gantry crane
Recently Published Documents


TOTAL DOCUMENTS

409
(FIVE YEARS 101)

H-INDEX

18
(FIVE YEARS 2)

2022 ◽  
Vol 119 ◽  
pp. 104980
Author(s):  
Johannes Diwold ◽  
Bernd Kolar ◽  
Markus Schöberl
Keyword(s):  

Author(s):  
Jin-Gon Kim ◽  
Hyun-Joong Yoon ◽  
Yong-Kuk Park

2022 ◽  
Vol 2022 ◽  
pp. 1-14
Author(s):  
Qihui Peng ◽  
Wen-ming Cheng ◽  
Peng Guo ◽  
Hongyu Jia

Assessing the seismic performance of the gantry crane is significant since the structure is more vulnerable to earthquakes with the increase in size and lifting weight capacity. This paper aims to investigate the seismic response of the gantry crane incorporating near-field ground motions using incremental dynamic and endurance time analysis (IDA and ETA) methods. To model the structure accurately, a nonlinear finite element model of the gantry crane considering the viscoelastic effect is developed in the OpenSees platform. Then, the IDA method is also carried out for a comparison with the ETA method. The results of the two methods are consistent with a correlation of 93.9% while the computational demand of the ETA method is much less than those of the IDA method. To study further, both the seismic incident angle and the application of viscous dampers using the Maxwell model are analyzed and discussed in detail. The results show that seismic incident angle has a distinct influence on the maximum seismic displacement and viscous dampers can significantly reduce the seismic demand of the gantry crane. These findings support the seismic design of gantry cranes and evaluate the structural seismic performance efficiently.


2022 ◽  
Vol 163 ◽  
pp. 108199
Author(s):  
Ievgen Golovin ◽  
Anton Maksakov ◽  
Myroslav Shysh ◽  
Stefan Palis
Keyword(s):  

2022 ◽  
Vol 1212 (1) ◽  
pp. 012049
Author(s):  
H Wijaya ◽  
A Y Ridwan ◽  
E B Setyawan

Abstract The increase in coal production every year has influence the transport volume of coal trains of Kereta Api Logistik Company is getting higher. This increase causes the current number of train unloading equipment to be unable to keep up with this increase and has an impact on the poor performance of train unloading, which is indicated by the unachieved of train’s waiting time target. The coal train unloading system is a very complex system and many uncertainties occur, so the appropriate method to use is discrete event simulation. The simulation model is designed using the Simulation Arena software. The results of the simulation method are 4 alternative scenarios will be selected by the Bonferonni test. Scenario 4 has the highest reduction in train unloading operating time, which is 30.7%. The results of this study recommend the addition of a tool with a combination of 1 unit of Gantry Crane integrated with coal traveling hopper and 5 units of Dump Truck and for management, this recommendation can reduce high overtime costs every month and increase coal transport capacity so that coal transport profits will increase.


2021 ◽  
Vol 13 (3) ◽  
pp. 171-176
Author(s):  
Krzysztof Staniszewski ◽  
◽  
Santina Topolska ◽  
Aleksander Gwiazda ◽  
◽  
...  

The article presents an analysis of the manufacturing process of gantry crane elements in the unit production regime. Gantry cranes are one of the most important heavy-duty mechanical components designed for lifting and loading heavy and bulky loads. In the analyzed case, the assembly of large-size elements in the form of a welding process was carried out outside. Therefore, there was a problem with the corrosion resistance of the elements produced in this way. In this article, special attention is paid to the performance of welded joints of such large elements and their disadvantages related to the conditions of the assembly process. These joints were made on the basis of typical, low-carbon structural steel (grade S355J2, steel with the number 1.0562) and Nickel alloy (Alloy 59, X2CrNiMoCuN22-5-3, steel with the number 2.4605) using the metal electrode. The weldability of investigated joints was assessed. The aim of the article is to analyze the influence of assembly conditions and subsequent corrosion protection of joints on their corrosion resistance under operating conditions. Appropriate tests have been carried out for this purpose. The tests showed the negative influence of external conditions on the corrosion resistance of the entire gantry crane structure.


Author(s):  
Oleh Ivanenko ◽  
Vitaliy Ragulin ◽  
Olga Nazarko

The results of experimental researches of parameters of movement of the model of the gantry crane under the influence of wind loadings are resulted. The assessment of the accuracy and reliability of the obtained results is performed and further directions of research are outlined. The adopted test program included the definition of similarity criteria and scale of the model, where the main parameter was the speed of the crane when exposed to wind. The influence of various factors and assessment of the impact of their interaction was achieved by conducting PFE type 24.


