scholarly journals Protecting patients from infection: Improving topical prophylaxis compliance on surgical wards

2019 ◽  
Vol 21 (2) ◽  
pp. 47-51
Author(s):  
Holly Slyne ◽  
Natalie Clews ◽  
Sid Beech ◽  
Elizabeth Smilie

Background: At a medium-sized district general hospital in the heart of England, it was identified that compliance to the administration of topical prophylaxis on three general surgery wards had reduced to 23%, following implementation of an electronic medication prescription record. Therefore, a quality improvement project was commenced to improve this compliance to protect patients from meticillin-resistant Staphylococcus aureus (MRSA) colonisation and associated bacteraemia. Aim: To improve compliance of topical prophylaxis administration on three surgical wards to protect patients from infection. Method: Quality improvement plan – do – study – act (PDSA) cycles evaluated the effectiveness of four different strategies from baseline data which was 23% compliant in December 2016. These included teaching and communication strategies, prompts in medical notes, discontinuation of Mupirocin 2% nasal ointment as part of the topical prophylaxis regime and discontinuation of the topical wash lotion from requiring a prescription. Results: The compliance of prophylaxis administration increased consistently throughout from 23% in December 2016 to 92% in March 2018. Consequently, the number of patients that developed a MRSA colonisation on the three wards reduced by 54%, from 13 in the 12 months before the study to six in the 12 months after the study. Discussion: This study led to a change in the Trust MRSA Policy to better protect patients from infection, particularly surgical site infection and MRSA bacteraemia. It suggests that quality improvement methodology has a place in infection prevention practice.

2013 ◽  
Vol 93 (7) ◽  
pp. 975-985 ◽  
Author(s):  
Heidi J. Engel ◽  
Shintaro Tatebe ◽  
Philip B. Alonzo ◽  
Rebecca L. Mustille ◽  
Monica J. Rivera

Background Long-term weakness and disability are common after an intensive care unit (ICU) stay. Usual care in the ICU prevents most patients from receiving preventative early mobilization. Objective The study objective was to describe a quality improvement project established by a physical therapist at the University of California San Francisco Medical Center from 2009 to 2011. The goal of the program was to reduce patients' ICU length of stay by increasing the number of patients in the ICU receiving physical therapy and decreasing the time from ICU admission to physical therapy initiation. Design This study was a 9-month retrospective analysis of a quality improvement project. Methods An interprofessional ICU Early Mobilization Group established and promoted guidelines for mobilizing patients in the ICU. A physical therapist was dedicated to a 16-bed medical-surgical ICU to provide physical therapy to selected patients within 48 hours of ICU admission. Patients receiving early physical therapy intervention in the ICU in 2010 were compared with patients receiving physical therapy under usual care practice in the same ICU in 2009. Results From 2009 to 2010, the number of patients receiving physical therapy in the ICU increased from 179 to 294. The median times (interquartile ranges) from ICU admission to physical therapy evaluation were 3 days (9 days) in 2009 and 1 day (2 days) in 2010. The ICU length of stay decreased by 2 days, on average, and the percentage of ambulatory patients discharged to home increased from 55% to 77%. Limitations This study relied upon the retrospective analysis of data from 6 collectors, and the intervention lacked physical therapy coverage for 7 days per week. Conclusions The improvements in outcomes demonstrated the value and feasibility of a physical therapist–led early mobilization program.


2021 ◽  
Vol 50 (Supplement_1) ◽  
pp. i12-i42
Author(s):  
C M Orton ◽  
N E Sinson ◽  
R Blythe ◽  
J Hogan ◽  
N A Vethanayagam ◽  
...  

Abstract Introduction NICE and the National Osteoporosis Guidance Group (NOGG) advise on evaluation of fracture risk and osteoporosis treatment1,2, with evidence suggesting that screening and treatment reduces the risk of fragility fractures 3,4,5. However, it is often overlooked in the management of older patients within secondary care. Audit data from Sheffield Frailty Unit (SFU) in 2018 showed that national guidance was not routinely followed. Fracture Risk Assessment Tool (FRAX®) scores were not calculated and bone health was poorly managed. Therefore, we undertook a quality improvement project aiming to optimise bone health in patients presenting to SFU. Method & Intervention In January 2019 we collaborated with Sheffield Metabolic Bone Centre (MBC) to develop a pathway aiming to improve bone health assessment and management in patients presenting to SFU with a fall or fragility fracture. This included a user-friendly flow chart with accompanying guidelines, alongside education for staff. Performance was re-evaluated in May 2019, following which a tick box prompt was added to post take ward round documentation. A re-audit was performed in March 2020. Results In March 2018 0% of patients presenting with a fall had a FRAX® score calculated and only 40% of those with a new fragility fracture were managed according to guidelines. In May 2019, this had improved to 18% and 100% respectively. In March 2020 86% of patients had a FRAX® score calculated appropriately and 100% of fragility fractures were managed according to guidelines. In both re-audits 100% of FRAX® scores were acted on appropriately. Conclusions There has been a significant increase in the number of patients who have their bone health appropriately assessed and managed after presenting to SFU. However, achieving optimum care is under constant review with the aim to deliver more treatment on SFU, thereby reducing the need for repeat visits to the MBC.


