scholarly journals Pengembangan Rencana Induk Sistem Pemerintahan Berbasis Elektronik Provinsi Bali

2020 ◽  
Vol 1 (3) ◽  
pp. 253-276
Author(s):  
I Wayan Muka ◽  
Made Adi Widyatmika ◽  
I Ketut Gde Darma Putra
Keyword(s):  

Tujuan: Tujuan penelitian ini adalah untuk mendapatkan data dari masing-masing OPD Provinsi Bali terkait penerapan E-Government (SPBE), menentukan kondisi penerapan E-Goverment (SPBE) di Provinsi Bali dan menentukan langkah strategis untuk meningkatkan indeks tingkat kematangan SPBE Provinsi Bali. Metode penelitian: Metode penilaian evaluasi dilakukan melalui pengukuran tingkat kematangan berdasarkan e-Government Maturity Model (eMM). Temuan: Kajian ini mengungkap bahwa kelemahan utama dalam implementasi SPBE Provinsi Bali, terutama di beberapa OPD yang memberikan layanan publik, adalah belum terintegrasinya aplikasi atau sistem dan masih lemahnya SDM dan infrastruktur IT di masing-masing OPD. Implikasi: Langkah yang perlu dilakukan adalah menyusun Rencana Induk Pengembangan SPBE yang memiliki kelengkapan pada sisi muatan visi dan misi SPBE, arsitektur SPBE, peta jalan SPBE serta integrasi sistem aplikasi dan penggunaan aplikasi umum secara menyeluruh.

2019 ◽  
Vol 5 (2) ◽  
pp. 109-115
Author(s):  
Johanes Fernandes Andry ◽  
Gunawan Wang ◽  
Gusti Ngurah Suryantara ◽  
Devi Yurisca Bernanda

PT Hema Indonesia is manufacturing company established in 2001 and has continued to grow. Nowadays the company has supported business processes in various companies, such as the use of information systems. The purpose of this research is to get an overview of the performance of information systems in order to determine the extent of maturity level which is currently running, with a few aspects to consider such as effectiveness and, efficiency. Implementing IT governance, however, is a challenge to organizations. To ensure IT alignment with business goals use standard COBIT. The analytical tool used is the standard procedure COBIT issued by ISACA. In this paper the method to be used is COBIT 4.1. Coverage of Audit IT Domain are Plan Organize (PO), such as PO4, PO5, PO7 and PO8. The conclusion that can be drawn from the research that has been done is IT governance at the company has been done, although still run optimally within each IT process contained in the sub domain average on level repeatable and defined proses.


2018 ◽  
Vol 23 (2) ◽  
pp. 95-106
Author(s):  
Mahendra Sunt Servanda ◽  
Achmad Benny Mutiara

The use of information and communication technology in a company gives an important contribution for the achievement of business objectives. PT Perusahaan Gas Negara, especially in the Business Solutions and Services Operations (BSSO), plays a significant role in the utilization of information and communication technology assets to PT Perusahaan Gas Negara. It takes a good IT governance for BSSO to improve the efficiency and effectiveness of IT usage. Audit of IT governance maturity using COBIT 4.1. Maturity model level used to determine the maturity level of IT usage in the enterprise with a scale of 0 (non-existent) to 5 (optimized). This study focused on two domains namely Plan and Organise (PO) and Monitor and Evaluate (ME) model to measure the maturity level of IT maturity levels in PT Perusahaan Gas Negara. From this study, the results of the maturity level domain PO is 3.13 and ME is 2.98, it can be given the conclusion that the maturity level of IT governance at PT PGN is in level 3 (defined). At this level means that all the procedures in the company are standardized and documented, but the company is still not able to detect the deviations that have occurred.


2014 ◽  
Vol 4 (1) ◽  
Author(s):  
Padma Tripathi

The present study was conducted to examine the implementation of PCMM in the Indian IT Industry by analyzing the perceptions of managers regarding the reasons for PCMM implementation, people related issues and benefits of PCMM. The objectives of the study were to gain a conceptual understanding of PCMM, to examine the methods and application of PCMM in IT industry and to gain an overview of the dissemination of PCMM on organizational field by focusing on the implementation of PCMM in organizations, and its impact on the effectiveness of people management and the overall business. Based on the findings of literature review a questionnaire was developed using Google Docs. Subjects of this study were managers belonging to middle and higher managerial positions of various IT companies with PCMM certification ranging from Level 2 to Level 5. The data collected was then analyzed using statistical tools like SPSS and Microsoft Excel. The survey brought out that the reasons for PCMM certification do not vary significantly across IT companies. The Level of PCMM to which an employee’s organization belonged had a significant impact on his/her perception of factors leading to success of IT projects. Reducing turnover was rated as the most prevalent issue followed by overcoming low morale and burnout, and identifying competencies. Integrating workforce development with process improvement was ranked as the most important benefit of PCMM implementation.


2014 ◽  
Vol 7 (2) ◽  
pp. 263-284 ◽  
Author(s):  
Budi Hartono ◽  
Deo F.N. Wijaya ◽  
Hilya M. Arini

Purpose – The purpose of this paper is to develop and to empirically verify a model of project risk management maturity (PRMM). Design/methodology/approach – Theoretical work to develop the initial model of risk maturity. Empirical study by a cross-sectional survey to the Indonesian construction industry. Findings – A new model of PRMM is developed and empirically tested. The model is valid (face validity, content validity, discriminant validity, convergent validity, and criterion validity) and reliable. Research limitations/implications – A more comprehensive, follow-up study is required to gain more insights on the actual maturity level of Indonesian construction industry. Practical implications – The model is applicable to assess the organizational maturity level which in turn could be used for improving organization performance. Originality/value – The work demonstrates a novel approach in developing models by emphasizing on the empirical verification.


Sign in / Sign up

Export Citation Format

Share Document