THE BALANCED PRODUCTION LOAD OF A MACHINE-ENGINEERING ORGANIZATION
The article deals with an approach to calculation of equipment, employee or work centers load during the production plan forming by machine engineering organizations. The calculations are based on the duration of manufacturing operations and the electronic structure of items, and provide the most balanced workload at the shortest time of production. The article describes the model of item production and the technique of production plan forming according to each work center with the set of calculation constraints. It also calculates the efficiency of an equipment load and time of production based on the current production plan. The calculation of load plan for work centers is provided by auxiliary software module of an interactive web-resource using the T-SQL.