Dynamic Simulation Studies of Performed Additional Tests During FAT for Emergency Diesel Generators at Nuclear Power Plant

Author(s):  
Salah K. Kanaan ◽  
Amer Omanovic

In 2004, a decision was made to perform a modernization and a new power uprate of unit 2 at Oskarshamn nuclear power plant in Sweden. Among the most important reasons for this decision were new safety regulations from Swedish Radiation Safety Authority and ageing of important components. A project was established and became the largest nuclear power modernization in the world. The modernization led to the need of analysing the auxiliary power system to ensure that it could supply the unit after the uprate, given tolerances on current, voltage and frequency. During the process of developing models for the diesel generator sets, it turned out that the suppliers could not deliver enough satisfactory material for modelling the diesel engines, the speed controllers and the magnetization systems. Therefore, Oskarshamn nuclear power plant with the help of the manufacturers of the diesel generator sets carried out additional measurements in order to collect data for modelling. Based on electric circuit diagrams provided by the manufacturers, block diagrams of the magnetization systems were made. For the speed controllers, no information was available at all so it was assumed that the controller was of PI-type. The parameters of the magnetization systems and the speed controllers were then tuned using the measurement results. Finally, a comparison between simulated results and the measurement results were made, showing good agreement. This is especially true in the most commonly used operating interval of the diesel generator sets.

2016 ◽  
Vol 20 (3) ◽  
pp. 74-79
Author(s):  
E.A. Abidova ◽  
L.S. Hegay ◽  
A.V. Chernov ◽  
V.A. Bulava ◽  
O.Yu. Pugachyova ◽  
...  

Author(s):  
James W. Morgan

The nuclear power industry is faced with determining what to do with equipment and instrumentation reaching obsolescence and selecting the appropriate approach for upgrading the affected equipment. One of the systems in a nuclear power plant that has been a source of poor reliability in terms of replacement parts and control performance is the reactor recirculation pump speed/ flow control system for boiling water reactors (BWR). All of the operating BWR-3 and BWR-4’s use motor-generator sets, with a fluid coupled speed changer, to control the speed of the recirculation water pumps over the entire speed range of the pumps. These systems historically have had high maintenance costs, relative low efficiency, and relatively inaccurate speed control creating unwanted unit de-rates. BWR-5 and BWR-6 recirculation flow control schemes, which use flow control valves in conjunction with two-speed pumps, are also subject to upgrades for improved performance and reliability. These systems can be improved by installing solid-state adjustable speed drives (ASD), also known as variable frequency drives (VFD), in place of the motor-generator sets and the flow control valves. Several system configurations and ASD designs have been considered for optimal reliability and return on investment. This paper will discuss a highly reliable system and ASD design that is being developed for nuclear power plant reactor recirculation water pump controls. Design considerations discussed include ASD topology, controls architecture, accident, transient and hydraulic analyses, potential reactor internals modifications, installation, demolition and economic benefits.


Author(s):  
Zhang Zhichao

At present, in the typical design of China’s nuclear power plant, main generation system is connected to the power grid by 500 kV system. 500 kV system as a priority power source, 220kV system as an auxiliary power source. Independent operation of 500kV and 220kV system, improved the reliability of power supply of nuclear power plant. However, the DC 220V power system used to control the 500kV and 220kV system in the switch station of partial nuclear power project is not independently configured, and the design form of one set of DC system is used in the transformer station. In recent years, there are many accidents that AC power enters into the DC power system, resulted in the loss of power source in the transformer station. The loss of external power source in the whole plant is very significant. In this paper, the influence of AC power entering into DC power system on relay protection device is analyzed, the measures to prevent the AC power into DC power system are discussed, the necessity of independent configuration of DC control power system for the 500kV priority power system and 220kV auxiliary power supply system is analyzed.


2017 ◽  
Vol 1 (1) ◽  
pp. 32
Author(s):  
Meng Wang

This paper introduces an applicable test plan for emergency diesel generator in nuclear power plant. It advances improvement approaches with problems found during field commissioning test and its trouble-shooting processes. The method is based on the integration of complementary through, the extension theory of matter-element model and neural network theory combine to overcome a neural network to learn shelters, and other defects. The purpose of this paper is to provide the better running and commissioning experience for the similar emergency generator unit.


Sign in / Sign up

Export Citation Format

Share Document