Short-Circuit Current Criterion under Condition of Protection Action in Low Voltage Power Supply System

2013 ◽  
Vol 860-863 ◽  
pp. 1914-1918
Author(s):  
Yi Rong Su ◽  
Jie Yu ◽  
Jun Liu ◽  
Gan Zhou ◽  
Li Ping Zhan ◽  
...  

In order to improve the level of automation and security of the low voltage power supply system, this paper proposed the calculation method of short-circuit current criterion under condition of protection action. Firstly, the impact of circuit breakers on the short-circuit current is analyzed. Then, the current criterion under condition of short-circuit protection are given. Finally, using a special case, the calculation process of aforementioned current criterion is given in detail.

2001 ◽  
Vol 21 (8) ◽  
pp. 61-61
Author(s):  
S. Huang ◽  
B. Chen ◽  
Y. Kuo ◽  
K. Lu ◽  
M. Huang

2001 ◽  
Vol 16 (4) ◽  
pp. 492-497 ◽  
Author(s):  
Sy Ruen Huang ◽  
Yueh Lung Kuo ◽  
Bing Nan Chen ◽  
Kwang Chang Lu ◽  
Min Chuian Huang

2011 ◽  
Vol 219-220 ◽  
pp. 1109-1112
Author(s):  
Man Yin Hu ◽  
Chao Du ◽  
Bo Yang

According to operation situation of power plant’s EP, the technical measures of energy saving in low-voltage power supply system have been analyzed over the years. Based on the classical theory of electrostatic precipitator and the operating status quo of EP, the paper has been focused on the principles of energy-saving and emission-reduction EP, established high-voltage current supply energy-saving and emission-reduction EP dust removal efficiency of mathematical models, analyzed energy saving and emission reduction technical measures of the low voltage device and proposed the technical solutions. It provided reference for design, adjustment, operation and energy saving of power plant’s EP.


2014 ◽  
Vol 1006-1007 ◽  
pp. 955-961
Author(s):  
Xing Wang Li ◽  
Ju Rui Yang

Continuous co-phase traction power supply system is the major change of the traction power supply. It is important to analyze the transient response characteristics of overhead contact line for the traction substation feeder protection. This article introduces the main structure of continuous co-phase traction power supply system and the control strategy of traction substation. Meanwhile, transient responses of overhead contact line in the earth short circuit are studied, including metallic earth short circuit and non-metallic earth short circuit (high resistance ground). In the PSCAD/EMTDC electromagnetic transient simulation environment, the effects on the system and the recovery process are studied which the fault occurred in the output interface of traction substation and occurred in overhead contact line.


Author(s):  
Oleg Arsent'ev ◽  
Evgeniy Krylov

the questions of the organization of power supply system with control elements to reduce the impact of peak loads on the operation of electrical equipment and reduce energy costs


2020 ◽  
Vol 79 (3) ◽  
pp. 139-144
Author(s):  
E. P. Figurnov ◽  
Yu. I. Zharkov ◽  
N. A. Popova

When calculating short circuit currents in the traction network, it is necessary to take into account the input resistance of the traction substation, including the resistance of the transformers of the substation and the resistance of the power supply system. The input resistance during short circuit is determined based on the equivalent circuit of the external power supply system, of which this traction substation is an integral part. Traditionally equivalent circuit of a three-phase system has the form of a star, in which the resulting resistances in each phase are connected in series with a source of phase electromotive force, and these sources have a common point. Another equivalent circuit in the form of a triangle is possible, in which on each side the resulting resistances are connected in series with the source of linear electromotive force. It is important to note that neither one nor the other type of equivalent circuit is determined by the connection scheme of the transformer windings of the traction substation. It is only necessary to take into account the absence of a circuit for zero sequence currents. All elements of the equivalent circuit, as is known, should be brought to uniform basic conditions. If the parameters of these elements are expressed in named units, then the basic values are the effective voltage values of the main stage and the rated power of the power transformer of the traction substation. If the components of one and the other equivalent circuits are reduced to one stage of the operating voltage, for example 27.5 kV, then for the same elements of the power supply system, the resistance values in the equivalent circuit in the form of a triangle are three times larger than in the equivalent circuit in the form of a star. In this case, the input resistances of the traction substation for the one and the other equivalent circuits are absolutely identical. Therefore, in the calculation of short circuit currents of the traction network, you can use any of these equivalent circuits of the power supply system and traction substation. Formulas for calculating the resistances of the elements of the power supply system and electrical installations, given in the standards, manuals and reference books, relate to the equivalent circuit of the short circuit in the form of a star. When using an equivalent circuit in the form of a triangle, these resistances must first be tripled, and then divided by three when calculating the short-circuit currents. The meaninglessness of such an operation is obvious. The equivalent circuit of the traction substation and the external power supply system in the form of a triangle when calculating short circuits in the traction network has no advantages compared to the traditional equivalent circuit in the form of a star. The information on the linear currents on the primary and secondary windings of the traction substation transformer during a short circuit in the traction network is given, which is necessary to select the settings of its relay protection kit.


2019 ◽  
Vol 78 (1) ◽  
pp. 10-18 ◽  
Author(s):  
Yu. I. Zharkov ◽  
N. A. Popova ◽  
E. P. Figurnov

When calculating short-circuit currents in the AC traction network, it is assumed that each of the traction substations receives power from uncoupled external power supply sources with known resistances. In some cases, especially when powering a group of traction substations from a high-voltage power line of a longitudinal power supply, the external power supply system affects not only the magnitude of short-circuit currents, but also their redistribution between adjacent traction substations of the interstation area where this circuit is considered. Such unrecorded redistribution can have a negative effect on short circuit protection. The article considers the equivalent circuit of the traction network, taking into account resistance of the external power supply system. Particular attention is paid to the fact that in replacement circuits of direct and negative sequence value of reduced resistance of one phase of a multiwinding transformer, calculated from the short circuit voltage, does not depend on the connection scheme of its windings. It is noted that in some cases it is difficult to obtain a complete scheme of an external power supply system. Considering that the short circuit in the traction network for the external power supply system is remote, it is proposed taking into account the reference network or traction substations as power sources, from which high-voltage transmission lines power the traction substations. Resistance of the supporting substations as power sources must takes into account connected equivalent power system.Such equivalenting should be carried out by known values of currents or short-circuit powers at the inputs of the reference substation or, if such information is not available, by the rated values of the switched-off currents or powers of the switches of high-voltage line connections.The following power schemes for traction substations are considered: each from its own supporting substation, which is part of an electrically uncoupled external power supply system; from the double-circuit high-voltage line of longitudinal power supply when it is powered from different supporting substations; from the supporting network substation, the traction substation receives power from two lines, and from this the traction substations receive power from two lines in a circle pattern.These three common cases cover all the most common power schemes for traction substations. For each of them formulas are given to determine the resulting equivalent resistance of the external power supply circuit, which should be taken into account in the replacement circuit of the traction network.


Sign in / Sign up

Export Citation Format

Share Document