BIM-based life-cycle environmental assessment of prefabricated buildings

2020 ◽  
Vol 27 (8) ◽  
pp. 1703-1725 ◽  
Author(s):  
Yingbo Ji ◽  
Kai Qi ◽  
Yuan Qi ◽  
Yan Li ◽  
Hong Xian Li ◽  
...  

PurposeThis research aims to propose a comparative environmental analysis of conventional and prefabricated construction techniques utilizing a building information modelling (BIM) technique.Design/methodology/approachA set of indicators are selected to assess the environmental emissions throughout the construction life cycle, based on BIM platform. An existing project involving ten apartment buildings in Shanghai is selected as a case study.FindingsThe results reveal that prefabricated construction demonstrates environment-friendly performance with some exceptions of acidification and mineral resource consumption. Environmental impacts can also be further reduced by increasing the projected area ratio and percentage of project prefabrication.Originality/valueOverall, the proposed method can be used to identify relevant environmental merits and for decision-making of appropriate construction techniques in building construction projects.

2017 ◽  
Vol 24 (3) ◽  
pp. 486-513 ◽  
Author(s):  
Algan Tezel ◽  
Zeeshan Aziz

Purpose The purpose of this paper is to investigate the current visual management (VM) practices in highways construction projects in England. Design/methodology/approach Following a comprehensive literature review, the research topic was investigated by using five case studies and focus groups. Findings The main findings are the current implementation of VM is limited, particularly on the construction field, there are some identified points (suggestions) that require attention to disseminate and advance the current practices further many conventional and Building Information Modelling (BIM)-based opportunities to extend the current VM implementations exist for the sector. Originality/value The highways construction and maintenance sector in England has been systematically deploying lean construction techniques in its operations for a while. One of those lean techniques is a close-range visual communication strategy called VM. The literature on the VM implementation in construction is scarce and generally limited to the building construction context. This paper documents the current industry practice in conventional and BIM-based VM and identifies a set of recommendations and some VM ideas for future implementation efforts in the highways construction and maintenance sector.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
S. Hemalattha ◽  
R. Vidjeapriya

PurposeThis study aims to develop a framework for optimizing the spatial requirements of the equipment in a construction site using a geographic information system (GIS).Design/methodology/approachAn ongoing construction project, an existing thermal powerplant in India, is considered to be the case study, and the corresponding construction activities were scheduled. The equipment spaces were defined for the scheduled activities in building information modelling (BIM), which was further imported to GIS to define the topology rules, validate and optimize the spatial requirements. The BIM simulates the indoor environment, which includes the actual structure being constructed, and the GIS helps in modelling the outdoor environment, which includes the existing structures, temporary facilitates, topography of the site, etc.; thus, this study incorporates the knowledge of BIM in a geospatial environment to obtain optimized equipment spaces for various activities.FindingsSpace in construction projects is to be considered as a resource as well as a constraint, which is to be modelled and planned according to the requirements. The integration of BIM and GIS for equipment space planning will enable precise identification of the errors in the equipment spaces defined and also result in fewer errors as possible. The integration has also eased the process of assigning the topology rules and validating the same, which otherwise is a tedious process.Originality/valueThe workspace for each activity will include the space of the equipment. But, in most of the previous works of workspace planning, only the labour space is considered, and the conflicts and congestions occurring due to the equipment were neglected. The planning of equipment spaces cannot be done based only on the indoor environment; it has to be carried out by considering the surroundings and topography of the site, which have not been researched extensively despite its importance.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Zul-Atfi Bin Ismail

PurposeThe contemporary practice of conventional maintenance for industrialised building system (IBS) constructions suffers from poor service delivery and defect repetition. A key problem impeding the widespread adoption of emerging technologies is the lack of competent contractors to support the effectiveness of the technology implemented in conventional methods and to ensure returns on investment. The shortcomings of conventional methods are assessed from the perspective of IBS buildings. This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes.Design/methodology/approachThis paper describes the establishment of key problem areas, the elements involved in implementing good practice and the requirements for integrating maintenance management processes and information databases in the maintenance management system.FindingsConventional methods have little emphasis on defect diagnosis tools. They also enhance inadequate strategic decision-making in the analysis of information when attempting to improve the maintenance project outcomes for IBS construction. The characteristics identified in a case study of IBS buildings are presented and analysed.Originality/valueThe conclusions and recommendations drawn from the analysis of the IBS case study are discussed, synthesised and deliberated upon. The approach presented in this paper integrates various aspects of building information modelling technology to facilitate improved execution of IBS maintenance activities.


