scholarly journals Heuristic Algorithm for Minimizing the Electricity Cost of Smart House

2017 ◽  
Vol 11 (4) ◽  
Author(s):  
Mohamed Arikiez ◽  
Faisal Alotaibi ◽  
Farouq Gdhaidh ◽  
Radwan Khershif ◽  
Salahedin Rehan
2021 ◽  
pp. 12-20
Author(s):  
Samia Chibani Sadouki ◽  
Souhila Ait Hacene Ouhadda
Keyword(s):  

2015 ◽  
Vol 16 (1) ◽  
pp. 59-74 ◽  
Author(s):  
Tsubasa Shimoji ◽  
Hayato Tahara ◽  
Hidehito Matayoshi ◽  
Atsushi Yona ◽  
Tomonobu Senjyu

Abstract Due to the concerns of global warming and the depletion of energy resources, renewable energies such as wind generation (WG) and photovoltaic generation (PV) are gaining attention in distribution systems. Efficient electric equipment such as heat pumps (HP) not only contribute low levels of carbon to society, but are also beneficial for consumers. In addition, gas instruments such as the gas engine (GE) and fuel cells (FC) are expected to reduce electricity cost by exhaust heat. Thus, it is important to clarify which systems (HP or GE) are more beneficial for consumers throughout the year. This paper compares the operational cost for the smart house between using the HP and the GE. Current electricity and gas prices are used to calculate the cost of the smart house. The system considered in this research comprises a PV, battery, solar collector (SC), uncontrolled load and either an HP or a GE. In order to verify the effectiveness of the proposed system, MATLAB is used for simulations.


2013 ◽  
Vol E96.B (1) ◽  
pp. 155-162 ◽  
Author(s):  
Ken TANAKA ◽  
Kenji MIKAWA ◽  
Manabu HIKIN

1987 ◽  
Vol 19 (9) ◽  
pp. 43-51 ◽  
Author(s):  
A. S. Câmara ◽  
M. Cardoso da Silva ◽  
L. Ramos ◽  
J. Gomes Ferreira

The division of an estuary into homogeneous areas from both hydrodynamic and ecological standpoints is essential to any estuarine basin management model. This paper presents an approach based on a heuristic algorithm to achieve such a division. The methodology implemented through an interactive computer program named Tejo 1 applies morphological, water quality and management criteria in order to achieve the disaggregation. The approach is equally applicable to river or lake basins, with only minor adaptations. An application of Tejo 1 to the Tejo estuary is included for illustrative purposes, which resulted in the final division of the estuary into 11 homogeneous areas.


2020 ◽  
Vol 67 (2) ◽  
pp. 44-50
Author(s):  
Vadim E. Bolshev ◽  
Aleksandr V. Vinogradov ◽  
Alina V. Vinogradova ◽  
Aleksey V. Bukreev ◽  
Aleksandr A. Lansberg

During the functioning of power supply system, there can be situations where the culprit in interruptions of power supply to consumers and a power quality violation is a power supply company or a consumer himself. Therefore, the economic incentive for power supply companies and consumers to increase power supply reliability and power quality is an urgent task. To implement such incentives, it is necessary to control the facts and time of power supply outages and their values as well as cases and time of non-compliance of power quality with the requirements of standards. It is possible with the use of a monitoring system for power supply reliability and power quality. (Research purpose) The research purpose is in developing a technical and economic method for stimulating power supply companies and consumers to increase efficiency of power supply system. (Materials and methods) The article provides a review of the structural diagram of a system for monitoring power supply reliability and power quality including devices for monitoring the number and duration of power outages and voltage deviations. (Results and discussion). An economic method has been developed to stimulate power supply companies and consumers to increase power supply system efficiency. The essence of the method is to control the parameters of power supply reliability and power quality, identify the violation of these parameters, determine the culprit of the violation, determine the time characteristics of the violation, summarize the duration of violations for the reporting period, compare the actual amount of duration with the allowable one, determine the amount of compensation for the violation and impose sanctions on payment compensation by the perpetrators of violations of these parameters. The article presents an algorithm for adjusting the cost of electricity supplied to consumers depending on the number and duration of voltage deviations and the number and duration of outages. The algorithm serves to ensure the operation of the specified technical and economic method. (Conclusions) The algorithm works in conjunction with a system for monitoring power supply reliability and power quality based on signals from devices that control the number and duration of outages and voltage deviations.


Sign in / Sign up

Export Citation Format

Share Document