A flexible mathematical model for crew pairing optimization to generate n-day pairings considering the risk of COVID-19: a real case study

Kybernetes ◽  
2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Bahareh Shafipour-Omrani ◽  
Alireza Rashidi Komijan ◽  
Seyed Jafar Sadjadi ◽  
Kaveh Khalili-Damghani ◽  
Vahidreza Ghezavati

PurposeOne of the main advantages of the proposed model is that it is flexible to generate n-day pairings simultaneously. It means that, despite previous researches, one-day to n-day pairings can be generated in a single model. The flexibility in generating parings causes that the proposed model leads to better solutions compared to existing models. Another advantage of the model is minimizing the risk of COVID-19 by limitation of daily flights as well as elapsed time minimization. As airports are among high risk places in COVID-19 pandemic, minimization of infection risk is considered in this model for the first time. Genetic algorithm is used as the solution approach, and its efficiency is compared to GAMS in small and medium-size problems.Design/methodology/approachOne of the most complex issues in airlines is crew scheduling problem which is divided into two subproblems: crew pairing problem (CPP) and crew rostering problem (CRP). Generating crew pairings is a tremendous and exhausting task as millions of pairings may be generated for an airline. Moreover, crew cost has the largest share in total cost of airlines after fuel cost. As a result, crew scheduling with the aim of cost minimization is one of the most important issues in airlines. In this paper, a new bi-objective mixed integer programming model is proposed to generate pairings in such a way that deadhead cost, crew cost and the risk of COVID-19 are minimized.FindingsThe proposed model is applied for domestic flights of Iran Air airline. The results of the study indicate that genetic algorithm solutions have only 0.414 and 0.380 gap on average to optimum values of the first and the second objective functions, respectively. Due to the flexibility of the proposed model, it improves solutions resulted from existing models with fixed-duty pairings. Crew cost is decreased by 12.82, 24.72, 4.05 and 14.86% compared to one-duty to four-duty models. In detail, crew salary is improved by 12.85, 24.64, 4.07 and 14.91% and deadhead cost is decreased by 11.87, 26.98, 3.27, and 13.35% compared to one-duty to four-duty models, respectively.Originality/valueThe authors confirm that it is an original paper, has not been published elsewhere and is not currently under consideration of any other journal.

2018 ◽  
Vol 29 (4) ◽  
pp. 1279-1305 ◽  
Author(s):  
Shengbin Wang ◽  
Feng Liu ◽  
Lian Lian ◽  
Yuan Hong ◽  
Haozhe Chen

Purpose The purpose of this paper is to solve a post-disaster humanitarian logistics problem in which medical assistance teams are dispatched and the relief supplies are distributed among demand points. Design/methodology/approach A mixed integer-programming model and a two-stage hybrid metaheuristic method are developed to solve the problem. Problem instances of various sizes as well as a numerical example based on the 2016 Kyushu Earthquake in Japan are used to test the proposed model and algorithm. Findings Computational results based on comparisons with the state-of-the-art commercial software show that the proposed approach can quickly find near-optimal solutions, which is highly desirable in emergency situations. Research limitations/implications Real data of the parameters of the model are difficult to obtain. Future collaborations with organizations such as Red Cross and Federal Emergency Management Agency can be extremely helpful in collecting data in humanitarian logistics research. Practical implications The proposed model and algorithm can help governments and non-governmental organizations (NGOs) to effectively and efficiently allocate and coordinate different types of humanitarian relief resources, especially when these resources are limited. Originality/value This paper is among the first ones to consider both medical team scheduling (routing) and relief aid distribution as decision variables in the humanitarian logistics field. The contributions include developing a mathematical model and a heuristic algorithm, illustrating the model and algorithm using a numerical example, and providing a decision support tool for governments and NGOs to manage the relief resources in disasters.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mohammad Khalilzadeh

Purpose This study aims to develop a mathematical programming model for preemptive multi-mode resource-constrained project scheduling problems in construction with the objective of levelling resources considering renewable and non-renewable resources. Design/methodology/approach The proposed model was solved by the exact method and the genetic algorithm integrated with the solution modification procedure coded with MATLAB software. The Taguchi method was applied for setting the parameters of the genetic algorithm. Different numerical examples were used to show the validation of the proposed model and the capability of the genetic algorithm in solving large-sized problems. In addition, the sensitivity analysis of two parameters, including resource factor and order strength, was conducted to investigate their impact on computational time. Findings The results showed that preemptive activities obtained better results than non-preemptive activities. In addition, the validity of the genetic algorithm was evaluated by comparing its solutions to the ones of the exact methods. Although the exact method could not find the optimal solution for large-scale problems, the genetic algorithm obtained close to optimal solutions within a short computational time. Moreover, the findings demonstrated that the genetic algorithm was capable of achieving optimal solutions for small-sized problems. The proposed model assists construction project practitioners with developing a realistic project schedule to better estimate the project completion time and minimize fluctuations in resource usage during the entire project horizon. Originality/value There has been no study considering the interruption of multi-mode activities with fluctuations in resource usage over an entire project horizon. In this regard, fluctuations in resource consumption are an important issue that needs the attention of project planners.


