scholarly journals Real-time modeling and 3D visualization of source dynamics and connectivity using wearable EEG

Author(s):  
Tim Mullen ◽  
Christian Kothe ◽  
Yu Mike Chi ◽  
Alejandro Ojeda ◽  
Trevor Kerth ◽  
...  
Energies ◽  
2021 ◽  
Vol 14 (9) ◽  
pp. 2471
Author(s):  
Tommaso Bradde ◽  
Samuel Chevalier ◽  
Marco De Stefano ◽  
Stefano Grivet-Talocia ◽  
Luca Daniel

This paper develops a predictive modeling algorithm, denoted as Real-Time Vector Fitting (RTVF), which is capable of approximating the real-time linearized dynamics of multi-input multi-output (MIMO) dynamical systems via rational transfer function matrices. Based on a generalization of the well-known Time-Domain Vector Fitting (TDVF) algorithm, RTVF is suitable for online modeling of dynamical systems which experience both initial-state decay contributions in the measured output signals and concurrently active input signals. These adaptations were specifically contrived to meet the needs currently present in the electrical power systems community, where real-time modeling of low frequency power system dynamics is becoming an increasingly coveted tool by power system operators. After introducing and validating the RTVF scheme on synthetic test cases, this paper presents a series of numerical tests on high-order closed-loop generator systems in the IEEE 39-bus test system.


Author(s):  
Aasim Raheel ◽  
Syed M. Anwar ◽  
Muhammad Majid ◽  
Bilal Khan ◽  
Ehatisham-ul-Haq

2021 ◽  
Author(s):  
Chingis Oshakbayev ◽  
Roman Romanov ◽  
Valentin Vlassenko ◽  
Simon Austin ◽  
Sergey Kovalev ◽  
...  

Abstract Currently drilling of horizontal wells is a common enhanced oil recovery method. Geosteering services are often used for accurate well placement, which makes it possible to achieve a significant increase in production at relatively low cost. This paper describes the result of using seismic data in three-dimensional visualization for high-quality geosteering using a deep boundary detection tool and multilayer inversion in real time. Crossing the top of the reservoir while drilling horizontal sections at the current oilfield is unacceptable, due to the presence of reactive mudstones. In case of crossing the top of reservoir, further work on running and installing the liner becomes impossible due to instability and may lead to well collapse. Based on prewell analysis of the structural data, the well was not supposed to approach the top of the target formation along the planned profile. However, while preparing geosteering model and analyzing seismic data it became possible to reveal that risk, elaborate its mitigation and eventually increase the length of the horizontal section. Such integrated analysis made it possible to maintain the wellbore within the target reservoirs, as well as to update the structural bedding of the top based on the multilayer inversion results.


2018 ◽  
Vol 24 (1) ◽  
pp. 119-126
Author(s):  
Cheong Hou Yew ◽  
Khairul Salleh Mohamed Sahari

Sign in / Sign up

Export Citation Format

Share Document