Research on Model of Comprehensive Fuzzy Assessment of Projects Post Evaluation
2011 ◽
Vol 261-263
◽
pp. 566-570
Keyword(s):
We generally use methods of statistical forecasting and antithesis in projects post evaluation, but they can only be used as a qualitative evaluation but as a quantitative evaluation. Based on the fuzzy mathematics, this text presents a better quantitative mathematical analysis-fuzzy comprehensive evaluation method. And then, it established a model of comprehensive fuzzy assessment of projects post evaluation. At last, it illustrate that the model of comprehensive fuzzy assessment can evaluate projects post evaluation accurately and quantitatively.
2011 ◽
Vol 71-78
◽
pp. 3946-3949
◽
2011 ◽
Vol 271-273
◽
pp. 573-576
◽
2014 ◽
Vol 1073-1076
◽
pp. 1141-1144
The Assessment and Research of Seismic Performance for Large-Scale Bridge Based on Fuzzy Mathematics
2011 ◽
Vol 255-260
◽
pp. 1125-1129
2013 ◽
Vol 351-352
◽
pp. 1298-1301
2021 ◽
Vol 787
(1)
◽
pp. 012194