2013 ◽  
Vol 2013 ◽  
pp. 1-9 ◽  
Author(s):  
Seyed Mahdi Homayouni ◽  
Sai Hong Tang

According to previous researches, automated guided vehicles and quay cranes in container terminals have a high potential synergy. In this paper, a mixed integer programming model is formulated to optimize the coordinated scheduling of cranes and vehicles in container terminals. Objectives of the model are to minimize total traveling time of the vehicles and delays in tasks of cranes. A genetic algorithm is developed to solve the problem in reasonable computational time. The most appropriate control parameters for the proposed genetic algorithm are investigated in a medium size numerical test case. It is shown that balanced crossover and mutation rates have the best performance in finding a near optimal solution for the problem. Then, ten small size test cases are solved to evaluate the performance of the proposed optimization methods. The results show the applicability of the genetic algorithm since it can find near optimal solutions, precisely and accurately.


2019 ◽  
Vol 120 (2) ◽  
pp. 253-264 ◽  
Author(s):  
Junliang He ◽  
Hang Yu ◽  
Caimao Tan ◽  
Wei Yan ◽  
Chao Jiang

Purpose The development of mega container ships and operational pressures puts forward higher requirements on the operational ability of the container terminal. Accordingly, the purpose of this paper is to propose an effective method for quay crane (QC) scheduling of multiple hatches vessel considering double-cycling strategy to improve the operation efficiency and reduce the risk of delay. Design/methodology/approach A mixed integer programming model, which covers the main operational constraints in a container terminal, is formulated to solve the quay crane scheduling problem (QCSP) with a novel objective. Findings A case study is presented and a number of numerical experiments are conducted to validate the effectiveness of the proposed model. Meanwhile, management insights are proposed. The results demonstrate that the proposed method can efficiently solve QCSP in a container terminal, and an interesting finding is that reducing the stack layers on the vessel can improve the operation efficiency of QC. Originality/value A new mathematical model is proposed for QC scheduling at the operational level, which considers the constraints of double-cycling strategy, multiple hatches and hatch covers. The proposed model also provides methods to research the QC double-cycling problem considering the balance between energy cost and operation efficiency.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mehnoosh Soleimani ◽  
Mohammad Khalilzadeh ◽  
Arman Bahari ◽  
Ali Heidary

Purpose One of the practical issues in the area of location and allocation is the location of the hub. In recent years, exchange rates have fluctuated sharply for a number of reasons such as sanctions against the country. Natural disasters that have occurred in recent years caused delays in hub servicing. The purpose of this study is to develop a mathematical programming model to minimize costs, maximize social responsibility and minimize fuel consumption so that in the event of a disruption in the main hub, the flow of materials can be directed to its backup hub to prevent delays in flow between nodes and disruptions in hubs. Design/methodology/approach A multi-objective mathematical programming model is developed considering uncertainty in some parameters, especially cost as fuzzy numbers. In addition, backup hubs are selected for each primary hub to deal with disruption and natural disasters and prevent delays. Then, a robust possibilistic method is proposed to deal with uncertainty. As the hub location-allocation problem is considered as NP-Hard problems so that exact methods cannot solve them in large sizes, two metaheuristic algorithms including a non-dominated sorting genetic algorithm non-dominated sorting genetic algorithm (NSGA-II) and multi-objective particle swarm optimization (MOPSO) are applied to tackle the problem. Findings Numerical results show the proposed model is valid. Also, they demonstrate that the NSGA-II algorithm outperforms the MOPSO algorithm. Practical implications The proposed model was implemented in one of the largest food companies in Iran, which has numerous products manufactured in different cities, to seek the hub locations. Also, due to several reasons such as road traffic and route type the difference in the rate of fuel consumption between nodes, this model helps managers and decision-makers to choose the best locations to have the least fuel consumption. Moreover, as the hub set up increases the employment rate in that city and has social benefits as it requires hiring some staff. Originality/value This paper investigates the hub location problem considering backup hubs with multiple objective functions to deal with disruption and uncertainty. Also, this study examines how non-hub nodes are assigned to hub nodes.


Electronics ◽  
2021 ◽  
Vol 10 (12) ◽  
pp. 1452
Author(s):  
Cristian Mateo Castiblanco-Pérez ◽  
David Esteban Toro-Rodríguez ◽  
Oscar Danilo Montoya ◽  
Diego Armando Giral-Ramírez

In this paper, we propose a new discrete-continuous codification of the Chu–Beasley genetic algorithm to address the optimal placement and sizing problem of the distribution static compensators (D-STATCOM) in electrical distribution grids. The discrete part of the codification determines the nodes where D-STATCOM will be installed. The continuous part of the codification regulates their sizes. The objective function considered in this study is the minimization of the annual operative costs regarding energy losses and installation investments in D-STATCOM. This objective function is subject to the classical power balance constraints and devices’ capabilities. The proposed discrete-continuous version of the genetic algorithm solves the mixed-integer non-linear programming model that the classical power balance generates. Numerical validations in the 33 test feeder with radial and meshed configurations show that the proposed approach effectively minimizes the annual operating costs of the grid. In addition, the GAMS software compares the results of the proposed optimization method, which allows demonstrating its efficiency and robustness.


