scholarly journals Unified Business Intelligence Ecosystem: A Project Management Approach to Address Business Intelligence Challenges

Author(s):  
Bhavana Ramesh ◽  
Akash Ramakrishna
2016 ◽  
Vol 3 ◽  
pp. 5035 ◽  
Author(s):  
Kai Matturi ◽  
Chris Pain

Over the last number of decades there has been a tendency within the international development sector to privilege the management of projects in a siloed manner. This translates to projects managed in a narrow way according to pre-defined parameters of say the education or health sectors. As a project manager you are held accountable for delivering education or health outputs. A shift in donor funding to focus on development projects that are considered easy to administer partly explains this siloed approach to project management within the development sector. However, there is a gradual kick back against the siloed project management approach. Instead we are seeing a return to an integrated managerial approach.An integrated managerial approach involves bringing together various technical specialists to work on common objectives in a coordinated and collaborative manner. A growing number of development actors such as Concern Worldwide are embracing this ‘new approach’. For Concern Worldwide integrated projects are interventions which address multiple needs through coordination across a variety of sectors and with the participation of all relevant stakeholders to achieve common goals. Integrated projects are about sector projects working together with the same target group in the same area in a coordinated manner. This paper reflects on Concern’s experience and evidence to date with integration drawing on the agency’s work in Zambia. The Realigning Agriculture to Improve Nutrition project in Zambia highlights the practical challenges and lessons of managing an integrated project.   


Author(s):  
Lesley G. Boyd ◽  
Jill W. Fresen

This case study is located in the Department for Education Innovation (EI), a teaching and learning support unit at the University of Pretoria in South Africa. The initial problem was the need to apply project management and quality management principles to the services offered by the department to faculty members. The authors describe the implementation of a formal, online, process-based Quality Management System (QMS) designed to self evaluate, document, and improve the Instructional Design (ID) process that guides the development of educational technology solutions in EI. The project was completed in 2005 and was included in a CEN (European Committee for Standardization) Good Practice Guide for outstanding implementations of quality approaches in e-learning. The QMS provides a mechanism to support a consistent project management approach, and the case illustrates successful integration between three cycles: Project Management (PM), Quality Management (QM), and the ADDIE (Analysis, Design, Development, Implementation, and Evaluation) instructional design process.


Author(s):  
Herbert Thomas ◽  
Jessica Hollis

This case involves the implementation of an automated capture solution, aimed at replacing a manual lecture capture service at the University of Canterbury in New Zealand. The implementation of such a solution, within a very short timeframe and subject to a constrained budget, was necessitated by a significant change in lecturer-student interaction brought about by a devastating earthquake and associated aftershocks. In consequence, recently adopted project management methodology at the institution had to be amended in order to incorporate software selection processes under way at another institution. The university project management approach (based on Prince 2 project management philosophy) includes an exhaustive comparison of software packages, based on detailed “Request for Information” and “Request for Proposal” procedures. Severe time constraints forced the project team to omit these procedures by tapping into the same process at another university undergoing the same exercise. This was the only way in which the project could be completed within the proposed timeframe. Currently, the automated capture solution is being prepared for handover from the project manager to the institution in December 2012, as planned.


Author(s):  
Demetrios Sarantis ◽  
Yannis Charalabidis ◽  
Dimitris Askounis

The implementation of electronic Government projects in public sector organisations is a challenging task, due to technical, organisational and cultural specificities of the domain. Research shows that such IT projects have higher failure rates than similar approaches in the private sector, also indicating the lack of a method to transfer knowledge and apply best management practices in an effective way. The proposed management approach aims to recognise structure and reuse past successful attempts, in ways that support the overall viability of an e-Government project. After stating the fundamental principles of project management that apply to public sector IT projects, the authors present a conceptual model for e-Government project management, including entities such as dimensions, goals, activities, deliverables and roles that can be structured and adapted to cover all types of relevant projects in an out-of-the-box approach. This knowledge base of predefined project components can then be populated and utilised in making more informed decisions for effective project management of e-Government initiatives. This way, the proposed method supports public officials and practitioners in learning from past experience projects and in designing and running e-Government projects in a more systematic manner, thus, significantly increasing the likelihood of project success.


2022 ◽  
pp. 190-207
Author(s):  
Siddharth Varma

From small companies to major enterprises, the COVID-19 pandemic put us all to test. While it has left us facing an unpredictable future, it also offers us the chance to create a self-sufficient and self-reliant India, or “Atma Nirbhar Bharat.” The motivation towards a self-reliant India became stronger after the border conflict with China. Being dependent on China for both finished products and raw material, it is imperative for India to reduce this dependence. The “Atma Nirbhar Bharat” needs to be planned and executed as a nationwide program comprising several projects. Successful execution of this program needs to follow a systematic project management approach. This chapter tries to develop a blueprint for planning and execution of this program which is aimed at a self-reliant India.


2007 ◽  
Vol 20 (1) ◽  
pp. 70-82 ◽  
Author(s):  
Tom McBride ◽  
Brian Henderson‐Sellers ◽  
Didar Zowghi

PurposeThe paper seeks to investigate whether project managers regard software development projects as design problems or production problems.Design/methodology/approachProject management literature was examined to determine what evidence there should be to indicate whether a software development project was regarded as a problem to be solved or a product to be produced. Data were then collected through structured interview of project managers currently engaged in managing software development projects. The data were analysed to determine how project managers regarded their projects and whether this matched a theoretical expectation.FindingsThe empirical data indicated that most project managers regard their projects as production problems, where it is assumed that the underlying problem is largely understood, the project encapsulated in a planned schedule of activities and there will be an emphasis on monitoring the project against the planned progress.Research limitations/implicationsOwing to the small sample size of fewer than 30 project managers, external validity is weak. More research is needed to confirm these results over a larger sample and to probe more subtle orientation to production or design projects.Practical implicationsThe research developed a simple test to indicate the degree of novelty of the application to be developed. The test indicates whether the application is novel and should be treated as a design problem, or well known and therefore should be treated as a production problem.Originality/valueThe paper draws attention to the need for project managers to evaluate the type of application to be developed and to adopt an appropriate project management approach. The paper also provides a simple test to achieve that objective.


Author(s):  
Franck Marie ◽  
Jean-Claude Bocquet

Abstract As planning is the action undertaken before execution, it has a great importance as every investment. We identify some problematics in the planning process, and give some lightings about how to make it more efficient and reliable. We propose some methods for managing project at each detail level. We propose the extension of project manager’s concepts to all the people who are accountable for some objective or deliverable. So, there are in a single project a lot of people managing the part they are responsible for as an entire project. We propose a standard methodological kit for them, and we describe the consequences on skills and responsibilities of the project actors, and on the decisions they have to take and efforts they have to undertake to reach their objectives.


Sign in / Sign up

Export Citation Format

Share Document