
Author(s):  
Li Zhi Tang ◽  
Bao Hua Bai ◽  
Kun Peng Xu

ntroduction of full life-cycle cost theory based on the current power enterprise device management status, and build its accounting model, analysis of the main factors to affect the life cycle cost of the equipment from the four aspects of the design mechanism, tender, maintenance, basic database and proposes the application of full-theory of life cycle costs for equipment management suggestions.


1994 ◽  
Vol 11 (1) ◽  
pp. 47-56
Author(s):  
Virginia C. Day ◽  
Zachary F. Lansdowne ◽  
Richard A Moynihan ◽  
John A. Vitkevich

1994 ◽  
Author(s):  
Bonnie J. LaFleur ◽  
Jennifer A. Jaeger ◽  
Lawrence A. Hermansen

2022 ◽  
Vol 162 ◽  
pp. 108054
Author(s):  
Xiaoshu Qin ◽  
Chang Peng ◽  
Gaozheng Zhao ◽  
Zengye Ju ◽  
Shanshan Lv ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document