Westinghouse AP1000 Solution to Long-Term Cooling Debris Concerns

Author(s):  
Terry L. Schulz ◽  
Timothy S. Andreychek ◽  
Yong J. Song ◽  
Kevin F. McNamee

The AP1000 is a pressurized water reactor with passive safety features and extensive plant simplifications that provides significant and measurable improvements in safety, construction, reliability, operation, maintenance and costs. The design of the AP1000 incorporates a standard approach, which results in a plant design that can be constructed in multiple geographical regions with varying regulatory standards and expectations. The AP1000 uses proven technology, which builds on more than 2,500 reactor years of highly successful Westinghouse PWR operation. The AP1000 received Final Design Approval by the Nuclear Regulatory Commission in September 2004. The AP1000 Nuclear Power Plant uses natural recirculation of coolant to cool the core following a postulated Loss Of Coolant Accident (LOCA). Recirculation screens are provided in strategic areas of the plant to remove debris that might migrate with the water in containment and adversely affect core cooling. The approach used to avoid the potential for debris to plug the AP1000 recirculation screens is consistent with the guidance identified in Regulatory Guide 1.82 Revision 3, the Pressurized Water Reactor (PWR) Industry Guidance of NEI 04–07, and the Nuclear Regulatory Commission’s Safety Evaluation on NEI 04–07. Various contributors to screen plugging were considered, including debris that could be produced by a LOCA, resident containment debris and post accident chemical products that might be generated in the coolant pool that forms on the containment floor post-accident. The solution developed for AP1000 includes three major aspects, including the elimination of debris sources by design, features that prevent transportation of debris to the screens and the use of large advanced screen designs. Measures were taken to design out debris sources including fibers, particles and chemicals. Available industry data from walkdowns in existing plants is used to determine the characteristics and amounts of the fibrous and particulate debris that could exist in containment prior to the LOCA. Materials used in the AP1000 containment are selected to eliminate post accident chemical debris generation. Large, advanced screen designs that can tolerate significant quantities of debris have been incorporated. Testing has been performed which demonstrates that the AP1000 screens will have essentially no head loss considering the debris that could be transported to them. Testing has also been performed on an AP1000 fuel assembly that demonstrates that it will also have essentially no head loss considering the debris that could be transported to it.

2015 ◽  
Vol 138 (2) ◽  
Author(s):  
Akira Maekawa ◽  
Atsushi Kawahara ◽  
Hisashi Serizawa ◽  
Hidekazu Murakawa

Primary water stress corrosion cracking (PWSCC) phenomenon in dissimilar metal welds is one of the safety issues in ageing pressurized water reactor (PWR) piping systems. It is well known that analysis accuracy of cracking propagation due to PWSCC depends on welding residual stress conditions. The U.S. Nuclear Regulatory Commission (NRC) and the Electric Power Research Institute (EPRI) carried out an international round robin validation program to evaluate and quantify welding residual stress analysis accuracy and uncertainty. In this paper, participation results of the authors in the round robin program were reported. The three-dimensional (3D) analysis based on a fast weld simulation using an iterative substructure method (ISM), was shown to provide accurate results in a high-speed computation. Furthermore, the influence of different heat source models on analysis results was investigated. It was demonstrated that the residual stress and distortion calculated using the moving heat source model were more accurate.


Author(s):  
Amir Ali ◽  
Edward D. Blandford

The United States Nuclear Regulatory Commission (NRC) initiated a generic safety issue (GSI-191) assessing debris accumulation and resultant chemical effects on pressurized water reactor (PWR) sump performance. GSI-191 has been investigated using reduced-scale separate-effects testing and integral-effects testing facilities. These experiments focused on developing a procedure to generate prototypical debris beds that provide stable and reproducible conventional head loss (CHL). These beds also have the ability to filter out chemical precipitates resulting in chemical head loss. The newly developed procedure presented in this paper is used to generate debris beds with different particulate to fiber ratios (η). Results from this experimental investigation show that the prepared beds can provide reproducible CHL for different η in a single and multivertical loops facility within ±7% under the same flow conditions. The measured CHL values are consistent with the predicted values using the NUREG-6224 correlation. Also, the results showed that the prepared debris beds following the proposed procedure are capable of detecting standard aluminum and calcium precipitates, and the head loss increase (chemical head loss) was measured and reported in this paper.


