scholarly journals Design and Analysis Performance Solar Power Plant 15 kW By Maximizing Final Yield and Performance Ratio In Small-Medium Office

2021 ◽  
Vol 1096 (1) ◽  
pp. 012082
Author(s):  
C H B Apribowo ◽  
M Nizam ◽  
S Pramono ◽  
H Maghfiroh ◽  
K Hakim
2019 ◽  
Vol 10 (1) ◽  
pp. 38-44
Author(s):  
Redaksi Tim Jurnal

The Solar Power Plant Off-Grid 1 kWp at STT-PLN is one of the power plants built at STT-PLN to support renewable energy research, especially solar power generation. Since the solar power plant Off-Grid 1 kWp in STT-PLN has not yet known the optimum potential of electrical energy, the final yield (YF), the performance ratio (PR), and the efficiency of the system which is the parameters of a plant's performance Solar power. It is therefore necessary to analyze the performance of the solar power plant Off-Grid 1 kWp in STT-PLN, in order to know the operating system and the constraints that occur in the solar power plant Off-Grid 1 kWp in STT-PLN. To know the working parameters of Off-Grid 1 kWp in STT-PLN then do the research before and after maintenance of solar powerplant. Where final yield (YF), performance ratio (PR) before maintenance is 1.71343 Wh / Wp.day; 51.78%. While after maintenance of 3.10121 Wh / Wp.day; And 79.29%. From this research also obtained the efficiency of Off-Grid 1 kWp solar power system in STTPLN as a whole by 80,40%.


Author(s):  
J. Raja ◽  
Nishant Jain ◽  
C. Christober Asir Rajan

<p>in India to meet its future energy demand. This paper emphasis on the performance assessment of grid connected mega-watt solar power plant which is of 23MW and 5MW are located in different geographical location in India. Performance assessment is the finest way to determine the potential of energy generation in solar power plant and it also helps in evaluating the design, operation and maintenance of existing and future solar power plant. The parameters namely calculation of annual energy generated, reference yield, final yield, system losses, cell temperature losses, performance ratio and capacity utilization factor are considered in examining solar power plant performance. In this study experimental measurement of two solar power plant one is located in Gujarat (23MW) and another in Andhra Pradesh (5MW) are compared with the results of estimated model from METEONORM 7.1 and PVSYST V6.67 software tools. Experimental measurement at solar power plant location covers the following measurement for analysis like actual weather condition, daily/hourly irradiance, actual energy yield and compares with capacity utilization factor, performance ratio and temperature corrected performance ratio parameters. The results demonstrated in this paper show the gap between the actual performance of solar power plant and the estimated model from software tool. Performance of solar power plant is satisfactory in comparison with other literature reviews. The actual annual energy generated for 23MW solar power plant was 37991MWh, 18.83% capacity utilization factor, 73.87% performance ratio and 75.33% temperature corrected performance ratio. Similarly, the actual annual energy generated for 5MW solar power plant was 9047.7MWh, 18.41% capacity utilization factor, 80.31% performance ratio and 79.90% temperature corrected performance ratio.</p>


Author(s):  
Bambang Winardi ◽  
Agung Nugroho ◽  
Enda Wista Sinuraya ◽  
Sukiswo . ◽  
Yuli Christyono ◽  
...  