Factors Affecting Water Alternating Hydrocarbon Gas Miscible Flooding in a Low Permeability Reservoir

Author(s):  
Jiangyan Dong ◽  
Shuhong Wu ◽  
Guoqiang Xing ◽  
Tianyi Fan ◽  
Hua Li ◽  
...  
2013 ◽  
Vol 734-737 ◽  
pp. 1171-1174
Author(s):  
Qi Zhou ◽  
Yan Yi Yin

Discovered in recent years, Chang 4+5 reservoir group of Yanchang Formation in Jiyuan area is ultra-low permeability reservoir. The evaluation and prediction of the reservoir is the most critical technology in reservoir development. Comprehensive analysis with multiple research approaches shows that the storage potential of the ultra-low permeability reservoir is jointly controlled by sedimentation and diagenesis. Sedimentary factor includes lithology and sedimentary facies, two basic factors affecting the storage potential. The reservoir lithology is of fine-grained debris-arkose and miliary arkose. Pore types are mainly intergranular pores and dissolved pores. The sandstone microfacies in the delta front underwater distributary channel has the best storage potential. Diagenetic factors, including diagenesis types, evolution, intensity, combination etc., have direct influence on the reservoir storage potential. Compaction and calcite cementation are the main factors that weaken the storage potential, whereas carbonate dissolution, especially the dissolution of feldspar plays an important role in the improvement of the storage potential.


2014 ◽  
Vol 7 (1) ◽  
pp. 55-63 ◽  
Author(s):  
Haiyong Zhang ◽  
Shunli He ◽  
Chunyan Jiao ◽  
Guohua Luan ◽  
Shaoyuan Mo

2013 ◽  
Author(s):  
Irma Hermawaty ◽  
Robhy Permana ◽  
Frans Silitonga ◽  
Andre Wijanarko ◽  
Amireno Soenoro

2011 ◽  
Vol 361-363 ◽  
pp. 520-525
Author(s):  
Jun Feng Yang ◽  
Han Qiao Jiang ◽  
Han Dong Rui ◽  
Xiao Qing Xie

Physical simulation experiments were made to research on the stress sensitivity on physical property of low permeability reservoir rocks. The experimental results shown that effective pressure had good exponential relationship with reservoir permeability. Combining with materaial balance method, reservoir engineering and rational deducation was made to reserach on water-flooding timing of low permeability reservoir development. Several production targets were obtained by these method, such as formation pressure, water and oil production, water cut and so on. The results shown that advanced water-flooding was very important in low permeability reservoir development to reduce the bad impact of stress sensitivity on formation permeability and maintain formation pressure.


Sign in / Sign up

Export Citation Format

Share Document