scholarly journals Evaluasi Proses Produksi Country kettle Pada PT PLB Dengan Pendekatan Lean Maufacturing

2021 ◽  
Vol 5 (1) ◽  
pp. 68
Author(s):  
Lina Aulia

PT PLB (pseudonym) is a company that produces household appliances and kitchen utensils. The country kettle is one type of product made by PT PLB. The productivity of the country kettle production line decreased by 56%. This was due to defective products. The largest percentage of defects in-country kettle products occurred in the spinning process of 40.18%. This study aimed to identify the causes of defects in-country kettle products and how to overcome them by designing improvement proposals. Lean manufacturing principles were used to evaluate the problems that occur. There were three types of lean manufacturing tools used in this study: Value Stream Mapping (VSM) and 5Ways. VSM was used to describe and identify value-added activities, non-value-added activities but necessary, and non-value-added activities so that the production process becomes lean. The root cause analysis was performed using the 5 Whys method. Unskilled workers and non-standard material types between suppliers are the highest contributors to defects in the spinning process. Based on this, this research was focused on improvements made in the spinning process. Proposals for improvements to the causes of the problems found are standardization of work procedures, standardization of supplier specifications, and arrangement of semi-finished goods and/or supplies. Based on the company's results, the proposed standardization of work procedures and arrangement of semi-finished goods and/or supplies may be implemented in the company. Meanwhile, the proposal for selecting suppliers is not feasible due to company limitations

2020 ◽  
Vol 6 (1) ◽  
pp. 65-74
Author(s):  
Ratna Novitasari ◽  
Irwan Iftadi

PT XYZ merupakan sebuah perusahaan manufaktur yang bergerak dalam penyedia alat-alat rumah tangga, salah satunya adalah kulkas. Pada proses produksi Door PU di divisi refrigerator terdapat permasalahan pencapaian output produksi yang lebih rendah dibandingkan dengan target produksi pada Door PU produk kulkas 1 pintu serta freezer. Penelitian ini membahas mengenai analisis lean manufacturing pada proses identifikasi dan minimasi waste yang ada pada proses Door PU di divisi refrigerator PT XYZ. Penelitian dilakukan dengan 4 tahapan. Tahap pertama adalah pembuatan Value Stream Mapping (VSM) untuk menunjukan keseluruhan proses produksi Door PU. Tahap kedua dilakukan identifikasi waste dan break down tahapan proses produksi dalam bentuk process activity mapping. Tahap ketiga adalah proses identifikasi akar permasalahan dari waste yang telah diketahui dengan menggunakan root cause analysis - 5 Why's. Berdasarkan penelitian yang dilakukan, didapatkan hasil waste berupa waiting dan defect, dengan nilai operasi value added sebesar 11,54%, non value added 7,69%, dan operasi necessary  non value added sebesar 76,43%. Rekomendasi perbaikan mampu mengurangi total aktivitas proses dari 26 menjadi 24 serta peningkatan nilai PCE menjadi 31,45%.


2016 ◽  
Vol 14 (2) ◽  
pp. 299 ◽  
Author(s):  
Wahyu Adrianto ◽  
Muhammad Kholil

Engine maintenance strives to always improve its service excellence with tools such as gate system where the system is expected to realize the lead time for 60days. In the implementation of the gate system is still not able to meet the expected target. During maintenance or overhaul the engine is still encountered waste or waste that causes the target cannot be met. Lean Manufacturing is an approach that aims to minimize waste that occurs in the process flow.Understanding the conditions of the process described in Value Stream Mapping for further elaborate activities that have the value-added and non-value added.Through seven waste concept, then be weighted to determine the most dominant type of waste.From the data processing is obtained that through the Value Stream Mapping is known gate 1 and gate 3 is the point that there are many wastes. Weighting and ranking of seven existing waste in the process of the activity obtained results in the form of a waste critical sequence of seven existing waste. Highest weights on the type of waste waiting with a weight of 0.38. Results of Root Cause Analysis in mind that the root cause of waste waiting for that data is maintained, the lack of attention to people development, There are still bugs in the system and miscommunication.


ICCD ◽  
2019 ◽  
Vol 2 (1) ◽  
pp. 123-126
Author(s):  
Zulfa Fitri Ikatrinasari ◽  
Kosasih Kosasih ◽  
Nico Alexander Vizano

Value stream mapping (VSM) is one of the tools in Iean manufacturing that can be used to improve the efficiency of a company. VSM can describe material flow and information flow from upstream to downstream, from suppliers to consumers. VSM can be used to identify waste through sorting each activity into value-added or non-value-added activities. VSM training that begins with providing understanding of the concept of lean manufacturing is expected to increase the ability of workers to improve and enhance the performance of their companies. This training gives good results, seen from the results of discussions and presentations of each group in a given case study


2020 ◽  
Vol 3 (4) ◽  
pp. 509-521
Author(s):  
Wresni Anggraini ◽  
Anifah Naswan Ilhamda

