scholarly journals A study on Proposal Methodology for Land Development Project Planning with Large-Scale Construction Project at Local Area in Garden City

1996 ◽  
Vol 4 ◽  
pp. 143-156
Author(s):  
Mamoru HARUNAM ◽  
Mikio TAKEBAYASHI ◽  
Koh UEYAMA ◽  
Kenji YASUMOTO ◽  
Daigo TAMAI ◽  
...  
2014 ◽  
Vol 989-994 ◽  
pp. 5294-5299
Author(s):  
Wei Ma

Technical risk assessment model of large-scale construction project has been established by using triangle whitening weight function of grey theory against the problems of technical risk assessment of large-scale construction project. In the end, through example verification, this model is approved to be feasible and have certain value of reference and utilization in similar problems.


2016 ◽  
Vol 41 (4) ◽  
pp. 333-354 ◽  
Author(s):  
Carolyn Arcand

This article examines whether women’s representation among senior-level construction jobs increased over time during a long-term, large-scale construction project in Boston, Massachusetts, and whether enactment of the Workforce Investment Act (WIA) has fostered support and connection to construction career opportunities for women in this metropolitan area. Results show that the proportion of hours worked by women in senior-level positions on the project was relatively high for a few years, followed by a general decline across all job types, and the WIA did not significantly enhance opportunities for women in construction.


Buildings ◽  
2019 ◽  
Vol 9 (1) ◽  
pp. 15 ◽  
Author(s):  
Kamyar Kabirifar ◽  
Mohammad Mojtahedi

The Construction Industry is a complex and fragmented industry worldwide with regards to its supply chain, products, and processes, and is faced with a similar dilemma as faced by manufacturers during its time in past decades. Scope, time, and cost are the triple constraints of project management and leading factors in defining the project performance. Productivity and efficiency of each construction project is measured through its triple constraints, therefore the factors that affect project success are significantly important. Despite the importance of understanding project performance indicators, few empirical studies have been conducted over the last decade in terms of analyzing the factors that determine the performance of high-rise buildings in Engineering, Procurement, and Construction (EPC) projects. Hence, the aim of this paper is to analyze and rank EPC critical activities across large-scale residential construction projects in Iran, by using the TOPSIS method as a multi-attribute group decision-making technique. Results indicate that engineering design, project planning and controls are significant factors contributing to the project performance. In addition, engineering has a pivotal role in project performance and this significance is followed by the construction phase. On the contrary, all believe procurement is more important than Construction phase.


Sign in / Sign up

Export Citation Format

Share Document