scholarly journals The use of building information modelling by quantity surveyors in facilities management roles

2020 ◽  
Vol 27 (8) ◽  
pp. 1795-1812
Author(s):  
Melanie Stride ◽  
Carol K.H. Hon ◽  
Rui Liu ◽  
Bo Xia

PurposeAdoption of building information modelling (BIM) in facilities management (FM) provides an information platform to store and exchange asset data. Quantity Surveyors, with cost management expertise, are increasingly involved in FM roles in the operation phase. However, no study has been conducted on how BIM may assist Quantity Surveyors when contracted in FM roles. This study aims to identify the potential benefits and challenges of using BIM by Quantity Surveyors in FM roles.Design/methodology/approachInterviews were conducted with eight professionals from an international built and natural asset design and management company and its FM business partner in Australia.FindingsLack of complete and accurate data was the main issue faced by Quantity Surveyors in FM. The benefits of BIM in FM were digitizing and storing asset information and developing a cost database that would be useful for Quantity Surveyors, whereas challenges included keeping model data up to date, cost, industry resistance to change and contractors' lack of model use.Originality/valueThis study contributes to revealing the niche adoption of BIM by Quantity Surveyors in FM and identifying the issues faced by Quantity Surveyors in FM roles using BIM. It contributes to the knowledge of BIM adoption in post-construction. Findings will be useful to develop strategies for adopting BIM in FM and supporting Quantity Surveyors' roles in FM.

2018 ◽  
Vol 16 (4) ◽  
pp. 387-395 ◽  
Author(s):  
Daramola Thompson Olapade ◽  
Benjamin Gbolahan Ekemode

Purpose This paper aims to examine the awareness and utilisation of building information modelling (BIM) for facility management (FM) among FM companies in Lagos, Nigeria. This was with a view of increasing the awareness level and promoting adoption of BIM in FM practice. Design/methodology/approach Primary data used for the study were sourced through questionnaire administered on the 37 FM companies that are corporate members of International Facility Management Association in Lagos, Nigeria. Frequency distribution and relative significance index were used for data analysis. Findings Findings of the study suggest a low level of awareness and adoption of BIM for FM in the study area. Only 2 of the 31 FM companies surveyed were using BIM for their FM services. Also, the majority of the respondents (n = 22, 71 per cent) perceived that the awareness of BIM in the facilities management industry in Nigeria is very low. Practical implications The findings of this study provided industry stakeholders with information on the level of awareness and utilisation of BIM for FM practice in Nigeria, thereby giving insights on the possible integration of BIM with FM practices in developing countries. Originality/value The paper is a pioneer research on the awareness and utilisation of BIM for facilities management from the perspective of an emerging property market like Nigeria.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Ayman Ahmed Ezzat Othman ◽  
Fatma Othman Alamoudy

Purpose This paper aims to develop a framework for optimising building performance through the integration between risk management (RM) and building information modelling (BIM) during the design process. Design/methodology/approach To achieve this aim, a research strategy consisting of literature review, case studies and survey questionnaire is designed to accomplish four objectives. First, to examine the concepts of design process, building performance, RM and BIM; second, to present three case studies to explain the role of using RM and BIM capabilities towards optimising building performance; third, to investigate the perception and application of architectural design firms in Egypt towards the role of RM and BIM for enhancing building performance during the design process; and finally, to develop a framework integrating RM and BIM during the design process as an approach for optimising building performance. Findings Through literature review, the research identified 18 risks that hamper optimising building performance during the design process. In addition, 11 building performance values and 20 BIM technologies were defined. Results of data analysis showed that “Design budget overrun”, “Lack of considering life cycle cost” and “Inefficient use of the design time” were ranked the highest risks that affect the optimisation of building performance. Respondents ranked “Risk avoid” or “Risk transfer” as the most risk responses adopted in the Egyptian context. In addition, “BIM As Built” was ranked the highest BIM technology used for overcoming risks during the design process. These findings necessitated taking action towards developing a framework to optimising building performance. Originality/value The research identified the risks that affect optimising building performance during the design process. It focuses on improving the design process through using the capabilities of BIM technologies towards overcoming these risks during the design process. The proposed framework which integrates RM and BIM represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Zul-Atfi Bin Ismail

PurposeThe contemporary practice of conventional maintenance for industrialised building system (IBS) constructions suffers from poor service delivery and defect repetition. A key problem impeding the widespread adoption of emerging technologies is the lack of competent contractors to support the effectiveness of the technology implemented in conventional methods and to ensure returns on investment. The shortcomings of conventional methods are assessed from the perspective of IBS buildings. This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes.Design/methodology/approachThis paper describes the establishment of key problem areas, the elements involved in implementing good practice and the requirements for integrating maintenance management processes and information databases in the maintenance management system.FindingsConventional methods have little emphasis on defect diagnosis tools. They also enhance inadequate strategic decision-making in the analysis of information when attempting to improve the maintenance project outcomes for IBS construction. The characteristics identified in a case study of IBS buildings are presented and analysed.Originality/valueThe conclusions and recommendations drawn from the analysis of the IBS case study are discussed, synthesised and deliberated upon. The approach presented in this paper integrates various aspects of building information modelling technology to facilitate improved execution of IBS maintenance activities.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Ifeoluwa Benjamin Oluleye ◽  
Abiodun Kolawole Oyetunji ◽  
Michael Ayodele Olukolajo ◽  
Daniel W.M. Chan

