Pilot plant study on nitrogen and phosphorus removal in marine wastewater by marine sediment with sequencing batch reactor
2006 ◽
Vol 27
(3)
◽
pp. 191-196
◽
2008 ◽
Vol 134
(11)
◽
pp. 923-927
◽
2020 ◽
Vol 301
◽
pp. 122750
◽
2015 ◽
Vol 103
◽
pp. 221-226
◽
2016 ◽
Vol 216
◽
pp. 428-436
◽
2011 ◽
Vol 23
◽
pp. S110-S113
◽
2008 ◽
Vol 2
(1)
◽
pp. 99-102
◽