ASME Operation and Maintenance (OM) Code Overview

Author(s):  
Ronald C. Lippy

The purpose of this paper is to provide a general overview of the organization and content of the American Society of Mechanical Engineers (ASME) Operation and Maintenance of Nuclear Power Plants (OM) Code. This will involve a brief description of the regulatory requirements associated with Inservice Testing (IST) as well as a brief overview of the OM Code scope and requirements. This paper will discuss, in general, the regulations requiring IST as well as a brief discussion on when Preservice Testing (PST) and IST become required. A general organization of the ASME OM Code will be provided as well as general topics associated with how to determine when testing and examination intervals are established; what documentation is required; and general discussion regarding the various subsections of the OM Code and the components associated with the OM Code. Alternatives to the OM Code requirements and how to obtain these alternatives will also be provided as well as how the edition applicability of the ASME OM Code is determined. There is also discussion regarding a few general issues associated with the OM Code regarding existing reactor power plants as well as the “new builds” and advanced reactor plants and designs.

Author(s):  
Fred Setzer

This paper presents a discussion of the activities ongoing within the ASME (formerly the American Society of Mechanical Engineers) Operation and Maintenance of Nuclear Power Plants (OM) Code Subgroup on Air Operated Valves (SG-AOV), along with an overview of Revision 0 of Mandatory Appendix IV, “Preservice and Inservice Testing of Active Pneumatically Operated Valve Assemblies in Light-Water Reactor Power Plants.” Paper published with permission.


Author(s):  
Jason B. Carneal

The American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) establishes the requirements for preservice and inservice testing (IST) and examination of certain components to assess their operational readiness in light-water reactor nuclear power plants. The Code of Federal Regulations (CFR) endorses the use of the ASME OM Code in 10 CFR 50.55a(b)(3) . This paper focuses on applicable regulatory requirements and regulatory perspectives associated with the use of IST software in the nuclear industry. Paper published with permission.


Author(s):  
Ronald C. Lippy

The nuclear industry is preparing for the licensing and construction of new nuclear power plants in the United States. Several new designs have been developed and approved, including the “traditional” reactor designs, the passive safe shutdown designs and the small modular reactors (SMRs). The American Society of Mechanical Engineers (ASME) provides specific Codes used to perform preservice inspection/testing and inservice inspection/testing for many of the components used in the new reactor designs. The U.S. Nuclear Regulatory Commission (NRC) reviews information provided by applicants related to inservice testing (IST) programs for Design Certifications and Combined Licenses (COLs) under Part 52, “Licenses, Certifications, and Approvals for Nuclear Power Plants,” in Title 10 of the Code of Federal Regulations (10 CFR Part 52) (Reference 1). The 2012 Edition of the ASME OM Code defines a post-2000 plant as a nuclear power plant that was issued (or will be issued) its construction permit, or combined license for construction and operation, by the applicable regulatory authority on or following January 1, 2000. The New Reactors OM Code (NROMC) Task Group (TG) of the ASME Code for Operation and Maintenance of Nuclear Power Plants (NROMC TG) is assigned the task of ensuring that the preservice testing (PST) and IST provisions in the ASME OM Code to address pumps, valves, and dynamic restraints (snubbers) in post-2000 nuclear power plants are adequate to provide reasonable assurance that the components will operate as needed when called upon. Currently, the NROMC TG is preparing proposed guidance for the treatment of active pumps, valves, and dynamic restraints with high safety significance in non-safety systems in passive post-2000 reactors including SMRs.