Purpose Building information modelling (BIM) is a novel technological advancement in the built environment. Despite the potentials of BIM, its adoption and implementation are undermined in facility management (FM) operations. This might be because of limited information on the critical success factors (CSFs) that can enhance its adoption. The study aims to integrate building information modelling to improve facility management operation by adopting fuzzy synthetic approach for evaluating the critical success factors. Design/methodology/approach Data for the study were sourced from practising and registered facility managers within Lagos metropolis, Nigeria. The data collected were analysed using a combination of methods which include mean item score, factor analysis and fuzzy synthetic evaluation (FSE). Findings The factor analysis results showed that six underlying groups of CSFs would enhance the effective adoption of BIM in facility operations. The FSE results showed that out of the six groups, the three topmost important CSF grouping (CSFG) in the decision rule would enhance the effectiveness of BIM adoption for FM operations. Practical implications The result of this study provides a credible road map for facility managers, policymakers and other stakeholders in FM operations on the CSFs and CSFG required for the adoption of BIM. Originality/value Previous studies that aimed at integrating BIM into FM are limited. Hence, this study provides a broad perspective on the CSF required for BIM adoption and implementation in FM operations using the FSE approach.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Apeesada Sompolgrunk ◽  
Saeed Banihashemi ◽  
Saeed Reza Mohandes

Purpose The purpose of this study is to identify and analyse the key measurable returning factors, value drivers and strategic benefits associated with building information modelling (BIM) return on investment (ROI). The findings of this study provide researchers and practitioners with up-to-date information in formulating appropriate strategies to quantify the monetary value of BIM. The suggested research agenda provided would also advance what is presently a limited body of knowledge relating to the evaluation of BIM ROI. Design/methodology/approach To fill the identified gap, this study develops a comprehensive systematic review of mainstream studies on factors affecting BIM ROI published from 2000 to 2020. A total of 23 academic records from different sources such as journals, conference proceedings, dissertation and PhD theses were identified and thoroughly reviewed. Findings The reported BIM ROI ranged greatly from −83.3% to 39,900%. A total of 5 returning factors, namely, schedule reduction and compliance, productivity improvement, request for information reduction, rework reduction and change orders reduction were identified as the most commonly reported factors that influence BIM ROI. Four quantification techniques including general assumptions-based theoretical model, perceived BIM ROI based on survey, factors affecting BIM ROI with no reported ROI and quantified BIM ROI based on a case study were observed and pointed out in the review, together with their limitations. Finally, three major gaps were raised as the lack of consideration on the likelihood of BIM assisting in a construction project, intangible returning factors influencing BIM-based projects and industry standards in benchmarking BIM ROI. Practical implications The outcomes of this study would assist practitioners by providing the current evaluation techniques that address the limitations with BIM investment and present issues relating to the economic evaluation of BIM in the construction industry. It is also expected that presenting a deeper and wider perspective of the research work performed until now will direct a more focussed approach on productivity improvement efforts in the construction industry. Originality/value This study identifies and analyses the key measurable returning factors, value drivers and strategic benefits associated with BIM ROI on an industry scale rather than a particular organisation or a project scale.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Martin Evans ◽  
Peter Farrell

PurposeThe construction industry encounters substantial challenges in its evolution towards sustainable development and in the adoption of building information modelling (BIM) technology and lean construction (LC) practices on construction mega-projects. This research aims to investigate the critical barriers encountered by key construction stakeholders in their efforts to integrate BIM and LC in the construction mega-projects.Design/methodology/approachA two-round Delphi survey shaped the foundation of aggregating consensus between an expert panel that examined a set of 28 barriers resulting from a detailed analysis of the extant literature. Descriptive and inferential statistical tests were exploited for data analysis, and interrater agreement analysis was used to elaborated and validate results.FindingsThe research concluded that the key barriers by descending order of significance are lack of mandatory BIM and LC industry standards and regulations by the government, resistance of the industry to change from traditional practices to LeanBIM, high cost of software licenses and training and running of BIM.Originality/valueThe research findings and the proposed mitigation strategy will enhance the application of BIM and LC practices in construction mega-projects and allow project key stakeholders to place emphasis on tackling the crucial challenges and barriers identified in this research.