Standar pelayanan minimal rumah sakit tentang waktu tunggu untuk rawat jalan yang ditetapkan oleh Kemenkes Nomor. 129/Menkes/SK/II/2008 adalah tidak lebih dari 60 menit.  Masalah yang dihadapi oleh Poli Tulip Rumah Sakit X Pekanbaru adalah waktu menunggu pasien lebih dari 60 menit.  Tujuan dari penelitian ini adalah memberikan usulan perbaikan untuk mengurangi waktu tunggu pasien.. Metode yang digunakan pada penelitian ini adalah  lean healthcare menggunakan analisis Value Stream Mapping (VSM) untuk menentukan nilai Process Cycle Efficiency (PCE). Berdasarkan current state value stream mapping nilai PCE saat ini adalah 16,85%, ini berarti efisiensi lini pada Poli Tulip Rumah Sakit X Pekanbaru masih sangat rendah. Proses usulan perbaikan efisiensi lini dengan cara mengidentifikasi dan mengurangi non value added activity dan waste yang paling sering terjadi pada proses pelayanan pasien. Ditemukan waste yang berpengaruh menyebabkan waste delay adalah waste unnecessary movement dan lost oppurtunity to retain or win customers yaitu sebesar 22,11%. Untuk mencari akar penyebab waste dilakukan root cause analysis. Akar penyebab masalah dari waste yang terjadi di lini pelayanan pasien bersumber dari faktor individual pegawai dan manajerial Rumah Sakit. Simulasi future state value stream mapping dengan menggunakan ARENA dilakukan untuk menguji usulan perbaikan, didapatkan  nilai PCE harapan sebesar 36,18 %, yang berarti dengan usulan perbaikan yang diberikan telah meningkatkan efisiensi jalur layanan pasien di Poli Tulip sebesar 19,33%.


2014 ◽  
Vol 19 (4) ◽  
pp. 244-255 ◽  
Author(s):  
Ying Zhu ◽  
Zhenqi Lu ◽  
Hongqin Dai

Abstract Background: The peripherally inserted central catheter implantation and maintenance process was optimized at Shanghai Fu Dan University Cancer Center using lean-based methodology. Problems addressed were coping with capacity limitations and streamlining the process of patient care to reduce potential complications associated with delays in catheter administration. These clinical processes were evaluated with regard to pretreatment areas—such as booking, waiting, and patient education—and solutions were recommended to the problems that were identified. Methods: Lean methodology was used under actual clinical settings to improve the clinical process, using observations, patient surveys, interviews, data analysis, and a kaizen workshop. Three tools were applied from lean methodology: value stream mapping, bottleneck calculation, and fishbone root cause analysis. The philosophy of kaizen was used to enhance teamwork, boost morale, and encourage all members of the frontline nursing team and administration leaders to contribute ideas and suggestions for improvement. Results: A value stream map and a redesigned future value stream map were plotted at the workshop to identify problems related to inefficiency and waste and to aid in proposing solutions. Implementation of these solutions resulted in smooth and steady patient distributions on days with the largest patient volume during a typical week and an increase of 30% in the number of patients that could be seen in a week. Conclusions: The economic methodology of lean manufacturing, especially value stream mapping, can be a powerful tool for visualizing and better understanding processes to reduce waste and reengineer a standardized workstream in settings where peripheral intravenous central catheters are placed.


Author(s):  
V. Saravanan ◽  
S. Nallusamy ◽  
Abraham George

Productivity is an important parameter for all small and medium scale manufacturing industries. Lean manufacturing emerged as production strategy capable of increasing productivity by identifying and eliminating non value added activities. This article deals with productivity improvement in a pre-assembly line of gearbox manufacturing company with a case study using lean concepts like process flow chart, process Gantt chart and time study. This paper illustrates using a case study on how a value stream mapping has to be carried out in a planet carrier pre-assembly line. Value stream mapping and work standardization are the key tools used in lean manufacturing and lean transformation. It makes the process smoother, helps in reduction of lead time and ultimately increasing the productivity. From the observed results it was found that, the productivity has been increased from 7 pieces to 10 pieces in the first step assembly when the proposed VSM was implemented. The second step processing time was reduced by the execution of proposed value stream mapping with TAKT time of 126 minutes and 165 minutes of processing time for demand of 10 pieces were achieved and the overall processing time has been reduced by about 24%.