2021 ◽  
Vol 13 (3) ◽  
pp. 1190
Author(s):  
Gang Ren ◽  
Xiaohan Wang ◽  
Jiaxin Cai ◽  
Shujuan Guo

The integrated allocation and scheduling of handling resources are crucial problems in the railway container terminal (RCT). We investigate the integrated optimization problem for handling resources of the crane area, dual-gantry crane (GC), and internal trucks (ITs). A creative handling scheme is proposed to reduce the long-distance, full-loaded movement of GCs by making use of the advantages of ITs. Based on this scheme, we propose a flexible crossing crane area to balance the workload of dual-GC. Decomposing the integrated problem into four sub-problems, a multi-objective mixed-integer programming model (MIP) is developed. By analyzing the characteristic of the integrated problem, a three-layer hybrid heuristic algorithm (TLHHA) incorporating heuristic rule (HR), elite co-evolution genetic algorithm (ECEGA), greedy rule (GR), and simulated annealing (SA) is designed for solving the problem. Numerical experiments were conducted to verify the effectiveness of the proposed model and algorithm. The results show that the proposed algorithm has excellent searching ability, and the simultaneous optimization scheme could ensure the requirements for efficiency, effectiveness, and energy-saving, as well as the balance rate of dual-GC.


2017 ◽  
Vol 2 (2) ◽  
pp. 114-125 ◽  
Author(s):  
Jianfeng Zheng ◽  
Cong Fu ◽  
Haibo Kuang

Purpose This paper aims to investigate the location of regional and international hub ports in liner shipping by proposing a hierarchical hub location problem. Design/methodology/approach This paper develops a mixed-integer linear programming model for the authors’ proposed problem. Numerical experiments based on a realistic Asia-Europe-Oceania liner shipping network are carried out to account for the effectiveness of this model. Findings The results show that one international hub port (i.e. Rotterdam) and one regional hub port (i.e. Zeebrugge) are opened in Europe. Two international hub ports (i.e. Sokhna and Salalah) are located in Western Asia, where no regional hub port is established. One international hub port (i.e. Colombo) and one regional hub port (i.e. Cochin) are opened in Southern Asia. One international hub port (i.e. Singapore) and one regional hub port (i.e. Jakarta) are opened in Southeastern Asia and Australia. Three international hub ports (i.e. Hong Kong, Shanghai and Yokohama) and two regional hub ports (i.e. Qingdao and Kwangyang) are opened in Eastern Asia. Originality/value This paper proposes a hierarchical hub location problem, in which the authors distinguish between regional and international hub ports in liner shipping. Moreover, scale economies in ship size are considered. Furthermore, the proposed problem introduces the main ports.


2014 ◽  
Vol 931-932 ◽  
pp. 578-582
Author(s):  
Sunarin Chanta ◽  
Ornurai Sangsawang

In this paper, we proposed an optimization model that addresses the evacuation routing problem for flood disaster when evacuees trying to move from affected areas to safe places using public transportation. A focus is on the situation of evacuating during high water level when special high vehicles are needed. The objective is to minimize the total traveled distance through evacuation periods where a limited number of vehicles is given. We formulated the problem as a mixed integer programming model based on the capacitated vehicle routing problem with multiple evcuation periods where demand changing by the time. The proposed model has been tested on a real-world case study affected by the severe flooding in Thailand, 2011.


2021 ◽  
Vol 11 (2) ◽  
pp. 178-193
Author(s):  
Juliana Emidio ◽  
Rafael Lima ◽  
Camila Leal ◽  
Grasiele Madrona

PurposeThe dairy industry needs to make important decisions regarding its supply chain. In a context with many available suppliers, deciding which of them will be part of the supply chain and deciding when to buy raw milk is key to the supply chain performance. This study aims to propose a mathematical model to support milk supply decisions. In addition to determining which producers should be chosen as suppliers, the model decides on a milk pickup schedule over a planning horizon. The model addresses production decisions, inventory, setup and the use of by-products generated in the raw milk processing.Design/methodology/approachThe model was formulated using mixed integer linear programming, tested with randomly generated instances of various sizes and solved using the Gurobi Solver. Instances were generated using parameters obtained from a company that manufactures dairy products to test the model in a more realistic scenario.FindingsThe results show that the proposed model can be solved with real-world sized instances in short computational times and yielding high quality results. Hence, companies can adopt this model to reduce transportation, production and inventory costs by supporting decision making throughout their supply chains.Originality/valueThe novelty of the proposed model stems from the ability to integrate milk pickup and production planning of dairy products, thus being more comprehensive than the models currently available in the literature. Additionally, the model also considers by-products, which can be used as inputs for other products.


Sign in / Sign up

Export Citation Format

Share Document