Study on the Improvement of Public Rental Housing Development and Operation Model Based on Full Life Cycle Theory

2014 ◽  
Vol 1079-1080 ◽  
pp. 1220-1223
Author(s):  
Bin Guo ◽  
Hai Bo Mu ◽  
Ao Jiao

Public rental housing plays an important role in the construction ofsecurity housing system in our country, but in the current development andoperation mode, public rental housing project of its own financial viabilityCo., need the government to give large amounts of funds and policy support, thedependence is strong, is not conducive to sustainable development projects,limiting its security role play. In this paper, by using the life cycle costtheory, the construction of public rental housing life cycle cost model,analyze the existing problems in the development and operation mode, and thenputs forward the improvement direction of development and operation pattern,causes it to have certain financial viability, provide policy recommendationsfor the future development of China's public rental housing.

2016 ◽  
Vol 2016 ◽  
pp. 1-10 ◽  
Author(s):  
Sung-Min Choi ◽  
Yeon-Sil Lee

Currently, repair and maintenance cycles that follow the completion of construction facilities lead to the necessitation of subsequent data on the analysis of study and plan for maintenance. As such, an index of evaluation was drafted and a plan of maintenance cycle was computed using the investigation data derived from surveying target housing units in permanent rental environmental conditions, with a minimum age of 20 years, and their maintenance history. Optimal maintenance and replacement methods were proposed based on this data. Economic analysis was conducted through the Risk-Weighted Life Cycle Cost (RWLCC) method in order to determine the cost analysis of maintenance life cycle methods used for repair. Current maintenance cycle methods that have been used for 20 years were also compared with alternative maintenance cycles.


2014 ◽  
Vol 584-586 ◽  
pp. 2476-2480
Author(s):  
Wei Li ◽  
Xue Lei Zhou ◽  
Yu Fu

The cost of public rental housing depending on the view of life-cycle has been studied. The construction project life-cycle cost management paradigm consider both of the cost in construction period and the cost in operation period was proposed. The proposed construction of projects cost includes not only the cost of funding sense, should also include environmental costs and social cost. By reducing life-cycle cost of public rental housing, maximize the project value, so the economy and people's livelihood can truly improved.


1994 ◽  
Vol 11 (1) ◽  
pp. 47-56
Author(s):  
Virginia C. Day ◽  
Zachary F. Lansdowne ◽  
Richard A Moynihan ◽  
John A. Vitkevich

1994 ◽  
Author(s):  
Bonnie J. LaFleur ◽  
Jennifer A. Jaeger ◽  
Lawrence A. Hermansen

2015 ◽  
Vol 74 (2) ◽  
Author(s):  
Ooi Chu Hui ◽  
Abdul Hakim Mohammed

This paper highlights the basic process of developing a life cycle cost model and the role of cost breakdown structure for water distribution pipeline networks. A life cycle cost is the total cost of owning an asset during its predicted useful life, while a cost breakdown structure illustrates all the costs emerged in each single phase of the asset’s life cycle cost. Its purpose is to identify, define and organize all cost elements to be taken into account in a life cycle cost. Each cost element included in developing a cost breakdown structure will also be discussed in this paper.


2002 ◽  
Author(s):  
Alberto B. Calvo ◽  
Alexander J. Danish ◽  
David Marcus

Sign in / Sign up

Export Citation Format

Share Document