Operational Results of the Wolfsburg Wastewater Treatment Plant
1992 ◽
Vol 25
(4-5)
◽
pp. 203-209
◽
Keyword(s):
At Wolfsburg for a load of 100,000 p.e., the step-feed activated sludge process for nitrogen removal is successfully in operation. Due to the high denitrification potential (BOD:TKN = 5:1) the effluent total nitrogen content can be kept below 10 mg l−1 N; furthermore by some enhanced biological phosphate removal about 80% phosphorus may be removed without any chemicals.
2013 ◽
Vol 2013
◽
pp. 1-6
◽
Automatic control for DO and pH in the activated sludge process in a coke wastewater treatment plant
1998 ◽
Vol 37
(12)
◽
pp. 141-148
◽
2010 ◽
Vol 61
(9)
◽
pp. 2259-2266
◽
2018 ◽
Vol 223
◽
pp. 936-946
◽
1992 ◽
Vol 25
(4-5)
◽
pp. 427-428
◽
2019 ◽
Vol 64
(1)
◽
pp. 113-123