ARIKA ◽  
2020 ◽  
Vol 14 (1) ◽  
pp. 23-36
Author(s):  
M. L. Pattiapon ◽  
N. E. Maitimu ◽  
Irene Magdalena

UD. Filkin adalah salah satu perusahaan industri yang bergerak di bidang mebel. Salah satu produknya adalah pintu. Dalam produksinya, terdapat berbagai jenis waste yang sering terjadi tanpa disadari, karena telah dianggap sebagai sesuatu yang wajar dan umum, padahal sesungguhnya sangat merugikan, dan seharusnya bisa dihindari, sehingga pada hasil identifikasi ditemukan beberapa jenis waste yang diantaranya waiting, innappropiateprocessing dan overproduction.Maka tujuan penelitian ini adalah untuk mengidentifikasi dan mengevaluasi penyebab waste yang terjadi dalam lantai produksi, dan juga memberikan rekomendasi perbaikan untuk mengurangi waste di lantai produksi. Salah satu metode yang dapat digunakan untuk mengurangi atau mengeliminasi waste adalah dengan metode Lean Manufacturing.Pendekatan Lean Manufacturing dilakukan dengan menganalisis waste dengan value stream mapping, menentukan waste dan mengidentifikasi akar penyebab masalah atau peristiwa dengan root cause analysis, dan merancang rekomendasi perbaikan untuk mengatasi waste tersebut.Berdasarkan hasil penelitian diketahui bahwa tiga waste dengan rangking tertinggi adalah waiting dengan skor (17,1%), innappropiateprocessing (16,5%) dan overproduction (15,9%). Sehingga untuk mengurangi wastewaiting disarankan agar melakukan pelatihan dan penambahan pekerja. Untuk mengurangi wasteinnappropiateprocessing disarankan untuk meningkatkan pola pemahaman pekerja terhadap keinginan konsumen. Dan untuk mengurangi waste overproduction disarankan untuk melakukan perencanaan ulang terhadap produk yang akan dibuat, yang sesuai dengan permintaan pasar.


2019 ◽  
Vol 5 (1) ◽  
pp. 1-7
Author(s):  
Catur Kusbiantoro ◽  
Ellysa Nursanti

CV. Tanara Textile merupakan salah satu perusahaan tekstil yang termasuk dalam kelompok industri penyempurnaan kain berupa kain kaos. Pada proses produksi di perusahaan masih ditemukan beberapa waste. Penelitian ini bertujuan untuk mengidentifikasi dan menurunkan waste yang terjadi pada proses produksi maka digunakan pendekatan lean manufacturing. Metode Value Stream Mapping (VSM) digunakan untuk pemetaan aliran produksi dan aliran informasi terhadap suatu produk pada tingkat produksi total, melakukan wawancara untuk pembobotan penyebab 7 waste yang sering terjadi pada proses produksi, VALSAT untuk menganalisa pemborosan dari hasil pembobotan yang selanjutnya melakukan detailed mapping tools, serta analisis FMEA untuk mengetahui penyebab kegagalan prosesyang terjadi di lini produksi lalu menghitung nilai RPN tertinggi. Selanjutnya melakukan usulan perbaikan untuk menurunkan waste unnecessary inventory serta menganalisis perbaikan secara berkelanjutan dengan PDCA. Waste terbesar ada pada Unncessary Inventory sebesar 28,571% faktor penyebabnya adalah penumpukan bahan baku, work in process (WIP), sparepart yang tidak terpakai dan penimbunan pada finished goods Sebelum perbaikan proses produksi 16 hari 9 jam dimana Value Added 6 hari 4 jam dan Lead Time 10 hari 4 jam, setelah perbaikan proses produksi menjadi 14 hari 5 jam dimana Value Added 6 hari 4 jam dan Lead Time 8 hari 1 jam, dengan demikian dapat meningkatkan process cycle efficiency sebesar 17,19% dan menghemat lead time sebesar 2,546% dengan penurunan waste sebesar 8,31%


2011 ◽  
Vol 110-116 ◽  
pp. 2062-2066 ◽  
Author(s):  
Paramdeep Singh ◽  
Harpuneet Singh

Lean manufacturing has been proved to be an effective management philosophy for improving businesses in a competitive market by eliminating non-value added waste and improving in process operations. Value stream mapping is an important tool used to identify the opportunities for various lean techniques. The present research mainly focuses on the description of a model that is developed to contrast the “before” and “after” scenarios in detail in order to obtain the various benefits such as reduced production lead time, lower work in process inventory [1] and proper utilisation of the workforce. The current manufacturing system has been compared with the proposed pull (Kanban) system which shows the benefits of the proposed lean manufacturing system over the existing traditional manufacturing system. The present research work has been carried out at typical tractor industry which shows 50.5% reduction in total lead time in the future state value mapping of the crank case and the number of operators involved in processing of crank case has also been reduced from 22 to 18.


2018 ◽  
Vol 220 ◽  
pp. 02005
Author(s):  
Abdillah Arif Nasution ◽  
Ikhsan Siregar ◽  
Anizar ◽  
Tigor Hamonangan Nasution ◽  
Khalida Syahputri ◽  
...  

This research was conducted in manufacturing industry, so this research is based on case study application. This research serves to reduce waste in the industry when making a product. This study categorizes value-added work and which work has no added value. And it is measurable and has value, so it can be evaluated in the future. Later this will be poured or depicted on a map called Value stream mapping. This is a tool from Lean Manufacturing. Lean manufacturing is useful for analysing and reducing non value-added activities, value stream mapping analysis tools, 5L1H process mapping activities, and 5 why tools. From the results of this study obtained the efficiency of the process cycle and total estimation of the improvement of the lead time. This calculation can be an evaluation material for the company.