2021 ◽  
Author(s):  
◽  
Corinne Ankenbruck

<p>Purpose – The storage and supply of empty containers is a bottleneck in the global supply chain. In the wake of increasing containerisation and globalisation, improving efficiencies of processing within empty container depots can realise efficiencies. The overall objective of this research project is to propose an efficient and effective solution for reducing waste in an empty container depot using a crane. The issue of applying gantry cranes to empty container depots will cover both an operational and a strategic evaluation of the following research questions: 1) What are the potential solutions for a specific yard based on lean thinking, and which solution should be used within the constraints and contexts of this yard? 2) Who are the key stakeholders, and what are their stakes while implementing the solution in the yard to reduce waste?  Design/methodology/approach – A review of the literature around empty container depots revealed that while lean operations have been applied to manufacturing, warehousing, and ports, it has not yet been applied to empty container depots. Whereas warehouses primarily deal with stock-holding and ports deal with quayside operations, empty container depots act as a conduit between consignors and consignees. In the vein of American Pragmatism, Design Science Research, and Strategy-as-Practice, this thesis shows that in the context of empty container depots a gantry crane is an artefact that can create efficiencies, reduce costs, as well as explore further effects on the organisation and its wider geo-political habitus.  Case Study – A New Zealand company that handles roughly half a million TEUs per annum cooperated with this study. The study was conducted by analysing data from four working depots (Auckland, Tauranga, Napier) selected to illustrate variations in container volumes, types of flows (imports, exports, seasonality), and depot layouts. The current operations of these depots were analysed using lean operations, value stream mapping, and operations interwork centre flow graphs. Of the four sites identified, one (the Auckland OCP site) was shown to achieve the greatest results from a gantry crane. The results of the analysis were then used to develop a potential solution in which waste was identified and eliminated, primarily around excess handling and land utilisation.  Findings – A key finding was that efficiency gains differ from site to site based on their unique demands and overall layouts. Furthermore, changes towards the current yard using gantry cranes need to be implemented incrementally based on continuous improvement. This is due to practical constraints around operations, culture change, cashflow management, the acquisition of capital, and broader market/stakeholder influences.  Originality/value – The practical applications of this research case are scalable on a vast level. The effects of this research are explored in how the introduction of an artefact affects the organisation, its vision of itself, its strategies, and the broader supply chain in which this organisation operates. The results are further re-contextualisted in order to offer a holistic view of an artefact in its situated environment.</p>


2021 ◽  
Author(s):  
◽  
Corinne Ankenbruck

<p>Purpose – The storage and supply of empty containers is a bottleneck in the global supply chain. In the wake of increasing containerisation and globalisation, improving efficiencies of processing within empty container depots can realise efficiencies. The overall objective of this research project is to propose an efficient and effective solution for reducing waste in an empty container depot using a crane. The issue of applying gantry cranes to empty container depots will cover both an operational and a strategic evaluation of the following research questions: 1) What are the potential solutions for a specific yard based on lean thinking, and which solution should be used within the constraints and contexts of this yard? 2) Who are the key stakeholders, and what are their stakes while implementing the solution in the yard to reduce waste?  Design/methodology/approach – A review of the literature around empty container depots revealed that while lean operations have been applied to manufacturing, warehousing, and ports, it has not yet been applied to empty container depots. Whereas warehouses primarily deal with stock-holding and ports deal with quayside operations, empty container depots act as a conduit between consignors and consignees. In the vein of American Pragmatism, Design Science Research, and Strategy-as-Practice, this thesis shows that in the context of empty container depots a gantry crane is an artefact that can create efficiencies, reduce costs, as well as explore further effects on the organisation and its wider geo-political habitus.  Case Study – A New Zealand company that handles roughly half a million TEUs per annum cooperated with this study. The study was conducted by analysing data from four working depots (Auckland, Tauranga, Napier) selected to illustrate variations in container volumes, types of flows (imports, exports, seasonality), and depot layouts. The current operations of these depots were analysed using lean operations, value stream mapping, and operations interwork centre flow graphs. Of the four sites identified, one (the Auckland OCP site) was shown to achieve the greatest results from a gantry crane. The results of the analysis were then used to develop a potential solution in which waste was identified and eliminated, primarily around excess handling and land utilisation.  Findings – A key finding was that efficiency gains differ from site to site based on their unique demands and overall layouts. Furthermore, changes towards the current yard using gantry cranes need to be implemented incrementally based on continuous improvement. This is due to practical constraints around operations, culture change, cashflow management, the acquisition of capital, and broader market/stakeholder influences.  Originality/value – The practical applications of this research case are scalable on a vast level. The effects of this research are explored in how the introduction of an artefact affects the organisation, its vision of itself, its strategies, and the broader supply chain in which this organisation operates. The results are further re-contextualisted in order to offer a holistic view of an artefact in its situated environment.</p>


Sign in / Sign up

Export Citation Format

Share Document