scholarly journals A COMPARATIVE EARTHWORK AND COST ANALYSIS OF IMPROVING AN EXISTING RAILWAY LINE AND CONSTRUCTING A NEW HIGH-SPEED LINE IN TURKEY

Author(s):  
K. A. Gumus ◽  
V. E. Gulal

In the past few decades, high-speed railways have become an important transportation system due to their high operational speed, and globally, the networks of these railways have been extended. In addition, there is ongoing work on the construction of new high-speed railways as well as improving existing lines to achieve the same operational speed. To contribute to high-speed railway works in Turkey, this study compared two high-speed railway lines; an existing conventional line, the design of which was improved, and a new high-speed line. The design of an existing conventional railway line was improved according to optimal geometric characteristics of high-speed railways and an alternative line was simulated. These two lines were evaluated on three different types of land in terms of the required volume of earthworks, engineering structures and total cost. The results show that the length of the conventional line was reduced after the improvement process; however, new engineering structures are needed. Furthermore, compared to the alternative line, the track length and total length of engineering structures required for the improvement of the existing line was shorter and the volume of required earthworks was less resulting in lower costs.

Energies ◽  
2021 ◽  
Vol 14 (15) ◽  
pp. 4648
Author(s):  
Zhipeng Tang ◽  
Ziao Mei ◽  
Jialing Zou

The carbon intensity of China’s resource-based cities (RBCs) is much higher than the national average due to their relatively intensive mode of development. Low carbon transformation of RBCs is an important way to achieve the goal of reaching the carbon emissions peak in 2030. Based on the panel data from 116 RBCs in China from 2003 to 2018, this study takes the opening of high-speed railway (HSR) lines as a quasi-experiment, using a time-varying difference-in-difference (DID) model to empirically evaluate the impact of an HSR line on reducing the carbon intensity of RBCs. The results show that the opening of an HSR line can reduce the carbon intensity of RBCs, and this was still true after considering the possibility of problems with endogenous selection bias and after applying the relevant robustness tests. The opening of an HSR line is found to have a significant reducing effect on the carbon intensity of different types of RBC, and the decline in the carbon intensity of coal-based cities is found to be the greatest. Promoting migration of RBCs with HSR lines is found to be an effective intermediary way of reducing their carbon intensity.


2014 ◽  
Vol 716-717 ◽  
pp. 342-346
Author(s):  
Xiao Jun Zhou ◽  
Bo Jiang ◽  
Yue Feng Zhou ◽  
Yu Yu

On the basis of different landform and multifarious topography in rugged mountainous area in southwest China, typical tunnel portals for single track tunnels in a new high speed railway line have been presented in the paper. The portal comprises headwall, shed tunnel, bridge abutment and its support. Portal with headwall is suitable for tunnel to resist front earth pressure on high and abrupt slope. Shed tunnel is placed in front of headwall so as to prevent rockfall; its outward part is built into a flared one. Meanwhile, the installation of bridge and its abutment are also included in the portal according to landform in the paper.


Author(s):  
Linggang Kong ◽  
Shuo Li ◽  
Xinlong Chen ◽  
Hongyan Qin

Vehicle on-board equipment is the most important train control equipment in high-speed railways. Due to the low efficiency and accuracy of manual detection, in this paper, we propose an intellectualized fault diagnosis method based on adaptive neuro-fuzzy inference system (ANFIS) network. Firstly, we collect the fault information sheets that are recorded by electrical personnel, using frequency weighting factor and principal component analysis (PCA) to realize the data extraction and dimension reduction; Then, in order to improve the fault diagnosis rate of the model, using genetic algorithm (GA) to optimize the parameters of the ANFIS network; Finally, using the fault data of a high-speed railway line in 2019 to test the model, the optimized ANFIS model can achieve 96% fault diagnosis rate for vehicle on-board equipments, which indicating the method is effective and accurate.


2017 ◽  
Vol 20 (3) ◽  
pp. 107
Author(s):  
V V Zagrebin

Предлагается модель анализа текущего состояния существующей инфраструктуры железнодорожной магистрали с целью последующего принятия организационно-технических решений на этапе инициации проекта высокоскоростной железнодорожной магистрали. Описываются возможные современные способы реализации высокоскоростного сообщения и их отличия в проектных и организационных решениях. Представлены основные элементы инфраструктуры железнодорожной магистрали, отдельно выделены факторы, влияющие на увеличение скорости движения. Представлена методика анализа, этапы и последовательность его проведения, принцип определения объектов анализа, возможные способы сбора данных по объектам анализа, перечень отраслевых геоинформационных и автоматизированных систем сбора и обработки оперативной информации по текущему состоянию инфраструктуры и эксплуатационной работе, методика обработки, обобщения, систематизации полученных данных для последующего анализа. Разработан общий алгоритм комплексного анализа технических и эксплуатационных параметров магистрали в виде последовательной блок-схемы. Данная модель актуальна при проведении анализа состояния инфраструктуры для всех существующих железнодорожных магистральных линий на территории России при выборе оптимальных и эффективных проектных решений совместно с экономическим обоснованием в процессе разработки комплексных мероприятий по внедрению высокоскоростного сообщения.


Innotrans ◽  
2021 ◽  
pp. 3-7
Author(s):  
Nakip Z. Sabirov ◽  
◽  
Shamil K. Valiev ◽  

The article deals with the issues of resource saving on railways. Approaches to the definition of the essence of resource saving are highlighted. The influence of high-speed railway lines on the change in the structure of labor resources is revealed. The tasks of improving the resource management system and specific resources on railway transport are defined. Special attention is paid to railway automation and telemechanics systems, which will significantly reduce the labor costs of the HSR. The specific energy costs for different types of transport and per passenger-kilometer are given.


Sign in / Sign up

Export Citation Format

Share Document