scholarly journals An oversampling method for multi-class imbalanced data based on composite weights

PLoS ONE ◽  
2021 ◽  
Vol 16 (11) ◽  
pp. e0259227
Author(s):  
Mingyang Deng ◽  
Yingshi Guo ◽  
Chang Wang ◽  
Fuwei Wu

To solve the oversampling problem of multi-class small samples and to improve their classification accuracy, we develop an oversampling method based on classification ranking and weight setting. The designed oversampling algorithm sorts the data within each class of dataset according to the distance from original data to the hyperplane. Furthermore, iterative sampling is performed within the class and inter-class sampling is adopted at the boundaries of adjacent classes according to the sampling weight composed of data density and data sorting. Finally, information assignment is performed on all newly generated sampling data. The training and testing experiments of the algorithm are conducted by using the UCI imbalanced datasets, and the established composite metrics are used to evaluate the performance of the proposed algorithm and other algorithms in comprehensive evaluation method. The results show that the proposed algorithm makes the multi-class imbalanced data balanced in terms of quantity, and the newly generated data maintain the distribution characteristics and information properties of the original samples. Moreover, compared with other algorithms such as SMOTE and SVMOM, the proposed algorithm has reached a higher classification accuracy of about 90%. It is concluded that this algorithm has high practicability and general characteristics for imbalanced multi-class samples.

2013 ◽  
Vol 444-445 ◽  
pp. 1751-1755
Author(s):  
Qing Hua Zhan ◽  
Shi Mei Wang

This paper first introduces the meaning and mission of the economic evaluation of geological disasters,as well as the basic concepts of different economic evaluation, and then discuss the methods of economic evaluation of geological disasters, including multi-level fuzzy comprehensive evaluation method and statistical data evaluation method, and gives the outlook of the economic evaluation of geological disasters.


2013 ◽  
Vol 295-298 ◽  
pp. 2493-2499 ◽  
Author(s):  
Jin Yang ◽  
Ya Xian Wu ◽  
Chao Xia

An indicator system is established for the suitability of projects linked to the increase/decrease in urban and rural construction land based on the field surveys for the old areas to be dismantled in three administrative villages such as Niulandian Village, Tianjiagou Village and Nanchongsi Village of Tianchi Town in Lezhi County of Sichuan Province, and the fuzzy comprehensive evaluation method is used to evaluate indicators. The analysis of evaluation results provides reference for the efficient implementation of projects linked to the increase/decrease in urban and rural construction land.


2013 ◽  
Vol 671-674 ◽  
pp. 3147-3151
Author(s):  
Yun Na Wu ◽  
Chao Liu ◽  
Mandula Naren ◽  
He Ping Wang ◽  
Jian Chen

The construction project bidding is a feasible method in engineering transactions and the main competition form of the construction activities under the conditions of the market economy. The bid assessment is an important link of bidding, and whether bid evaluation method is scientific or not, is directly related to the success of the tender. In the engineering construction field, at present the current commonly used evaluation methods are the comprehensive evaluation method and the lowest bidding price evaluation method. Based on fuzzy set theory and multi-objective people decision theory, we introduce fuzzy multi-objective people decision-making evaluation methods. And conducting research to put forward the evaluation index and weight method to determine the bidding decision model. Finally we apply it to actual case to make out the more standardized and scientific bidding evaluation method.


Sign in / Sign up

Export Citation Format

Share Document