Barriers to integrating building information modelling (BIM) and lean construction practices on construction mega-projects: a Delphi study

2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Martin Evans ◽  
Peter Farrell

PurposeThe construction industry encounters substantial challenges in its evolution towards sustainable development and in the adoption of building information modelling (BIM) technology and lean construction (LC) practices on construction mega-projects. This research aims to investigate the critical barriers encountered by key construction stakeholders in their efforts to integrate BIM and LC in the construction mega-projects.Design/methodology/approachA two-round Delphi survey shaped the foundation of aggregating consensus between an expert panel that examined a set of 28 barriers resulting from a detailed analysis of the extant literature. Descriptive and inferential statistical tests were exploited for data analysis, and interrater agreement analysis was used to elaborated and validate results.FindingsThe research concluded that the key barriers by descending order of significance are lack of mandatory BIM and LC industry standards and regulations by the government, resistance of the industry to change from traditional practices to LeanBIM, high cost of software licenses and training and running of BIM.Originality/valueThe research findings and the proposed mitigation strategy will enhance the application of BIM and LC practices in construction mega-projects and allow project key stakeholders to place emphasis on tackling the crucial challenges and barriers identified in this research.

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Martin Evans ◽  
Peter Farrell ◽  
Wael Zewein ◽  
Ayman Mashali

Purpose The construction industry encounters substantial challenges in its evolution towards sustainable development and to the adoption of building information modelling (BIM) technology and lean construction (LC) practices on construction mega-projects. This study aims to present critical challenges and to investigate the interactions of BIM and LC on construction mega-projects encountered by key stakeholders in their efforts to integrate BIM and LC. Design/methodology/approach A qualitative research approach is adopted to introduce and validate LC principles and BIM functionalities resulting from a detailed analysis of extant literature, followed by a conceptual analysis of the interactions between BIM and LC on construction mega-projects. A quantitative questionnaire survey is then used. Descriptive and inferential statistical tests are used for data analysis, and analysis of variance tests elaborate and validate results. Findings The research yielded ten BIM functionalities and ten LC principles, which are categorised in four principle areas and four BIM functionality groups. A research framework for analysis of the interaction between BIM and LC is then compiled. Originality/value Research findings and the proposed framework will enhance the adoption of BIM and LC practices on construction mega-projects and allow project key stakeholders to place emphasis on tackling crucial challenges and barriers identified in this research. The framework will guide and stimulate research; and as such, the approach adopted up to this point is constructive. The identified interactions between BIM and LC on construction mega-projects show positive synergies between the two.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Martin Evans ◽  
Peter Farrell ◽  
Ayman Mashali ◽  
Wael Zewein

Purpose The purpose of this paper is to investigate critical success factors (CSFs) that enhance integration between building information modelling (BIM) and lean construction (LC) practices on construction mega-projects. BIM and LC have gained momentum in the past decade. Design/methodology/approach The Delphi survey technique was used to gauge opinions of a panel of 16 experts through a two-round Delphi questionnaire survey. Panel responses were scrutinised using inferential and descriptive statistical techniques. Findings In total, 30 CSFs were identified in the literature. The top ranked factor out of 30 that supports LeanBIM synergy was “collaboration in design, construction works and engineering management”. Other top rated CSFs were centric on people, data and technology elements. The research findings are important for project stakeholders, organisations, contractors, engineers and local authorities who implement LC and BIM synergies in construction mega-projects. Originality/value The research findings are important for project stakeholders, organisations, contractors, engineers and local authorities who implement LC and BIM synergies in construction mega-projects. The research recommends further hands-on training to increase the integration of BIM and LC practices in the architecture, engineering and construction industry and to enrich the extant body of knowledge in construction of mega-projects.