Author(s):  
J. Pottorf ◽  
S. M. Bajorek

A WCOBRA/TRAC model of an evolutionary pressurized water reactor with direct vessel injection was constructed using publicly available information and a hypothetical double-ended guillotine break of a cold leg pipe was simulated. The model is an approximation of a ABB/Combustion Engineering System 80+ pressurized water reactor (PWR). WCOBRA/TRAC is the thermal-hydraulics code approved by the U.S. Nuclear Regulatory Commission for use in realistic large break LOCA analyses of Westinghouse 3- and 4-loop PWRs and the AP600 passive design. The AP600 design uses direct vessel injection, and the applicability of WCOBRA/TRAC to such designs is supported by comparisons to appropriate test data. This study extends the application of WCOBRA/TRAC to the investigation of the predicted behavior of direct vessel injection in an evolutionary design. A series of large break LOCA simulations were performed assuming a core power of 3914 MWt, and Technical Specification limits of 2.5 on total peaking factor and 1.7 on hot channel enthalpy rise factor. Two cladding temperature peaks were predicted during reflood, one following bottom of core recovery and a second caused by saturated boiling of water in the downcomer. This behavior is consistent with prior WCOBRA/TRAC calculations for some Westinghouse PWRs. The simulation results are described, and the sensitivity to failure assumptions for the safety injection system is presented.


Radiocarbon ◽  
1995 ◽  
Vol 37 (2) ◽  
pp. 497-504 ◽  
Author(s):  
Mihály Veres ◽  
Ede Hertelendi ◽  
György Uchrin ◽  
Eszter Csaba ◽  
István Barnabás ◽  
...  

We measured airborne releases of 14C from the Paks Pressurized Water Reactor (PWR) Nuclear Power Plant (NPP). Two continuous stack samplers collect 14C in 14CO2 and 14CnHm chemical forms. 14C activities were measured using two techniques; environmental air samples of lower activities were analyzed by proportional counting, stack samples were measured by liquid scintillation counting. 14C concentration of air in the stack varies between 80 and 200 Bqm−3. The average normalized yearly discharge rates for 1988–1993 were 0.74 TBqGW−1ey−1 for hydrocarbons and 0.06 TBqGW−1ey−1 for CO2. The discharge rate from Paks Nuclear Power Plant is about four times higher than the mean discharge value of a typical Western European PWR NPP. The higher 14C production may be apportioned to the higher level of nitrogen impurities in the primary coolant. Monitoring the long-term average excess from the NPP gave D14C = 3.5‰ for CO2 and D14C = 20‰ for hydrocarbons. We determined 14C activity concentration in the primary coolant to be ca. 4 kBq liter−1. The 14C activity concentrations of spent mixed bed ion exchange resins vary between 1.2 and 5.3 MBqkg−1 dry weight.


Author(s):  
Yang Li ◽  
Chen Hang

Main function of HVAC is to remove heat from equipment and pipeline, hold the inner condition, maintain an ambient temperature and humidity that keep the equipments function properly and easy access. Although regulation is no mandatory requirement of redundant equipment design and preservation function in case of specified disaster or man-made accident. In fact, It does be influenced by the incident whether partial failure or full. The hazard factor determination and qualitative analysis are based on fault tree analysis through simulated mode from selected the typical system. The identification of accident cause, hazard cause and fault mode is essential for improving system reliability. According the analysis result, It will be optimization factor such as installation and design process, maintenance ability, material plan, corrosion preventing. It’s helpful to control hazard under accepted level. This method given in the article is a new way to treat HVAC system in pressurized water reactor nuclear power. It hopes that this method will lead to reduce accident loss, save maintenance fee, bring economic benefits and improve the risk of nuclear power.