Author(s):  
Thomas G. Scarbrough

In a series of Commission papers, the U.S. Nuclear Regulatory Commission (NRC) described its policy for inservice testing (IST) programs to be developed and implemented at nuclear power plants licensed under 10 CFR Part 52. This paper discusses the expectations for IST programs based on those Commission policy papers as applied in the NRC staff review of combined license (COL) applications for new reactors. For example, the design and qualification of pumps, valves, and dynamic restraints through implementation of American Society of Mechanical Engineers (ASME) Standard QME-1-2007, “Qualification of Active Mechanical Equipment Used in Nuclear Power Plants,” as accepted in NRC Regulatory Guide (RG) 1.100 (Revision 3), “Seismic Qualification of Electrical and Active Mechanical Equipment and Functional Qualification of Active Mechanical Equipment for Nuclear Power Plants,” will enable IST activities to assess the operational readiness of those components to perform their intended functions. ASME has updated the Operation and Maintenance of Nuclear Power Plants (OM Code) to improve the IST provisions for pumps, valves, and dynamic restraints that are incorporated by reference in the NRC regulations with applicable conditions. In addition, lessons learned from performance experience and testing of motor-operated valves (MOVs) will be implemented as part of the IST programs together with application of those lessons learned to other power-operated valves (POVs). Licensee programs for the Regulatory Treatment of Non-Safety Systems (RTNSS) will be implemented for components in active nonsafety-related systems that are the first line of defense in new reactors that rely on passive systems to provide reactor core and containment cooling in the event of a plant transient. This paper also discusses the overlapping testing provisions specified in ASME Standard QME-1-2007; plant-specific inspections, tests, analyses, and acceptance criteria; the applicable ASME OM Code as incorporated by reference in the NRC regulations; specific license conditions; and Initial Test Programs as described in the final safety analysis report and applicable RGs. Paper published with permission.


Author(s):  
S. Herstead ◽  
M. de Vos ◽  
S. Cook

The success of any new build project is reliant upon all stakeholders — applicants, vendors, contractors and regulatory agencies — being ready to do their part. Over the past several years, the Canadian Nuclear Safety Commission (CNSC) has been working to ensure that it has the appropriate regulatory framework and internal processes in place for the timely and efficient licensing of all types of reactor, regardless of size. This effort has resulted in several new regulatory documents and internal processes including pre-project vendor design reviews. The CNSC’s general nuclear safety objective requires that nuclear facilities be designed and operated in a manner that will protect the health, safety and security of persons and the environment from unreasonable risk, and to implement Canada’s international commitments on the peaceful use of nuclear energy. To achieve this objective, the regulatory approach strikes a balance between pure performance-based regulation and prescriptive-based regulation. By utilizing this approach, CNSC seeks to ensure a regulatory environment exists that encourages innovation within the nuclear industry without compromising the high standards necessary for safety. The CNSC is applying a technology neutral approach as part of its continuing work to update its regulatory framework and achieve clarity of its requirements. A reactor power threshold of approximately 200 MW(th) has been chosen to distinguish between large and small reactors. It is recognized that some Small Modular Reactors (SMRs) will be larger than 200 MW(th), so a graded approach to achieving safety is still possible even though Nuclear Power Plant design and safety requirements will apply. Design requirements for large reactors are established through two main regulatory documents. These are RD-337 Design for New Nuclear Power Plants, and RD-310 Safety Analysis for Nuclear Power Plants. For reactors below 200 MW(th), the CNSC allows additional flexibility in the use of a graded approach to achieving safety in two new regulatory documents: RD-367 Design of Small Reactors and RD-308 Deterministic Safety Analysis for Small Reactors. The CNSC offers a pre-licensing vendor design review as an optional service for reactor facility designs. This review process is intended to provide early identification and resolution of potential regulatory or technical issues in the design process, particularly those that could result in significant changes to the design or analysis. The process aims to increase regulatory certainty and ultimately contribute to public safety. This paper outlines the CNSC’s expectations for applicant and vendor readiness and discusses the process for pre-licensing reviews which allows vendors and applicants to understand their readiness for licensing.