2019 ◽  
Vol 19 (2) ◽  
pp. 170-192 ◽  
Author(s):  
Abdul-Majeed Mahamadu ◽  
Lamine Mahdjoubi ◽  
Colin Booth ◽  
Patrick Manu ◽  
Emmanuel Manu

PurposeIn spite of emerging research on building information modelling (BIM) capability assessment, there is a general dearth of knowledge about the links between often pre-emptive capability measurement attributes and actual delivery success. More so, current studies have not considered success from the wider construction supply chain (CSC) perspective. So far, the perceived importance of capability metrics is not based on post-project evaluations of their contribution to BIM delivery success. This paper aims to identify relevant BIM capability attributes used for qualifying CSC organisations for projects and further aims to investigate their relative importance and influence on some key aspects of BIM delivery success.Design/methodology/approachBased on heretofore validated set of BIM capability attributes from semi-structured interviews and a Delphi study, a survey of CSC firms on BIM-enabled projects was used to model the influence of BIM capability attributes on BIM delivery success. Multiple regression modelling was performed to ascertain the nature of the relationship between BIM capability attributes and the key aspects of BIM delivery success as identified from the literature.FindingsBIM staff experience and the suitability of proposed methodology prior to project commencement were identified as the most influential on BIM delivery quality, as well as delivery within schedule and on budget. Conversely, the administrative and strategic-level capacities were found as the most influential in leveraging collaboration, coordination or integration of the CSC on projects through BIM.Originality/valueThis study provides a step change in prioritising BIM capability criteria based on evidence of their contribution to delivery success in key performance areas, rather than their perceived importance as capability metrics as widely practised.


2019 ◽  
Vol 26 (11) ◽  
pp. 2682-2704 ◽  
Author(s):  
Dingayo Mzyece ◽  
Issaka E. Ndekugri ◽  
Nii A. Ankrah

PurposeBuilding information modelling (BIM) has received wide coverage within the research, academic and industry communities over the last decade. Yet, its degree of integration with various industry standards in the architecture, engineering and construction sector varies extensively. An exploratory research approach explores the interoperability between the construction design and management (CDM) regulations and BIM. The paper aims to discuss this issue.Design/methodology/approachThe research design comprised: a methodical “state-of-the-art” review of extant literature – exploring some 19 variables emerging from the literature review; detailed content analyses of the current CDM regime (CDM 2015); and conducting a “test” to map and determine the degree of interoperability between BIM and CDM. The study develops several meta-matrices and a framework for BIM and CDM interoperability.FindingsNew insight reveals that BIM provides a systematic approach for the discharge of CDM obligations. The framework developed is easily transferable into BIM common data environments (CDEs) and offers an expeditious discharge of CDM obligations.Research limitations/implicationsSome features of the developed BIM/CDM interoperability framework invite further tests to predicate the degree of discharge of CDM obligations. Duties related to provision of pre-construction information invite further research.Originality/valueLittle research provides insight into the interoperability of BIM and the CDM regulations. Therefore, this study contributes to the knowledge relating to the degree of interoperability of BIM in construction systems, processes and standards.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Ayman Ahmed Ezzat Othman ◽  
Fatma Othman Alamoudy

Purpose This paper aims to develop a framework for optimising building performance through the integration between risk management (RM) and building information modelling (BIM) during the design process. Design/methodology/approach To achieve this aim, a research strategy consisting of literature review, case studies and survey questionnaire is designed to accomplish four objectives. First, to examine the concepts of design process, building performance, RM and BIM; second, to present three case studies to explain the role of using RM and BIM capabilities towards optimising building performance; third, to investigate the perception and application of architectural design firms in Egypt towards the role of RM and BIM for enhancing building performance during the design process; and finally, to develop a framework integrating RM and BIM during the design process as an approach for optimising building performance. Findings Through literature review, the research identified 18 risks that hamper optimising building performance during the design process. In addition, 11 building performance values and 20 BIM technologies were defined. Results of data analysis showed that “Design budget overrun”, “Lack of considering life cycle cost” and “Inefficient use of the design time” were ranked the highest risks that affect the optimisation of building performance. Respondents ranked “Risk avoid” or “Risk transfer” as the most risk responses adopted in the Egyptian context. In addition, “BIM As Built” was ranked the highest BIM technology used for overcoming risks during the design process. These findings necessitated taking action towards developing a framework to optimising building performance. Originality/value The research identified the risks that affect optimising building performance during the design process. It focuses on improving the design process through using the capabilities of BIM technologies towards overcoming these risks during the design process. The proposed framework which integrates RM and BIM represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Zul-Atfi Bin Ismail

