Application of Logical Framework Method in Post Evaluation of Power Grid Construction Projects

2021 ◽  
2018 ◽  
Vol 53 ◽  
pp. 01043
Author(s):  
Qiang Sun ◽  
Zhenhua Cai ◽  
Yangfan Liu ◽  
Jun Zhang

The construction of Green Power Grid is not only a strong measure responding to national policy to build beautiful China for power grid enterprises, but also one of the social responsibilities they should take. Combining both domestic and international green building standards, this paper is aimed to introduce and summarize the design management, investment research and post-evaluation management in the construction of Green Power Grid of Guangdong Power Grid Corporation.


2012 ◽  
Vol 622-623 ◽  
pp. 1852-1855 ◽  
Author(s):  
Dong Xiao Niu ◽  
Huan Huan Qiao ◽  
Hui Juan Zhai ◽  
Xin Lu

Combined with the characteristics of the power grid construction projects, based on the fishbone diagram theory, the paper gradually identifies the cost risk factors in power grid construction projects according to the project construction process of project decision-making and feasibility study phase, design and bidding phase, construction phase,and completion of final accounts and summary evaluation phase. The study provides a certain amount of reference for power grid construction project risk management and controlling grid construction costs.


Sign in / Sign up

Export Citation Format

Share Document