scholarly journals Using Gravitational Search Algorithm for in Advance Reservation of Resources in Solving the Scheduling Problem of Works in Workflow Workshop Environment

Author(s):  
Hamid Tavakkolai ◽  
Ali Asghar Rahmani Hosseinabadi ◽  
Mehdi Yadollahi ◽  
Touraj Mohammadpour
2012 ◽  
Vol 2012 ◽  
pp. 1-20 ◽  
Author(s):  
Behnam Barzegar ◽  
Homayun Motameni ◽  
Hossein Bozorgi

Scheduled production system leads to avoiding stock accumulations, losses reduction, decreasing or even eliminating idol machines, and effort to better benefitting from machines for on time responding customer orders and supplying requested materials in suitable time. In flexible job-shop scheduling production systems, we could reduce time and costs by transferring and delivering operations on existing machines, that is, among NP-hard problems. The scheduling objective minimizes the maximal completion time of all the operations, which is denoted by Makespan. Different methods and algorithms have been presented for solving this problem. Having a reasonable scheduled production system has significant influence on improving effectiveness and attaining to organization goals. In this paper, new algorithm were proposed for flexible job-shop scheduling problem systems (FJSSP-GSPN) that is based on gravitational search algorithm (GSA). In the proposed method, the flexible job-shop scheduling problem systems was modeled by color Petri net and CPN tool and then a scheduled job was programmed by GSA algorithm. The experimental results showed that the proposed method has reasonable performance in comparison with other algorithms.


2016 ◽  
Vol 3 (4) ◽  
pp. 1-11
Author(s):  
M. Lakshmikantha Reddy ◽  
◽  
M. Ramprasad Reddy ◽  
V.C. Veera Reddy ◽  
◽  
...  

Sign in / Sign up

Export Citation Format

Share Document