2017 ◽  
Vol 15 (1) ◽  
pp. 15-34 ◽  
Author(s):  
Olufolahan Oduyemi ◽  
Michael Iheoma Okoroh ◽  
Oluwaseun Samuel Fajana

Purpose The purpose of this paper is to explore and rank the benefits and barriers (technological and non-technological) of using Building Information Modelling (BIM) in sustainable building design. It also employs the use of a design tool analysis of a case study using BIM compatible tools (Ecotect and Green Building Studio) to determine the environmental performance of a proposed multi-use building at Derby North. Design/methodology/approach The paper explores the benefits and barriers of using BIM through a literature review. Regression and factor analysis were used to rank these benefits and barriers. A questionnaire was distributed to a sample of 120 practitioners with 69 completing the survey. Finally, the paper employs the use of a design tool analysis of a case study using BIM-compatible tools (Ecotect and Green Building Studio) to determine the environmental performance of a proposed multi-use building at Derby North riverside. Findings The key findings of the statistical analysis indicated that professionals ranked the integrated project delivery as the most established benefit, while the lack of interoperability was ranked the greatest technological challenge. Only three of the attributes of non-technological challenges made statistically unique contributions, namely, training costs and software costs, client demand and potential legal issues. It was also discovered that BIM delivers information needed for environmental performance. In a forward-looking approach, the paper attempts to provide some recommendations that would encourage the continuous application of BIM in sustainable building design. Research limitations/implications This paper does not cover all features of BIM functionality, as the scope of BIM is very enormous and the resources of this research were limited. Practical implications The implication of the study is that it will assist in exploring and ranking the benefits and barriers (technological and non-technological) of using BIM while proffering recommendations for future use. This research will be of interest to industry practitioners and academic researchers with an interest in building information modelling. Originality/value This paper contributes with new outlooks aimed at syndicating sustainability with environmental performance and adds to the limited empirical studies on the benefits and barriers of the application of BIM.


2019 ◽  
Vol 19 (2) ◽  
pp. 170-192 ◽  
Author(s):  
Abdul-Majeed Mahamadu ◽  
Lamine Mahdjoubi ◽  
Colin Booth ◽  
Patrick Manu ◽  
Emmanuel Manu

PurposeIn spite of emerging research on building information modelling (BIM) capability assessment, there is a general dearth of knowledge about the links between often pre-emptive capability measurement attributes and actual delivery success. More so, current studies have not considered success from the wider construction supply chain (CSC) perspective. So far, the perceived importance of capability metrics is not based on post-project evaluations of their contribution to BIM delivery success. This paper aims to identify relevant BIM capability attributes used for qualifying CSC organisations for projects and further aims to investigate their relative importance and influence on some key aspects of BIM delivery success.Design/methodology/approachBased on heretofore validated set of BIM capability attributes from semi-structured interviews and a Delphi study, a survey of CSC firms on BIM-enabled projects was used to model the influence of BIM capability attributes on BIM delivery success. Multiple regression modelling was performed to ascertain the nature of the relationship between BIM capability attributes and the key aspects of BIM delivery success as identified from the literature.FindingsBIM staff experience and the suitability of proposed methodology prior to project commencement were identified as the most influential on BIM delivery quality, as well as delivery within schedule and on budget. Conversely, the administrative and strategic-level capacities were found as the most influential in leveraging collaboration, coordination or integration of the CSC on projects through BIM.Originality/valueThis study provides a step change in prioritising BIM capability criteria based on evidence of their contribution to delivery success in key performance areas, rather than their perceived importance as capability metrics as widely practised.


2020 ◽  
Vol 12 (18) ◽  
pp. 7468
Author(s):  
José Pedro Carvalho ◽  
Ismael Alecrim ◽  
Luís Bragança ◽  
Ricardo Mateus

With the increasing concerns about building environmental impacts, building information modelling (BIM) has been used to perform different kinds of sustainability analysis. Among the most popular are the life cycle assessment (LCA) and building sustainability assessment (BSA). However, the integration of BIM-based LCA in BSA methods has not been adequately explored yet. This study addresses the relation between LCA and BSA within the BIM context for the Portuguese context. By performing an LCA for a Portuguese case study, a set of sustainability criteria from SBTool were simultaneous assessed during the process. The possibility of integrating BIM-based LCA into BSA methods can include more life cycle stages in the sustainability assessment and allow for normalising and producing more comparable results. BIM automates and connects different stages of the design process and provides information for multi-disciplinary data storage. However, there are still some constraints, such as different BSA/LCA databases and the necessity to manually introduce the embodied life cycle impacts of building materials. The scope of the BSA analysis can be expanded by integrating a complete LCA and be fostered by the support of BIM, effectively improving building sustainability according to local standards.


2018 ◽  
pp. 22-38
Author(s):  
Natalija Lepkova ◽  
◽  
Rana Maya ◽  
Sonia Ahmed ◽  
Vaidotas Šarka ◽  
...  

