Analysis of Key Performance Factors Affecting Residential Construction Projects in Pakistan

Author(s):  
Aysha Shahid ◽  
Hussain Ahmad ◽  
Muhammad Nouman Shafique
2016 ◽  
Vol 7 (2) ◽  
pp. 82 ◽  
Author(s):  
Gwahula Raphael ◽  
Augustine Wittonde Phillip

The study objective was “An assessment of critical factors affecting quality performance of government financed construction projects in Tanzania”. The study was initiated as much of government financed construction projects are executed with variations on delivering time, cost and quality. The study identified factors if not considered can lead to poor quality performance of projects. Closed end questionnaire consisting of 20 performance factors were issued to 80 respondents dealing with construction related activities, they were required to rank them on a 5 point Likert scale. Data analysis was done using Statistical Package for Social Sciences version 16 (SPSS). The findings revealed that the critical factors that have direct impact on quality performance of government financed construction projects are; project financing processes, experience of contractors in construction industry, project technology, availability of plant and equipment, procurement system and processes as well as the project manager knowledge and skills. A multiple regression model developed showed a positive linear relationship between project quality performance and the critical quality performance factors. All the critical quality performance factors had positive coefficients with an acceptable level of significance. The study recommends further studies on the economic and social factors that hinder women participation in construction relation activities and how training and learning opportunities for continuous improvement will have positive impact on the performance of construction projects.


Author(s):  
Nor Haslinda Abas ◽  
◽  
Nurhalimah Yusuf ◽  
Muhamad Hanafi Rahmat ◽  
Tong Yean Ghing ◽  
...  

The Malaysian construction industry has been long categorized as one of the riskiest industries due to the high number of accidents that happened at construction sites. The poor safety performance in the construction industry has caused several drawbacks and failures in the aspects of project performance, cost, project completion time, and productivity. One of the reasons that led to this situation is due to the inadequate awareness of the project safety performance factors. Therefore, this study aims to investigate the significant factors affecting the safety performance of construction projects, based on the perceptions of safety personnel. Fifty-six (56) questionnaires were distributed among construction safety personnel who are working at construction sites in Kuala Lumpur through email and face-to-face methods. The percentage of the returned questionnaire was 100%. The questionnaire was analyzed using the Average Index (AI) analysis to attain the significant factors that affect the safety performance of construction projects. The findings revealed that among significant factors that affect safety performance on the construction project through project level and organization level were safety training, safety rules and safety induction, and performance monitoring. The outcomes of the study could assist relevant parties especially contractors to avoid accidents occur and have a systematic improvement on safety performance indicators at the construction project.


Author(s):  
Ahmed Salem Ahmed Marey Alhammadi ◽  
◽  
Aftab Hameed Memon ◽  

UAE construction industry frequently faces poor cost performance which commonly known as cost overrun problem. This problem is resulted from several factors and it is important to identify these cost overrun factors in order to avoid and minimize it. Hence, this paper focused on determined the relevancy of factors affecting cost performance in construction projects of UAE. Through a review of past research works conducted globally, 27 factors of cost overrun were listed and used for developing a structured questionnaire. A survey was conducted with 33 practitioners from client, consultant and contractors organizations involved in handling construction projects in UAE. The respondents were requested to state their perception regarding the relevancy of each of the factors that was perceived in context with cost overrun issue using 5-points Likert scale. The responses were analysed using average index method and the results found that all the 27 factors are relevant with construction industry of UAE in causing cost overrun. These factors can be used for further investigation to uncover critical problems of cost overrun.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benviolent Chigara ◽  
Tirivavi Moyo

Purpose The purpose of this study was to investigate the perceptions of construction professionals relative to factors that affect the delivery of optimum health and safety (H&S) on construction projects during the COVID-19 pandemic. Design/methodology/approach The study adopted a quantitative design which entailed the distribution of a web-based questionnaire among construction professionals, namely, architects, construction/project managers, engineers, H&S managers and quantity surveyors working for contractors and construction consultants in Zimbabwe. The data were analysed with descriptive and inferential statistics. Factor analysis was used to reveal interrelated significant sets of factors affecting the delivery of optimum H&S. Findings Factor analysis revealed nine components/factors: change and innovation-related, monitoring and enforcement-related, production-related, access to information and health service-related, on-site facilities and welfare-related, risk assessment and mitigation-related, job security and funding-related, cost-related and COVID-19 risk perception-related factors as the significant factors affecting the delivery of optimum H&S during the COVID-19 pandemic in Zimbabwe. Research limitations/implications The results highlighted the need for social dialogue among construction stakeholders to support initiatives that will enhance the delivery of H&S on construction projects. Construction stakeholders may find the results useful in highlighting the areas that need improvement to protect workers’ H&S during the pandemic. However, the small sample limits the generalisability of the results to construction sectors in other regions. Originality/value The study investigated factors affecting the delivery of optimum H&S during the COVID-19 to inform interventions to enhance H&S.


Sign in / Sign up

Export Citation Format

Share Document