Water Resources Carrying Capacity Analysis of Huangshui River during the Period of the Twelfth Five-Year Plan

2015 ◽  
Vol 1092-1093 ◽  
pp. 1202-1208
Author(s):  
Ming Xia Jing

This paper predicted HuangShui River carrying capacity level of environmental resources at the end of the "twelfth five-year" period and even longer, based on the economic and social development in the base year 2011 data, to provide reference for the development of various government related department reference.

2014 ◽  
Vol 955-959 ◽  
pp. 3036-3039
Author(s):  
Yun Li Shi

Water scarcity has become a bottleneck that restricts the sustainable economic and social development of China Shandong Province. This paper analyzes the carrying capacity, development and utilization, and problems of water resources in Shandong Province, proposes ways to improve water resources carrying capacity, and builds a sustainable and balanced water resources security system for the construction of Bohai Economic Rim, to promote coordinated development between water resources and economy, society and environment.


2021 ◽  
Vol 276 ◽  
pp. 01009
Author(s):  
Jinxing Li ◽  
Lianfeng Ke ◽  
Le Yang ◽  
Heshuai Qi

With the rapid economic and social development, human disturbances to the ecosystem have become more and more intense. However, the scale of regional economic and social development, supported by regional water resources, has boundaries. The central government and local governments of all levels have clearly proposed to carry out water resources carrying capacity evaluation and early warning. From the perspective of the actual management of the county water administrative department, with the administrative divisions within the county as the basic unit, the principle of index selection and index grading standards determination is proposed, and an index system including the four major levels of society, economy, water resources, and ecology is constructed. Then, combined with the functions of various government departments, the basic framework of a universal water resources carrying capacity early warning mechanism, including three major processes: carrying capacity evaluation and update, early warning information release, and implementation of differentiated control measures, is proposed.


Sign in / Sign up

Export Citation Format

Share Document