scholarly journals From preventative to predictive maintenance: The organisational challenge

Author(s):  
Luminita Ciocoiu ◽  
Carys E Siemieniuch ◽  
Ella-Mae Hubbard

Introduction of new technology (technology implementation) within an organisation can have wide reaching implications, beyond the effectiveness and efficiency savings that are typically the aim of such an endeavour. The ‘Health and Prognostic Assessment of Railway Assets for Predictive Maintenance’ project developed a prognostic tool, which aimed to support enhancement of the London underground’s remote condition monitoring system to support change from reactive and preventative to predictive maintenance, in order to increase effectiveness and efficiency and reduce lost customer hours. This paper investigates the organisational challenges associated with the introduction of such a tool. The paper describes the approach adopted to model the extant maintenance processes (focusing on role mapping) and associated organisational structures which revealed issues such as unclear processes, poor communication and data sharing links and problems with delineation of responsibility for decision making. It also describes the development of a new maintenance process model that incorporates the additional functionality of the new prognostic tool, taking in to account changes of roles, responsibilities, organisational processes and activities.

2020 ◽  
Vol 10 (23) ◽  
pp. 8348
Author(s):  
Bram Ton ◽  
Rob Basten ◽  
John Bolte ◽  
Jan Braaksma ◽  
Alessandro Di Bucchianico ◽  
...  

The full potential of predictive maintenance has not yet been utilised. Current solutions focus on individual steps of the predictive maintenance cycle and only work for very specific settings. The overarching challenge of predictive maintenance is to leverage these individual building blocks to obtain a framework that supports optimal maintenance and asset management. The PrimaVera project has identified four obstacles to tackle in order to utilise predictive maintenance at its full potential: lack of orchestration and automation of the predictive maintenance workflow, inaccurate or incomplete data and the role of human and organisational factors in data-driven decision support tools. Furthermore, an intuitive generic applicable predictive maintenance process model is presented in this paper to provide a structured way of deploying predictive maintenance solutions.


Author(s):  
Federico VAZ ◽  
Sharon PRENDEVILLE

Described as units developing public policies in a design-oriented manner, Policy Labs are tasked to innovate to gain in policy effectiveness and efficiency. However, as public policymaking is a context-dependent activity, the way in which these novel organisations operate significantly differs. This study discusses the emergence of design approaches for policy innovation. The purpose is to map how Policy Labs in Europe introduce design approaches at distinct stages of the policymaking cycle. For this study, 30 organisations in Europe operating at various levels of government were surveyed. Based on the public policymaking process model, it investigates which design methods are Policy Labs deploying to innovate public policies. The study exposed a gap in the awareness of the utilised methods' nature. It also showed that the use of design methods is of less importance than the introduction of design mindsets for public policy innovation, namely ‘user-centredness’, ‘co-creation’, and ‘exploration’.


2021 ◽  
Vol 11 (8) ◽  
pp. 3438
Author(s):  
Jorge Fernandes ◽  
João Reis ◽  
Nuno Melão ◽  
Leonor Teixeira ◽  
Marlene Amorim

This article addresses the evolution of Industry 4.0 (I4.0) in the automotive industry, exploring its contribution to a shift in the maintenance paradigm. To this end, we firstly present the concepts of predictive maintenance (PdM), condition-based maintenance (CBM), and their applications to increase awareness of why and how these concepts are revolutionizing the automotive industry. Then, we introduce the business process management (BPM) and business process model and notation (BPMN) methodologies, as well as their relationship with maintenance. Finally, we present the case study of the Renault Cacia, which is developing and implementing the concepts mentioned above.


2021 ◽  
Author(s):  
Mihaela Vlaicu ◽  
Vasile Marius Nae ◽  
Patrick Christian Buerssner ◽  
Stefan Liviu Firu ◽  
Natalya Logashova

Abstract Paraffin represents one of the main case of failures and production losses which facing the entire oil industry. Prevention of paraffin deposition on the subsurface/surface equipment can be achieved by keeping the paraffin dissolved in crude oil or minimizing the adhesion or aggregation process of wax crystals. The paraffin problems which occur, conduct to gradual reduction of the tubular and pipelines internal diameter, restriction or valves blockages, and reduce the equipment capacity until the production is stop. Problems due to paraffin deposition varies and is different according with each commercial field, sometime the difference is from a well to well which producing from the same reservoir with different consistency. How we shall proceed? Before or after paraffin is field on the equipment? How could be avoid the future paraffin deposition? How long the selected method is proper for well ? The decision represents a combination based on oil's chemical & physical characteristics, well's behavior, method selected for prevention or elimination and combined with economic analysis and field experience. The paraffin inhibition applying is a common practice in OMV Petrom, which cover majority of the production wells. For the special wells, which the paraffin inhibition didn't provided satisfying results (multiple intervention due to paraffin deposition) was selected the Down Hole Heating technology (DHH) which was successfully tested in our company since 2014 thanks according with the yearly New Technology Program. The operating principle consists in heating the fluid volume from tubing using the heating cable which can be installed inside tubing, for NF and ESP wells or outside tubing for SRP or PCP wells. The cable is designed and located at the interval of wax crystallization appearance and heats the fluid to the temperature higher than the wax crystallization point (WAT). Since then, the DHH technology had an upward course, proven by high run life (highest value 2500 days / average 813 days) of the technology at the total 47 wells equipped, until this moment. Based on the successful results, recorded of 64% of old production wells equipped, it was decided to apply the technology at first completion of the new wells (36%), thus ensuring the protection of the new equipment. The paper offers an overview of DHH technology implementation, achievements, benefits and online monitoring of technology implementation starting with 2014 until today. The total impact shown a decreasing of no.of failures with 73,8%, the cost of intervention with 76,5%. The production losses decreased only with 5%, which certifies the fact that the technology helping production maintaining during the exploitation in comparison with production losses due paraffin issues recorded at wells without equipped with DHH technology. During 6 years of down hole heating technology application were developed candidate selection decision tree, monitoring the electrical efficiency, using the adaptability capacity of the technology from one well to another and integrate the temperature parameters in online monitoring system as part of digitalization concept of OMV Petrom, aspects which will be present in this article.


2007 ◽  
Vol 20 (4) ◽  
pp. 352-375 ◽  
Author(s):  
Elizabeth White Baker ◽  
Said S. Al‐Gahtani ◽  
Geoffrey S. Hubona

2001 ◽  
Vol 46 (4) ◽  
pp. 685 ◽  
Author(s):  
Amy C. Edmondson ◽  
Richard M. Bohmer ◽  
Gary P. Pisano