An Application of Comprehensive Geological Prediction Methods in a High-Speed Railway Tunnel
2013 ◽
Vol 639-640
◽
pp. 279-282
Keyword(s):
The tunnel involved in this study is a double-track tunnel with a 4113m length and 390m maximum depth which is currently under construction. By analyzing the specific engineering geological and hydro geological conditions and summarizing the past geological prediction techniques, the comprehensive geological prediction methods are adopted in the project, and the accuracy and feasibility of the theory and techniques are verified in the practical construction process. It is concluded that the comprehensive geological prediction methods are conducive to reduce the risks, accelerate the schedule and guarantee the quality of the construction, and provided a good guidance and reference for the tunnel constructions of this kind
2014 ◽
Vol 580-583
◽
pp. 1096-1099
◽
Keyword(s):
2021 ◽
Vol 111
◽
pp. 103851
Keyword(s):
2020 ◽
Vol 79
(5)
◽
pp. 2201-2212
2014 ◽
Vol 716-717
◽
pp. 342-346
Keyword(s):
2018 ◽
Vol IV-3
◽
pp. 273-276
Keyword(s):