scholarly journals Analyzing the Tropospheric Delay Estimates on Global Navigation Satellite Systems (GNSS) with Precise Point Positioning (PPP) Services using the goGPS software

Author(s):  
Syachrul Arief ◽  
Andrea Gatti

The tropospheric delay is an essential source of error for positioning using the Global Navigation Satellite System (GNSS). Scientific applications of GNSS positioning such as the study of earth crust deformation and earthquake prediction require high accuracy in positioning, an analysis of tropospheric delay calculations is needed to improve the accuracy of GNSS positioning. One part of the tropospheric delay is Zenith tropospheric delays (ZTD), which are estimated using the Precise Point Positioning (PPP) method. ZTD estimates can be beneficial for meteorological applications, for example, is the estimation of water vapor levels in the atmosphere from the estimated ZTD. We use GNSS data from the BAKO station in Cibinong and JOG2 station located in Yogyakarta. The GNSS data format is an Independent Exchange Receiver (RINEX), which we extracted using the sophisticated open-source GNSS software, called goGPS version 1.0 Beta from Geomatics Research and Development s.r.l. - Lomazzo, Italy. We validate the results of the extraction process with two international tropospheric products from International GNSS Services (IGS) with commercial software Bernese version 5 and the University of Nevada Reno (UNR) with software from NASA Jet Propulsion Laboratory (JPL) namely GIPSY / OASIS II. Epoch in this study, we use days of the year (DOY) 022-025 / 22-25 January representing the rainy season and DOY 230-233 to coincide on August 17-20 representing the dry season 2018. Our results obtained ZTD values both in January and August, and the two BAKO and JOG2 stations were consistent and worked well at different times and stations. RMS throughout DOY, both at BAKO and JOG2 stations, show small values <2 mm. The RMS value is relatively small, meaning that the troposphere estimation process with goGPS shows a good agreement because it is almost the same as the international troposphere products from UNR and IGS. This means that the ZTD estimation process from goGPS software can be an alternative to paid software. The range of ZTD values in January tends to be higher than in August, meaning the value of ZTD has a strong correlation with changes in the rainy and dry seasons, this shows that ZTD can be useful for meteorological purposes.

2019 ◽  
Vol 11 (3) ◽  
pp. 311 ◽  
Author(s):  
Wenju Fu ◽  
Guanwen Huang ◽  
Yuanxi Zhang ◽  
Qin Zhang ◽  
Bobin Cui ◽  
...  

The emergence of multiple global navigation satellite systems (multi-GNSS), including global positioning system (GPS), global navigation satellite system (GLONASS), Beidou navigation satellite system (BDS), and Galileo, brings not only great opportunities for real-time precise point positioning (PPP), but also challenges in quality control because of inevitable data anomalies. This research aims at achieving the real-time quality control of the multi-GNSS combined PPP using additional observations with opposite weight. A robust multiple-system combined PPP estimation is developed to simultaneously process observations from all the four GNSS systems as well as single, dual, or triple systems. The experiment indicates that the proposed quality control can effectively eliminate the influence of outliers on the single GPS and the multiple-system combined PPP. The analysis on the positioning accuracy and the convergence time of the proposed robust PPP is conducted based on one week’s data from 32 globally distributed stations. The positioning root mean square (RMS) error of the quad-system combined PPP is 1.2 cm, 1.0 cm, and 3.0 cm in the east, north, and upward components, respectively, with the improvements of 62.5%, 63.0%, and 55.2% compared to those of single GPS. The average convergence time of the quad-system combined PPP in the horizontal and vertical components is 12.8 min and 12.2 min, respectively, while it is 26.5 min and 23.7 min when only using single-GPS PPP. The positioning performance of the GPS, GLONASS, and BDS (GRC) combination and the GPS, GLONASS, and Galileo (GRE) combination is comparable to the GPS, GLONASS, BDS and Galileo (GRCE) combination and it is better than that of the GPS, BDS, and Galileo (GCE) combination. Compared to GPS, the improvements of the positioning accuracy of the GPS and GLONASS (GR) combination, the GPS and Galileo (GE) combination, the GPS and BDS (GC) combination in the east component are 53.1%, 43.8%, and 40.6%, respectively, while they are 55.6%, 48.1%, and 40.7% in the north component, and 47.8%, 40.3%, and 34.3% in the upward component.


2007 ◽  
Vol 42 (3) ◽  
pp. 149-153
Author(s):  
A. Farah

Code Single Point Positioning Using Nominal Gnss Constellations (Future Perception) Global Navigation Satellite Systems (GNSS) have an endless number of applications in industry, science, military, transportation and recreation & sports. Two systems are currently in operation namely GPS (the USA Global Positioning System) and GLONASS (the Russian GLObal NAvigation Satellite System), and a third is planned, the European satellite navigation system GALILEO. The potential performance improvements achievable through combining these systems could be significant and expectations are high. The need is inevitable to explore the future of positioning from different nominal constellations. In this research paper, Bernese 5.0 software could be modified to simulate and process GNSS observations from three different constellations (GPS, Glonass and Galileo) using different combinations. This study presents results of code single point positioning for five stations using the three constellations and different combinations.


2018 ◽  
Vol 71 (6) ◽  
pp. 1363-1380 ◽  
Author(s):  
Ke Su ◽  
Shuanggen Jin

Tropospheric delay is one of the main error sources in Global Navigation Satellite System (GNSS) Precise Point Positioning (PPP). Zenith Hydrostatic Delay (ZHD) accounts for 90% of the total delay. This research focuses on the improvements of ZHD from tropospheric models and real meteorological data on the PPP solution. Multi-GNSS PPP experiments are conducted using the datasets collected at Multi-GNSS Experiments (MGEX) network stations. The results show that the positioning accuracy of different GNSS PPP solutions using the meteorological data for ZHD correction can achieve an accuracy level of several millimetres. The average convergence time of a PPP solution for the BeiDou System (BDS), the Global Positioning System (GPS), Global Navigation Satellite System of Russia (GLONASS), BDS+GPS, and BDS+GPS+GLONASS+Galileo are 55·89 min, 25·88 min, 33·30 min, 20·50 min and 15·71 min, respectively. The results also show that atmospheric parameters provided by real meteorological data have little effect on the horizontal components of positioning compared to the meteorological model, while in the vertical component, the positioning accuracy is improved by 90·6%, 33·0%, 22·2% and 19·8% compared with the standard atmospheric model, University of New Brunswick (UNB3m) model, Global Pressure and Temperature (GPT) model, and Global Pressure and Temperature-2 (GPT2) model and the convergence times are decreased 51·2%, 32·8%, 32·5%, and 32·3%, respectively.


Sign in / Sign up

Export Citation Format

Share Document