Author(s):  
Gurjendra S. Bedi

The U.S. Nuclear Regulatory Commission (NRC) staff issued Revision 2 to NUREG-1482, “Guidelines for Inservice Testing at Nuclear Power Plant,” to assist the nuclear power plant licensees in establishing a basic understanding of the regulatory basis for pump and valve inservice testing (IST) programs and dynamic restraints (snubbers) inservice examination and testing programs. Since the Revision 1 issuance of NUREG-1482, certain tests and measurements required by earlier editions and addenda of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) have been clarified, updated, revised or eliminated. The revision to NUREG-1482 incorporates and addresses those changes, and includes the IST programs guidelines related to new reactors. The revised guidance incorporates lessons learned and experience gained since the last issue. This paper provides an overview of the contents of the NUREG-1482 and those changes and discusses how they affect NRC guidance on implementing pump and valve inservice testing (IST) programs. For the first time, this revision added dynamic restraint (snubber) inservice examination and testing program guidelines along with pump and valve IST programs. This paper highlights important changes to NUREG-1482, but is not intended to provide a complete record of all changes to the document. The NRC intends to continue to develop and improve its guidance on IST methods through active participation in the ASME OM Code consensus process, interactions with various technical organizations, user groups, and through periodic updates of NRC-published guidance and issuance of generic communications as the need arises. Revision 2 to NUREG-1482 incorporates regulatory guidance applicable to the 2004 Edition including 2005 and 2006 Addenda to the ASME OM Code. Revision 0 and Revision 1 to NUREG-1482 are still valid and may continue to be used by those licensees who have not been required to update their IST program to the 2004 Edition including the 2005 and 2006 Addenda (or later Edition) of the ASME OM Code. The guidance provided in many sections herein may be used for requesting relief from or alternatives to ASME OM Code requirements. However, licensees may also request relief or authorization of an alternative that is not in conformance with the guidance. In evaluating such requested relief or alternatives, the NRC uses the guidelines/recommendations of the NUREG, where applicable. The guidelines and recommendations provided in this NUREG and its Appendix A do not supersede the regulatory requirements specified in Title 10 of the Code of Federal Regulations (10 CFR) 10 CFR 50.55a, “Codes and standards”. Further, this NUREG does not authorize the use of alternatives to, grant relief from, the ASME OM Code requirements for inservice testing of pumps and valves, or inservice examination and testing of dynamic restraints (snubbers), incorporated by reference in 10 CFR 50.55a. Paper published with permission.


Author(s):  
Jason Carneal

The American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) establishes the requirements for preservice and inservice testing and examination of certain components to assess their operational readiness in light-water reactor nuclear power plants. The Code of Federal Regulations (CFR) endorses and mandates the use of the ASME OM Code for testing air-operated valves in 10 CFR 50.55a(b)(3)(ii) and 10 CFR 50.55a(f)(4), respectively. ASME has recently approved Mandatory Appendix IV, Revision 0. NRC currently anticipates that Mandatory Appendix IV will first appear in the 2014 Edition of the ASME OM Code. Publication of the 2014 Edition of the ASME OM Code begins the NRC rulemaking process to modify 10 CFR 50.55a to incorporate the 2014 Edition of the ASME OM Code by reference. NRC staff has actively participated in the development of Mandatory Appendix IV, Revision 0, through participation in the ASME OM Code Subgroup on Air-Operated Valves (SG-AOV). The purpose of this paper is to provide NRC staff perspectives on the contents and implementation of Mandatory Appendix IV, Revision 0. This paper specifically discusses Mandatory Appendix IV, Sections IV-3100, “Design Review,” IV-3300, “Preservice Test,” IV-3400, “Inservice Test,” IV-3600, “Grouping of AOVs for Inservice Diagnostic Testing,” and IV-3800, “Risk Informed AOV Inservice Testing.” These topics were selected based on input received during NRC staff participation in the SG-AOV and other industry meetings. The goal of this paper is to provide NRC staff perspectives on the topics of most interest to NRC staff and members of the SG-AOV. Paper published with permission.


Author(s):  
Ronald Lippy

The nuclear industry is preparing for the licensing and construction of new nuclear power plants in the United States. Several new designs have been developed, including more traditional evolutionary designs, passive reactor designs, and small modular reactors (SMRs). ASME (formerly the American Society of Mechanical Engineers) provides specific codes used to perform inspections and testing, both preservice and inservice, for many of the components used in the new reactor designs. The U.S. Nuclear Regulatory Commission (NRC) reviews information provided by applicants related to inservice testing (IST) programs for design certification (DC) and combined license (COL) applications under Part 52, “Licenses, Certifications, and Approvals for Nuclear Power Plants,” of Title 10, “Energy,” of the Code of Federal Regulations (10 CFR Part 52) (Reference 1). The 2012 Edition of the ASME OM Code, Operation and Maintenance of Nuclear Power Plants, defines a post-2000 plant as a nuclear power plant that was issued (or will be issued) its construction permit, or combined license for construction and operation, by the applicable regulatory authority on or after January 1, 2000. The ASME New Reactors OM Code (NROMC) Task Group (TG) is assigned the task of ensuring that the preservice testing (PST) and inservice testing (IST) provisions in the ASME OM Code are adequate to provide reasonable assurance that pumps, valves, and dynamic restraints (snubbers) for post-2000 plants will operate when needed. Currently, the NROMC TG is preparing proposed guidance for the treatment of active pumps, valves, and dynamic restraints with high safety significance in nonsafety systems for passive post-2000 plants, including SMRs. (Note: For purposes of this paper, “post-2000 plant” and “new reactor” are used interchangeably throughout.) Paper published with permission.