scholarly journals Project Communication in Functions, Process and Project-Oriented Industiral Companies

Author(s):  
Jana Samáková ◽  
Kristína Koltnerová ◽  
Rudolf Rybanský

Abstract The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

2018 ◽  
Vol 7 (2.29) ◽  
pp. 67
Author(s):  
Sallaudin Hassan ◽  
Natasha Farhana ◽  
Siti Aishah ◽  
Siti Mahirah ◽  
Khairul Firdaus Jimisiah. J

This research aims to evaluate the Critical Success Factors (CSF) of project management and  to assess the level of challenges at each steps in Project Life Cycle (PLC). Five Independent Variable (IV)  is been selected as Critical Success Factors which is Leadership, Effective Communication, Teamwork,  Organization and Project Nature. There are four main stage in project which is Defining, Planning,  Executing and Closure. The scope of this research is on projects/events   conducted under Student  Development and Campus Life Style (SDCL). Five projects has been selected for assessment in this research.  Survey questionnaire is been used as primary data collection. LIKERT Scale is been used to rank the answer from respondents. 50 respondents are involve in this research. Data is analyzed by using SPSS version 21. Result shows that the most critical success factors in project is Team Work while the least Critical Success Factor is Leadership. Meanwhile, the most challenges stage in project management is Executing, while the least challenges stage is Defining. The finding in this research is considered important discovery. More efforts should be focus on identified Critical Success Factor and the most challenges stage in Project Life Cycle.  It is suggested that the scope of study to be extended to other universities or industries in future research.  


2021 ◽  
Vol 26 (3) ◽  
pp. 79-86
Author(s):  
Agnieszka JĘDRUSIK

The purpose of this article is to present the process of risk management in project management. The analysis was based on a comparison of two best practices of IPMA and PRINCE. Risk management differs significantly between the two approaches, but it is up to the organization to choose its own management, monitoring and methodology tailored to the specific industry or sector. Risk management is an important aspect of the entire project life cycle and must be monitored throughout the project life cycle to protect not only the budget but all areas of the so-called "golden triangle". A very important aspect is the organization's awareness that risk management is everyone's responsibility, not just the project manager. This paper presents two different approaches to project risk management in two different methodologies.


2016 ◽  
Vol 2 (1) ◽  
pp. 58 ◽  
Author(s):  
Umar Ammar Altahtooh

Time error is a reality in the majority of projects. This paper presents empirical research which investigates the influence of time error during project life cycle. Data were collected using interviews with project managers and analyzed using content analysis. The findings explore the causes of time error in projects in Yanbu, Saudi Arabia. This study gives an introductory insight into the influence of time error. It finds that time error affects the triple constraints of project management.


Author(s):  
David Hermida ◽  
David De la Fuente ◽  
Fernando García

Project management is focused on planning, executing, monitoring and controlling of all aspects of a project, defined as a temporary effort to carry out a unique result, in order to achieve the targets set under the criteria of time, quality and cost restrictions. In a small or medium-sized organization focused on this type of activity, the integration of the various factors involved in the project life cycle is needed. A roadmap developed as a set of guidelines for effective project management, tailored to this type of organizations but based on the existing sets of best practices and methodological standards (traditionally oriented to huge corporations), is pursued in this work through a comprehensive-qualitative analysis added to an interview approach.


With the ever increasing component of services in a Solar Project, there is a need to do Service Quality studies. With the growing complexities of Engineering – Procurement –Construction (E-P-C) route of Solar Projects, the value of services has climbed up to the present level between 30 to 40 of the project cost, progressively, from a level of 10 to 20%, say 20 to 30 years ago. This situation in turn highlights theplace of a Solar Project in Tangibility Spectrum,[1]which is shifting more towards services and away from Products. Apart from the various Service Quality concepts and Models, SERVQUAL Model[2] by A.Parasuraman et al. and The Gummesson 4Q Model[3] of Offering Quality could be taken up for further surveys and studies , with a view to manage efficiently and effectively, a Solar Project offering. Service Quality is a function of a range of resources and activities. The aim is to establish any variance in how the different stake holders perceived and rated the various dimensions of service quality during thevarious stages of a Project Life Cycle. By developing organization’s own unique service culture and delivering a better quality of service, it should be possible to encourage client loyalty and repeat business.


2011 ◽  
Vol 162 (4) ◽  
pp. 307-324
Author(s):  
Maciej GÓRSKI ◽  
Dariusz SKORUPKA

The article describes the life cycle of a project and a construction investment process. Using the knowledge areas of project management methodologies, the authors focus on the elements of the risk management process. One of the main points of analyses was the selected methods of identifying risk factors. The focus was on the versatility, disadvantages, advantages and results of these methods for their use during a construction project.


Project organizations face the problems to manage knowledge embedded in various projects because of the uniqueness and short-term orientation of most projects. Therefore, project knowledge management is regarded as an important approach to building competitive advantages. This paper aimed to examine the application of storytelling as an effective and inexpensive mechanism for managing project knowledge. The study was conducted with the project management office from the Tax Administration and Reform Automation (TARA) program in Iran. A questionnaire survey was used to analyze the storytelling applications in the projects of the TARA program. Based on the result, a conceptual framework of storytelling was proposed for integration into the project management lifecycle.


Sign in / Sign up

Export Citation Format

Share Document