Recently, Building information modelling (BIM) proves its capability to solve the raised AEC industry issues. Therefore, several countries and entities pursue to transform into BIM especially the developed countries. Lithuania as a European country has a great challenge to cap up with the surrounding environment to implement BIM. This study aims to determine the BIM maturity levels in Lithuania and supposed the missed steps to upgrade to the next level. Eighteen important Lithuanian construction projects awarded the most successful implementing BIM are chosen as a case study. Face-to-face interviews were conducted with several BIM experts whose work at the chosen projects. The analysis conducted by the most effective theoretical model entitled BIM Maturity Matrix (BIMM). The key findings of this research that Lithuania reached the BIM implementing maturity level 2 while some projects still at level 1 that proves the ability of Lithuanian AEC industry to softly and completely transfer the maturity to level 2 by the recommendation provided through the proposed approach at the end of the paper. These results provide a stunning opportunity to improve the AEC project performance and reap the benefits of implementing BIM. Future studies can develop a framework to improve the BIM implementation in Lithuania softly.


2018 ◽  
Vol 18 (2) ◽  
pp. 152-166 ◽  
Author(s):  
Mohamed Zaher ◽  
David Greenwood ◽  
Mohamed Marzouk

Purpose The purpose of this paper is to facilitate the process of monitoring construction projects. Classic practice for construction progress tracking relies on paper reports, which entails a serious amount of manual data collection as well as the effort of imagining the actual progress from the paperwork. Design/methodology/approach This paper presents a new methodology for monitoring construction progress using smartphones. This is done by proposing a new system consisting of a newly-developed application named “BIM-U” and a mobile augmented reality (AR) channel named “BIM-Phase”. “BIM-U” is an Android application that allows the end-user to update the progress of activities onsite. These data are used to update the project’s 4D model enhanced with different cost parameters such as earned value, actual cost and planned value. The “BIM-Phase” application is a mobile AR channel that is used during construction phase through implementing a 4D “as-planned” phased model integrated with an augmented video showing real or planned progress. Findings The results from the project are then analysed and assessed to anticipate the potential of these and similar techniques for tracking time and cost on construction projects. Originality/value The proposed system through “BIM-U” and “BIM Phase” exploits the potential of mobile applications and AR in construction through the use of handheld mobile devices to offer new possibilities for measuring and monitoring work progress using building information modelling.


2018 ◽  
Vol 8 (4) ◽  
pp. 372-385 ◽  
Author(s):  
Ahmad Huzaimi Abd Jamil ◽  
Mohamad Syazli Fathi

Purpose Building information modeling (BIM) has been proven to enable outstanding results in construction processes by enhancing knowledge sharing with regard to a building or facility throughout its life cycle from the conceptual design to facility management. The purpose of this paper is to investigate the extent to which the use of BIM has impacted the legal and contractual implications of the existing construction contracts for aligning the three sets of relevant development domains: BIM functionality, contract procurement methods, and BIM legal and contractual issues to enhance the efficient use of valuable resources. Design/methodology/approach This exploratory study was undertaken by analyzing the literature using a novel approach involving a matrix that juxtaposes BIM functionalities for each project life cycle with contract procurement methods. As part of the study, 28 interactions of BIM legal and contractual issues have been identified, as representing positive and negative interactions. Findings The interaction matrix framework that juxtaposes BIM functionalities and procurement methods highlights the theoretical and practical relationships identified between the methods. It also simultaneously recognizes the constructive and destructive interactions between these development domains by means of critically identifying the possible interactions of the legal and contractual aspects of both the BIM project procurement and the practical aspects of BIM project delivery. Originality/value The present study contributes to the existing literature by extensively identifying the probable interactions of contractual issues within BIM functionality with contract procurement methods throughout the life cycle of a building construction project.


2019 ◽  
Vol 26 (4) ◽  
pp. 1210-1232 ◽  
Author(s):  
Timothy O. Olawumi ◽  
Daniel W.M. Chan

Purpose The purpose of this paper is to explore building information modeling (BIM) implementation and practices in developed economies by developing a benchmarking model that will enhance BIM adoption and implementation in developing countries. Design/methodology/approach The research design adopted a qualitative approach which includes the desktop review of the extant literature as well as case study reviews of ten BIM projects using an explanatory case study technique to form the foundation upon which the study proposed the model. The moving basis heuristics technique was adopted to develop the scoring system. Findings The BIM benchmarking model and assessment template were developed which consisted of three-level concepts modeled to aid project organizations and project team in developing countries to assess and score the level of improvement and implementation of BIM in a project. A desktop review of BIM projects in developed countries demonstrated the significant improvements and benefits possible through the implementation of the established BIM benchmarking model. Practical implications The assessment template in conjunction with the benchmarking model is useful for a comparative evaluation of similar BIM projects and benchmarking purposes. The study also discussed how current findings extends and contradicts previous findings. Originality/value The findings have provided policymakers, construction stakeholders and professional bodies in the construction industry in developing countries with valuable insights and counter-intuitive perspective that could facilitate the uptake of BIM in construction projects.


Sign in / Sign up

Export Citation Format

Share Document