The Wafra First Eocene Reservoir in the Partitioned Neutral Zone (PNZ), Saudi Arabia and Kuwait: Geology and reservoir modeling for the large scale steamflood pilot

Author(s):  
W. Scott Meddaugh ◽  
Kera Gautreau ◽  
Niall Toomey and Stewart Griest
Minerals ◽  
2018 ◽  
Vol 8 (7) ◽  
pp. 271 ◽  
Author(s):  
Michael Zhdanov ◽  
Fouzan Alfouzan ◽  
Leif Cox ◽  
Abdulrahman Alotaibi ◽  
Mazen Alyousif ◽  
...  

Author(s):  
Paul-Emile Durand ◽  
Lucas Wise ◽  
Emmanuel Joy ◽  
Alain Rossetto

<p>In June 2013, three consortia were awarded the three construction packages that constitute the whole Riyadh Metro Project in Saudi Arabia for a total of 6 lines and 180 kilometres.</p><p>International Bridge Technologies was in charge, as a subconsultant of Idom, of the complete structural scope of services for the 25.6 km of elevated viaduct that Riyadh Metro Package 2 comprises (Line 3, around 41.6 km, out of which 25.6 km are elevated). This scope consisted of the full range of services from conceptual tender design to final detailed design, including shop drawings production, construction engineering and construction site support.</p><p>The Line 3 elevated viaduct consists of a three-cells precast segmental box-girder with typical simply-supported spans of 37 m and special continuous spans of 50 m. Six long span structures with spans varying from 60 m to 95 m were required for the special crossings over existing interchanges. Typical and continuous spans are erected span-by-span with an overhead truss while long spans are erected in balanced cantilever with cranes on the ground or lifting frames on the deck.</p><p>The present paper is centred on the design of the elevated viaduct and presents the different structures with key features and how they were constructed to permit large scale standardisation and speed of construction. Some key design aspects are developed, in particular the design approach for the 3-cells box-girder as the most effective solution to satisfy the imposed aesthetic criteria. This paper also exposes the design approach adopted to produce a “design-for-demand” by relying as much as practically possible on a realistic modelling of the alignment and by limiting parametric design. This allowed for an optimisation of material quantities.</p>


Author(s):  
Mohammad Baydoun

This case aims to analyze risk management practices of Millennium Development International (MDI) and suggest enhancements based on a theoretical framework derived from the literature while considering the implications to its organizational structure. Al-Shamiyah project in Makkah, Saudi Arabia, is used as an example to illustrate the practices of MDI. Due to a high level of risk associated with large-scale development projects, it is argued that the traditional risk management approach is not convenient to the context of these projects. Each large-scale project has a high level of uniqueness that renders benchmarks generated out of previous projects obsolete. Hence, a reactive risk management approach is being promoted. For the purpose of optimizing this approach, engaging necessary experts and securing the presence of key decision makers in the process, the formulated system defines key milestones at which risks need to be assessed and proper decisions need to be taken.


2016 ◽  
pp. 1220-1237 ◽  
Author(s):  
Mohammad Baydoun

This case aims to analyze risk management practices of Millennium Development International (MDI) and suggest enhancements based on a theoretical framework derived from the literature while considering the implications to its organizational structure. Al-Shamiyah project in Makkah, Saudi Arabia, is used as an example to illustrate the practices of MDI. Due to a high level of risk associated with large-scale development projects, it is argued that the traditional risk management approach is not convenient to the context of these projects. Each large-scale project has a high level of uniqueness that renders benchmarks generated out of previous projects obsolete. Hence, a reactive risk management approach is being promoted. For the purpose of optimizing this approach, engaging necessary experts and securing the presence of key decision makers in the process, the formulated system defines key milestones at which risks need to be assessed and proper decisions need to be taken.


Sign in / Sign up

Export Citation Format

Share Document