PurposeThe contemporary practice of conventional maintenance for industrialised building system (IBS) constructions suffers from poor service delivery and defect repetition. A key problem impeding the widespread adoption of emerging technologies is the lack of competent contractors to support the effectiveness of the technology implemented in conventional methods and to ensure returns on investment. The shortcomings of conventional methods are assessed from the perspective of IBS buildings. This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes.Design/methodology/approachThis paper describes the establishment of key problem areas, the elements involved in implementing good practice and the requirements for integrating maintenance management processes and information databases in the maintenance management system.FindingsConventional methods have little emphasis on defect diagnosis tools. They also enhance inadequate strategic decision-making in the analysis of information when attempting to improve the maintenance project outcomes for IBS construction. The characteristics identified in a case study of IBS buildings are presented and analysed.Originality/valueThe conclusions and recommendations drawn from the analysis of the IBS case study are discussed, synthesised and deliberated upon. The approach presented in this paper integrates various aspects of building information modelling technology to facilitate improved execution of IBS maintenance activities.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Ifeoluwa Benjamin Oluleye ◽  
Abiodun Kolawole Oyetunji ◽  
Michael Ayodele Olukolajo ◽  
Daniel W.M. Chan

Purpose Building information modelling (BIM) is a novel technological advancement in the built environment. Despite the potentials of BIM, its adoption and implementation are undermined in facility management (FM) operations. This might be because of limited information on the critical success factors (CSFs) that can enhance its adoption. The study aims to integrate building information modelling to improve facility management operation by adopting fuzzy synthetic approach for evaluating the critical success factors. Design/methodology/approach Data for the study were sourced from practising and registered facility managers within Lagos metropolis, Nigeria. The data collected were analysed using a combination of methods which include mean item score, factor analysis and fuzzy synthetic evaluation (FSE). Findings The factor analysis results showed that six underlying groups of CSFs would enhance the effective adoption of BIM in facility operations. The FSE results showed that out of the six groups, the three topmost important CSF grouping (CSFG) in the decision rule would enhance the effectiveness of BIM adoption for FM operations. Practical implications The result of this study provides a credible road map for facility managers, policymakers and other stakeholders in FM operations on the CSFs and CSFG required for the adoption of BIM. Originality/value Previous studies that aimed at integrating BIM into FM are limited. Hence, this study provides a broad perspective on the CSF required for BIM adoption and implementation in FM operations using the FSE approach.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Apeesada Sompolgrunk ◽  
Saeed Banihashemi ◽  
Saeed Reza Mohandes

Purpose The purpose of this study is to identify and analyse the key measurable returning factors, value drivers and strategic benefits associated with building information modelling (BIM) return on investment (ROI). The findings of this study provide researchers and practitioners with up-to-date information in formulating appropriate strategies to quantify the monetary value of BIM. The suggested research agenda provided would also advance what is presently a limited body of knowledge relating to the evaluation of BIM ROI. Design/methodology/approach To fill the identified gap, this study develops a comprehensive systematic review of mainstream studies on factors affecting BIM ROI published from 2000 to 2020. A total of 23 academic records from different sources such as journals, conference proceedings, dissertation and PhD theses were identified and thoroughly reviewed. Findings The reported BIM ROI ranged greatly from −83.3% to 39,900%. A total of 5 returning factors, namely, schedule reduction and compliance, productivity improvement, request for information reduction, rework reduction and change orders reduction were identified as the most commonly reported factors that influence BIM ROI. Four quantification techniques including general assumptions-based theoretical model, perceived BIM ROI based on survey, factors affecting BIM ROI with no reported ROI and quantified BIM ROI based on a case study were observed and pointed out in the review, together with their limitations. Finally, three major gaps were raised as the lack of consideration on the likelihood of BIM assisting in a construction project, intangible returning factors influencing BIM-based projects and industry standards in benchmarking BIM ROI. Practical implications The outcomes of this study would assist practitioners by providing the current evaluation techniques that address the limitations with BIM investment and present issues relating to the economic evaluation of BIM in the construction industry. It is also expected that presenting a deeper and wider perspective of the research work performed until now will direct a more focussed approach on productivity improvement efforts in the construction industry. Originality/value This study identifies and analyses the key measurable returning factors, value drivers and strategic benefits associated with BIM ROI on an industry scale rather than a particular organisation or a project scale.


