Real-Time 3D Visualization of Accurate Specular Reflections in Curved Mirrors - A GPU Implementation

2020 ◽  
pp. 1-5
Author(s):  
Usman Khan ◽  
Usman Khan ◽  
AmanUllah Yasin ◽  
Imran Shafi ◽  
Muhammad Abid

In this work GPU implementation of classic 3D visualization algorithms namely Marching Cubes and Raycasting has been carried for cervical vertebra using VTK libraries. A proposed framework has been introduced for efficient and duly calibrated 3D reconstruction using Dicom Affine transform and Python Mayavi framework to address the limitation of benchmark visualization techniques i.e. lack of calibration, surface reconstruction artifacts and latency.


2021 ◽  
Author(s):  
Chingis Oshakbayev ◽  
Roman Romanov ◽  
Valentin Vlassenko ◽  
Simon Austin ◽  
Sergey Kovalev ◽  
...  

Abstract Currently drilling of horizontal wells is a common enhanced oil recovery method. Geosteering services are often used for accurate well placement, which makes it possible to achieve a significant increase in production at relatively low cost. This paper describes the result of using seismic data in three-dimensional visualization for high-quality geosteering using a deep boundary detection tool and multilayer inversion in real time. Crossing the top of the reservoir while drilling horizontal sections at the current oilfield is unacceptable, due to the presence of reactive mudstones. In case of crossing the top of reservoir, further work on running and installing the liner becomes impossible due to instability and may lead to well collapse. Based on prewell analysis of the structural data, the well was not supposed to approach the top of the target formation along the planned profile. However, while preparing geosteering model and analyzing seismic data it became possible to reveal that risk, elaborate its mitigation and eventually increase the length of the horizontal section. Such integrated analysis made it possible to maintain the wellbore within the target reservoirs, as well as to update the structural bedding of the top based on the multilayer inversion results.


2021 ◽  
Author(s):  
Tongkum Tossapol ◽  
Khamawat Siritheerasas ◽  
Feras Abu Jafar ◽  
Trinh Dinh Phu ◽  
Pham Nam Hieu

Abstract The Well X in Nong Yao field, is an infill-well designed for the Gulf of Thailand which presented several interesting challenges due to its complexity, tortuosity, and potential collision risks with other wells. This paper demonstrates the application of a Real-time Advanced Survey Correction (RASC) with Multi Station Analysis (MSA) to correct the Measurement While Drilling (MWD)'s azimuth. The Well X is a 3D Complex design with a high drilling difficulty index (DDI) at 6.9, high tortuosity of 316 degree, and which has an aggressive build on inclination and azimuthal U-turning well path. The well also creates difficult doglegs severity (DLS) up to 5.5deg/100ft, which is near the limit of the flexibility required to achieve the horizontal landing point. The conventional MWD survey, with proximity scanning with the nearby Well A, demonstrates high risk with a calculated Oriented Separation Factor (OSF) of 1.01. The RASC-MSA method is applied with a clearly defined workflow during execution in real-time and provide significant improvement in calculated OSF. RASC-MSA is applied for every 1,000 ft interval drilling below the 9.625in casing shoe. The workflow ensures that the directional driller follows the corrected survey along the well path and especially in the last 300 ft before reaching the electrical submersible pump (ESP) tangent section. The result from RASC-MSA, indicated a 29 ft lateral shift on the left side of the MWD standard surveys. Without this technique, Well X has a high potential to collide with Well A and Well B (Figure 1) as the actual OSF may less than 1 while drilling. The final 3D Least Distance proximity scanning with Well A shows a minimum OSF = 1.35, which is a 30% improvement compared to the conventional MWD survey. Another nearby well, Well B, indicates a minimum OSF=1.66 and passed the anti-collision OSF rule. In consideration of the drilling efficiency, availability, cost effectiveness and time saving, the RASC-MSA analysis to correct the MWD's azimuth are applied and the separation factor can be improved by 30%. In conclusion, the collision risk management technique applied successfully met the complex challenges of Well X, which was successfully drilled and safely delivered. Figure 1 3D visualization to exhibit the collision issue between Well X and nearby existing Wells A and Well B.


2013 ◽  
Vol 373-375 ◽  
pp. 888-891
Author(s):  
Fang Liu ◽  
Wei Tong ◽  
Zhi Jun Qian ◽  
Yu Hong Dong

This paper introduced the laboratory model of Real-time monitor system based on the 3D Visualization for calefaction furnace, depicted the process of the model.In this paper we created a virtual environment and transport the real-time data which we collected from the locale to the virtual scene,to realize the real time monitor on the real environment.Through simulating in the lab,the effect of this system was realistic at the same time it arrived at the goal of better monitoring with better real-time.


Sign in / Sign up

Export Citation Format

Share Document