Brake By Wire Functional Safety Concept Design for ISO/DIS 26262

Author(s):  
Jae Seung Cheon ◽  
Jongsung Kim ◽  
Jaehan Jeon ◽  
Sang Mok Lee
2017 ◽  
pp. 123-145
Author(s):  
Andreas Reschka ◽  
Gerrit Bagschik ◽  
Markus Maurer

2016 ◽  
Vol 12 (1) ◽  
pp. 25-32
Author(s):  
D. Gabriška

Abstract The article describes the main requirements of the software subsystems management development. Standard IEC 61508-3 provides an overview at all stages of the life cycle of all security systems, including E/E/PE of a security system from initial concept, design, and implementation to operation maintenance. In this paper we analyzed set out requirements for the drafting of a software architecture that is consistent with the hardware architecture while meeting specified requirements for software safety.


ATZ worldwide ◽  
2018 ◽  
Vol 120 (9) ◽  
pp. 48-53
Author(s):  
Anunay Krishnamurthy ◽  
Bastian Holderbaum

2014 ◽  
Vol 24 (s1) ◽  
pp. 152-164
Author(s):  
Karl Ernst Neitzel ◽  
Rüdiger Kaffenberger

2017 ◽  
Vol 50 (1) ◽  
pp. 7278-7283
Author(s):  
Pierre Mauborgne ◽  
Samuel Deniaud ◽  
Éric Levrat ◽  
Éric Bonjour ◽  
Jean-Pierre Micaëlli ◽  
...  

Energies ◽  
2021 ◽  
Vol 14 (4) ◽  
pp. 947
Author(s):  
Barbara Tchórzewska-Cieślak ◽  
Katarzyna Pietrucha-Urbanik ◽  
Mohamed Eid

Within the frame of upgrading and modernisation of the Water Supply System (WSS), our work is focussing on the safety systems/devices implemented or that should be implemented in the WSS. The implementation of safety systems is supposed to reduce hazard occurrence and hazardous consequences in case of a WSS unsafe disruption. To assess this reduction, we preconise the use of the safety integrity levels standards. The implementation of the safety systems/devices is undertaken on the ground of the multi-barriers safeguard approach. The “Water Contamination Hazard” is considered in the paper. A case study is presented, assessed and conclusions are drawn. The methodology presented in the paper and the results of the case study assessment will contribute to the decision-making regarding the upgrading of the safety and the performance of the WSS.


Sign in / Sign up

Export Citation Format

Share Document