2019 ◽  
Vol 266 ◽  
pp. 05003
Author(s):  
Khairool Aizat Ahmad Jamal ◽  
Mohammad Fadhil Mohammad ◽  
Norfashiha Hashim ◽  
Mohamed Rizal Mohamed ◽  
Mohd Adib Ramli

Malaysia is experiencing high economic growth which requires the construction industry to fulfill development demands. Building Information Modelling (BIM) had been widely publicized by the government in order to increase the industry’s productivity by instigating numerous initiatives aimed to spearhead its progression. In contrast with the aspiration, architects as key players of construction industry are still facing issues in adopting BIM into practice. Previous researches had broadly covered about BIM in construction industry, but few concentrations in specific to the local architect thus imposing gap of knowledge. In addressing the issues, the research aim to probe the current state of BIM implementation, primarily on the challenges that hinders its adoption. The BIM factors which covers people, process, policy and technology were derived and investigated through the use of 322 questionnaires distributed to architects at management and operational level. The study revealed the key barriers that contributes towards the problem is within the people factor, where majority highlighted the lacked of skilled and experienced BIM workforce which contributes towards steep learning environment as well as high cost of applying BIM. Consequently, several key strategic solutions had been indicated through both external and internal factors in addressing the challenge of BIM. Results suggested that there is a need of further support from the industry’s professional bodies, development of legal instruments, BIM enforcement, specific BIM education as well as BIM R&D programs.


2019 ◽  
Vol 19 (3) ◽  
pp. 298-320 ◽  
Author(s):  
Maria Christina Georgiadou

Purpose This paper aims to present a state-of-the-art review of building information modelling (BIM) in the UK construction practice. In particular, the aim is to examine the scope, value and practical implications of BIM implementation in residential projects by evaluating practitioners’ perspectives working in the Greater London Area (GLA). Design/methodology/approach The paper outlines the general status quo of BIM adoption and maturity in the UK. It then discusses the feasibility of BIM use in residential projects drawing on an online survey and complementary semi-structured interviews with building professionals. The cross-comparison between the evidence base and literature review uncovers the specific benefits, challenges and risks to BIM implementation in the house building sector. Findings BIM is an evaluation methodology that helps the management of digital information throughout the project lifecycle. At a conceptual level, a BIM-enabled project offers quality assurance and on-time delivery, collaboration and communication improvement, visual representation and clash detection and whole lifecycle value. The findings, however, suggest that the most frequently reported benefits are related to collaboration and the blend of product (software) and process innovation, whilst lifecycle thinking and waste reduction are often overlooked. At present, there is widespread awareness on BIM but with a financial barrier to invest in developing digital capabilities, particularly for small- and medium-sized enterprises. Practical implications The paper concludes with a critical commentary on the lack of strategic leadership in both the supply and demand side. The role of policy to streamline commercial drivers for whole lifecycle costing in procurement is endorsed to drive the change management required to address the short-term mind-set of senior management and wider fragmentation of the construction industry, also serving as a research question for further research and development in the field. Originality/value There are relatively few studies evaluating BIM perspectives in UK residential projects. This paper explores the feasibility and “real-life” value of BIM in housing practice, drawing on views and experiences of building professionals in GLA. In particular, the research findings provide an evidence base evaluating the extent to which the house building industry has the expertise and capability to operate in a BIM environment and to comply with the Level 2 mandate and explore which of the generic barriers and drivers of BIM-readiness are more relevant to the design and construction of housing projects.