2019 ◽  
Vol 19 (3) ◽  
pp. 298-320 ◽  
Author(s):  
Maria Christina Georgiadou

Purpose This paper aims to present a state-of-the-art review of building information modelling (BIM) in the UK construction practice. In particular, the aim is to examine the scope, value and practical implications of BIM implementation in residential projects by evaluating practitioners’ perspectives working in the Greater London Area (GLA). Design/methodology/approach The paper outlines the general status quo of BIM adoption and maturity in the UK. It then discusses the feasibility of BIM use in residential projects drawing on an online survey and complementary semi-structured interviews with building professionals. The cross-comparison between the evidence base and literature review uncovers the specific benefits, challenges and risks to BIM implementation in the house building sector. Findings BIM is an evaluation methodology that helps the management of digital information throughout the project lifecycle. At a conceptual level, a BIM-enabled project offers quality assurance and on-time delivery, collaboration and communication improvement, visual representation and clash detection and whole lifecycle value. The findings, however, suggest that the most frequently reported benefits are related to collaboration and the blend of product (software) and process innovation, whilst lifecycle thinking and waste reduction are often overlooked. At present, there is widespread awareness on BIM but with a financial barrier to invest in developing digital capabilities, particularly for small- and medium-sized enterprises. Practical implications The paper concludes with a critical commentary on the lack of strategic leadership in both the supply and demand side. The role of policy to streamline commercial drivers for whole lifecycle costing in procurement is endorsed to drive the change management required to address the short-term mind-set of senior management and wider fragmentation of the construction industry, also serving as a research question for further research and development in the field. Originality/value There are relatively few studies evaluating BIM perspectives in UK residential projects. This paper explores the feasibility and “real-life” value of BIM in housing practice, drawing on views and experiences of building professionals in GLA. In particular, the research findings provide an evidence base evaluating the extent to which the house building industry has the expertise and capability to operate in a BIM environment and to comply with the Level 2 mandate and explore which of the generic barriers and drivers of BIM-readiness are more relevant to the design and construction of housing projects.


2020 ◽  
Vol 18 (3) ◽  
pp. 195-212
Author(s):  
Moshabab Aljarman ◽  
Halim Boussabaine ◽  
Khalid Almarri

Purpose Building information modelling (BIM) is not without risk, as the greater reliance on information technology has associated technical risks. Thus, the purpose of this paper is to assess the perceptions of the users of BIM regarding the likelihood of emergence of technical risks which might influence the successful application of BIM, to facilitate the successful implementation of BIM in the construction industry. Design/methodology/approach The primary data were collected via a questionnaire to document the BIM risks, where 105 responses were recorded from constructors, consultants, cost consultants and other professionals from the UK construction industry. Subsequently, the analysis of the results was driven by univariate and inferential statistics (ANOVA) to assess the perception of risk emergence. Findings The study found the most likely technical risks that might emerge from BIM application. These risks are complexity of transferring modelling data from one program to another, lack of understanding of the BIM for the different software platforms, interoperability shortcomings, failure to discover errors in the model and risks of different software platforms. Practical implications The results will certainly intensify the discussion about BIM risks, risk allocation and all other aspects that are related to BIM contractual processes. Also, the compiled list of risks will help stakeholders in assessing financial implications that may result from BIM application. Originality/value Important technical risks have been identified in the application of BIM. This renders a new understanding of the risks that might influence the successful application of BIM. The respondents generally agreed on the importance of the following risks: “complexity of transferring modelling data between programs from one program to another”, “lack of understanding of the BIM for the different software platforms”, “interoperability shortcomings”, “failure to discover errors in the model” and “risks of different software platforms”, which are in line with current literature.


2017 ◽  
Vol 15 (1) ◽  
pp. 15-34 ◽  
Author(s):  
Olufolahan Oduyemi ◽  
Michael Iheoma Okoroh ◽  
Oluwaseun Samuel Fajana

Purpose The purpose of this paper is to explore and rank the benefits and barriers (technological and non-technological) of using Building Information Modelling (BIM) in sustainable building design. It also employs the use of a design tool analysis of a case study using BIM compatible tools (Ecotect and Green Building Studio) to determine the environmental performance of a proposed multi-use building at Derby North. Design/methodology/approach The paper explores the benefits and barriers of using BIM through a literature review. Regression and factor analysis were used to rank these benefits and barriers. A questionnaire was distributed to a sample of 120 practitioners with 69 completing the survey. Finally, the paper employs the use of a design tool analysis of a case study using BIM-compatible tools (Ecotect and Green Building Studio) to determine the environmental performance of a proposed multi-use building at Derby North riverside. Findings The key findings of the statistical analysis indicated that professionals ranked the integrated project delivery as the most established benefit, while the lack of interoperability was ranked the greatest technological challenge. Only three of the attributes of non-technological challenges made statistically unique contributions, namely, training costs and software costs, client demand and potential legal issues. It was also discovered that BIM delivers information needed for environmental performance. In a forward-looking approach, the paper attempts to provide some recommendations that would encourage the continuous application of BIM in sustainable building design. Research limitations/implications This paper does not cover all features of BIM functionality, as the scope of BIM is very enormous and the resources of this research were limited. Practical implications The implication of the study is that it will assist in exploring and ranking the benefits and barriers (technological and non-technological) of using BIM while proffering recommendations for future use. This research will be of interest to industry practitioners and academic researchers with an interest in building information modelling. Originality/value This paper contributes with new outlooks aimed at syndicating sustainability with environmental performance and adds to the limited empirical studies on the benefits and barriers of the application of BIM.


Sign in / Sign up

Export Citation Format

Share Document