Modeling and Design Procedures for Decontamination of an Evaporation Tower with Sieve Trays in Radioactive Wastewater Treatment of Nuclear Power Plant

2017 ◽  
Vol 34 (9) ◽  
pp. 648-658
Author(s):  
Chaojun Deng ◽  
Weixing Huang
Author(s):  
Laiye Zhu ◽  
Maogang Zhu ◽  
Yanhong He ◽  
Xin Wang ◽  
Wenshu Dong

With the introduction of third generation of nuclear power AP1000, Westinghouse uses the mobile device (a mobile wastewater treatment device 6 units shared) radioactive waste system design concepts. This design not only simplifies the process of nuclear island waste system; saves equipment layout space; improves equipment utilization; while increases the use of new technologies lifetime of the plant and the possibility of flexibility. This paper introduces the first AP1000 unit (Sanmen, Zhejiang Province) by using the advanced mobile device technology and application of wastewater treatment under the condition of the primary coolant source level. At the same time, the paper also discusses the periodic system inspection and the strategy of maintenance. In addition, the paper further expands the application direction of the mobile waste processing aspects, such as: decommissioning of nuclear facilities; enhancing the facility decommissioning radioactive liquid waste purification capability. Another example: After the Fukushima accident, people pay more attention to accident-mitigation-design and hope to accelerate the development of emergency radioactive liquid waste processing devices. Thus, in addition to strengthening the nuclear power plant inherent defense in depth and resistance emergency capability, mobile waste treatment device or combination device special regional settings can be made to improve and enhance the ability to get more diversified emergency response.


2021 ◽  
Vol 13 (11) ◽  
pp. 6308
Author(s):  
Guohua Fan ◽  
Baodeng Hou ◽  
Xinsheng Dong ◽  
Xiaowen Ding

Nowadays, cleaner production is getting more and more attention, and nuclear power has been widely used due to its low energy consumption and lower pollution. Most nuclear power plants in China, including those under construction and constructed ones, are coastal. For a nuclear power plant, however, its large amount of water consumption and high guarantee rate of water quality will have impacts on the regional water-resource allocation in the site area. During the water-discharge process, low-level radioactive wastewater and warm water will be discharged, while medium or even highly radioactive wastewater will be generated in an accident, both of which will affect the environment of the receiving water. In 2016, the Chinese government began to work on the Guidelines for Water Resources Assessment of Coastal Nuclear Power Plant Projects. The compilation work, led mainly by the Ministry of Water Resources, focused on analyzing key technical points of the impacts of water intake, wastewater discharge, and their reduction measures, as well as water-protection measures. In this study, the technical requirements for impact analysis of water-draw, wastewater discharge, and their remedial measures for coastal nuclear power construction projects in different periods were put forward. Lastly, the measures for water conservation, protection, and management were given. All the technical requirements and measures gave a research basis and technical support for the formulation of the guidelines.


2020 ◽  
Vol 39 (5) ◽  
pp. 6339-6350
Author(s):  
Esra Çakır ◽  
Ziya Ulukan

Due to the increase in energy demand, many countries suffer from energy poverty because of insufficient and expensive energy supply. Plans to use alternative power like nuclear power for electricity generation are being revived among developing countries. Decisions for installation of power plants need to be based on careful assessment of future energy supply and demand, economic and financial implications and requirements for technology transfer. Since the problem involves many vague parameters, a fuzzy model should be an appropriate approach for dealing with this problem. This study develops a Fuzzy Multi-Objective Linear Programming (FMOLP) model for solving the nuclear power plant installation problem in fuzzy environment. FMOLP approach is recommended for cases where the objective functions are imprecise and can only be stated within a certain threshold level. The proposed model attempts to minimize total duration time, total cost and maximize the total crash time of the installation project. By using FMOLP, the weighted additive technique can also be applied in order to transform the model into Fuzzy Multiple Weighted-Objective Linear Programming (FMWOLP) to control the objective values such that all decision makers target on each criterion can be met. The optimum solution with the achievement level for both of the models (FMOLP and FMWOLP) are compared with each other. FMWOLP results in better performance as the overall degree of satisfaction depends on the weight given to the objective functions. A numerical example demonstrates the feasibility of applying the proposed models to nuclear power plant installation problem.


Sign in / Sign up

Export Citation Format

Share Document