Electronic Campus Administrative System Load Equalization Analysis and Project Design

Author(s):  
Wenrui Ou ◽  
Wenxing Wang
1973 ◽  
Vol 4 (4) ◽  
pp. 174-181
Author(s):  
Marilyn J. Click ◽  
Jerrie K. Ueberle ◽  
Charles E. George

2018 ◽  
pp. 106-126
Author(s):  
O. V. Anchishkina

The paper deals with a special sector of public procurement — G2G, in which state organizations act as both customers and suppliers. The analysis shows the convergence between contractual and administrative relations and risks of transferring the negative factors, responsible for market failures, into the administrative system, as well as the changing nature of the state organization. Budget losses in the sector G2G are revealed and estimated. There are doubts, whether the current practice of substitution of market-based instruments for administrative requirements is able to maintain integrity of public procurement in the situation of growing strategic challenges. Measures are proposed for the adjustment and privatization of contractual relations.


1997 ◽  
Vol 1571 (1) ◽  
pp. 195-207 ◽  
Author(s):  
Toni Botte Bates ◽  
Dennis J. Wahl

Virtually all public works projects require a substantial planning effort to identify impacts, costs, and alternatives. Federal and state laws and regulations call for certain levels of public involvement during planning, but meaningful, collaborative public involvement entails doing more than the minimum requirements. This is particularly true when there appears to be an imbalance in public input, where one viewpoint is heard above others. The San Diego Metropolitan Transit Development Board (MTDB) has undertaken efforts on two corridor projects to expand its public involvement in ways that maximize the range of community views, enhance project design, and build support for the project. In addition to the traditional public meetings, newsletters, and open houses, MTDB has used public relations firms, neutral facilitators, and staff outreach to achieve expanded public involvement goals. MTDB has found that, while there are risks and costs associated with these approaches, they ultimately result in better projects that receive more widespread public and political acceptance.


Sign in / Sign up

Export Citation Format

Share Document