2018 ◽  
Vol 7 (2) ◽  
pp. e000170 ◽  
Author(s):  
Niall Gilliland ◽  
Natalie Catherwood ◽  
Shaouyn Chen ◽  
Peter Browne ◽  
Jacob Wilson ◽  
...  

Introduction and aimsConcerns had been raised at clinical governance regarding the safety of our inpatient ward rounds with particular reference to: documentation of clinical observations and National Early Warning Score (NEWS), compliance with Trust guidance for venous thromboembolism (VTE) risk assessment, antibiotic stewardship, palliative care and treatment escalation plans (TEP). This quality improvement project was conceived to ensure these parameters were considered and documented during the ward round, thereby improving patient care and safety. These parameters were based on Trust patient safety guidance and CQUIN targets.MethodThe quality improvement technique of plan–do–study–act (PDSA) was used in this project. We retrospectively reviewed ward round entries to record baseline measurements, based on the above described parameters, prior to making any changes. Following this, the change applied was the introduction of a ward round template to include the highlighted important baseline parameters. Monthly PDSA cycles are performed, and baseline measurements are re-examined, then relevant changes were made to the ward round template.Summary of resultsDocumentation of baseline measurements was poor prior to introduction of the ward round template; this improved significantly following introduction of a standardised ward round template. Following three cycles, documentation of VTE risk assessments increased from 14% to 92%. Antibiotic stewardship documentation went from 0% to 100%. Use of the TEP form went from 29% to 78%.ConclusionsFollowing introduction of the ward round template, compliance improved significantly in all safety parameters. Important safety measures being discussed on ward rounds will lead to enhanced patient safety and will improve compliance to Trust guidance and comissioning for quality and innovation (CQUIN) targets. Ongoing change implementation will focus on improving compliance with usage of the template on all urology ward rounds.


2016 ◽  
Vol 12 (3) ◽  
pp. e320-e331 ◽  
Author(s):  
Ryan Y.C. Tan ◽  
Marie Met-Domestici ◽  
Ke Zhou ◽  
Alexis B. Guzman ◽  
Soon Thye Lim ◽  
...  

Purpose: To meet increasing demand for cancer genetic testing and improve value-based cancer care delivery, National Cancer Centre Singapore restructured the Cancer Genetics Service in 2014. Care delivery processes were redesigned. We sought to improve access by increasing the clinic capacity of the Cancer Genetics Service by 100% within 1 year without increasing direct personnel costs. Methods: Process mapping and plan-do-study-act (PDSA) cycles were used in a quality improvement project for the Cancer Genetics Service clinic. The impact of interventions was evaluated by tracking the weekly number of patient consultations and access times for appointments between April 2014 and May 2015. The cost impact of implemented process changes was calculated using the time-driven activity-based costing method. Results: Our study completed two PDSA cycles. An important outcome was achieved after the first cycle: The inclusion of a genetic counselor increased clinic capacity by 350%. The number of patients seen per week increased from two in April 2014 (range, zero to four patients) to seven in November 2014 (range, four to 10 patients). Our second PDSA cycle showed that manual preappointment reminder calls reduced the variation in the nonattendance rate and contributed to a further increase in patients seen per week to 10 in May 2015 (range, seven to 13 patients). There was a concomitant decrease in costs of the patient care cycle by 18% after both PDSA cycles. Conclusion: This study shows how quality improvement methods can be combined with time-driven activity-based costing to increase value. In this paper, we demonstrate how we improved access while reducing costs of care delivery.


2019 ◽  
Vol 105 (2) ◽  
pp. 122-126
Author(s):  
Ashifa Trivedi ◽  
Sadhna Sharma ◽  
Richa Ajitsaria ◽  
Nicola J Davey

A quality improvement project to increase the rate of paediatric medicines reconciliation was carried out in a district general hospital between April and July 2018. Baseline data collected from our paediatric ward shows that medicines reconciliation by doctors is only accurately completed 50% of the time. Evidence shows that medicines-related patient safety incidents are more likely when medicines reconciliation happens more than 24 hours after a person is admitted to an acute setting. The aim of this quality improvement project was therefore to ensure that 100% of paediatric patients have their regular medications prescribed by mid-day the day after admission. The paediatric pharmacy team reviewed all paediatric inpatient drug charts from Monday to Friday for 12 weeks. The number of regular medications and the number of medicines reconciled was recorded each day. The effectiveness of various interventions were reviewed using Plan–Do–Study–Act cycles. On average, 40 patients were reviewed each week. The mean reconciliation rate was 79%, and the worst rate was 0%. 100% reconciliation was achieved on 34 occasions and was achieved continuously for the last 3 weeks of data collection. A repeat audit carried out in September 2018 found the reconciliation rate was maintained at 100%. Multiple interventions occurred during this quality improvement project: teaching sessions for doctors, posters to raise awareness and questionnaires for parents/children to complete about their regular medications. The main factor for success in this project has been involving all members of the paediatric department including children and their parents.


Sign in / Sign up

Export Citation Format

Share Document