scholarly journals Network Theory-Based Analysis of Construction Project Risks

2016 ◽  
Vol 5 (2) ◽  
pp. 24
Author(s):  
Hafida Lmoussaoui ◽  
Hicham Jamouli

<p>Because of their specific and complex characteristics, construction projects are exposed to numerous risks of various natures, which make their management more difficult. In this setting, Project Risk Management is an indispensable activity for their successful delivery. It consists in the risk identification, assessment, prioritization, treatment, monitoring and control. This paper presents a novel approach for the identification of construction project risks and a network theory-based methodology for their modelling and analysis. These models serve as a powerful tools comparing to classical methods and provide a support for decision-making regarding Project Risk Management. A case study of a real construction project is used to illustrate these findings.</p>

2019 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Santosh B. Rane ◽  
Prathamesh Ramkrishana Potdar ◽  
Suraj Rane

Purpose The purpose of this paper is to identify the risks involved in the construction project based on a literature survey (LS), to develop a project risk management (PRM) framework based on Industry 4.0 technologies and to demonstrate the developed framework using Internet of Things (IoT) technology. Design/methodology/approach A comprehensive LS was carried out to know the different risks involved in the construction project and developed a PRM framework based on Industry 4.0 technologies to increase the effectiveness and efficiency of PRM. Heavy equipment and parameters were identified to demonstrate the developed framework based on IoT technology of Industry 4.0. Findings This paper demonstrates Industry 4.0 in the various stages of PRM. LS has identified 21 risks for a construction project. The demonstration of the PRM framework has identified the sudden breakdown of equipment and uncertainty of equipment as one of the critical risks associated with heavy equipment of construction project. Research limitations/implications The project complexity and features may add a few more risks in PRM. Practical implications The PRM framework based on Industry 4.0 technologies will increase the success rate of the project. It will enhance the efficiency and effectiveness of PRM. Originality/value The developed framework is helpful for the effective PRM of construction projects. The demonstration of PRM framework using IoT technology provides a logical way to manage risk involved in heavy equipment used in a construction project.


2020 ◽  
Vol 8 (2) ◽  
pp. 237-243
Author(s):  
Oğuzhan Yavuz Bayraktar

The major requirement of every construction project is meeting client’s need of cost, quality and time. However, the construction industry is overwhelmed with risks more than any other industry due to the fact that they are present in every activity from design to completion. These risks need to be controlled early or face the possibility of cost overruns, time delays and poor quality work leading to displeasure of client and public. Although risk management in construction projects is a very important issue in terms of the firms operating in the construction sector, it has not yet gained clarity and prevalence in our country. Within the scope of this research, the aim of this research is to introduce the risk management system as a concept and to classify the risk in construction projects and to demonstrate the risk management techniques. Risk management system is a cyclic process. In the monitoring and control phase of applied risk responding strategies, some of the risks will be eliminated or reduced, some of unforeseen risks will appear and analysis steps will be realized again. At the end of the project, determination of to what degree project aims and targets have been reached and documentation of risk management system after evaluation regarding to the project will enable the company to use project risk management system more effectively and usefully in the projects undertaken later. Due to construction activities, processes, environment and organization’s structures, construction industry and the clients are broadly in relation with high risk degrees. Therefore, it is highly important for our country’s firms in construction industry to give necessary significance to project risk management idea and system and to consider them as a basic function of the projects for permanence of their enterprise existence.


2020 ◽  
Vol 8 (2) ◽  
pp. 237-243
Author(s):  
Oğuzhan Yavuz Bayraktar

The major requirement of every construction project is meeting client’s need of cost, quality and time. However, the construction industry is overwhelmed with risks more than any other industry due to the fact that they are present in every activity from design to completion. These risks need to be controlled early or face the possibility of cost overruns, time delays and poor quality work leading to displeasure of client and public. Although risk management in construction projects is a very important issue in terms of the firms operating in the construction sector, it has not yet gained clarity and prevalence in our country. Within the scope of this research, the aim of this research is to introduce the risk management system as a concept and to classify the risk in construction projects and to demonstrate the risk management techniques. Risk management system is a cyclic process. In the monitoring and control phase of applied risk responding strategies, some of the risks will be eliminated or reduced, some of unforeseen risks will appear and analysis steps will be realized again. At the end of the project, determination of to what degree project aims and targets have been reached and documentation of risk management system after evaluation regarding to the project will enable the company to use project risk management system more effectively and usefully in the projects undertaken later. Due to construction activities, processes, environment and organization’s structures, construction industry and the clients are broadly in relation with high risk degrees. Therefore, it is highly important for our country’s firms in construction industry to give necessary significance to project risk management idea and system and to consider them as a basic function of the projects for permanence of their enterprise existence.


Buildings ◽  
2021 ◽  
Vol 12 (1) ◽  
pp. 2
Author(s):  
Sanna Ullah ◽  
Nadeem Ahmad Mufti ◽  
Muhammad Qaiser Saleem ◽  
Amjad Hussain ◽  
Rab Nawaz Lodhi ◽  
...  

Risk appetite is a crucial component that plays a key role in the decision-making process of project risk management. Despite rising scholarly interest in project risk management, risk appetite has received little attention thus far. A well-defined risk appetite ensures that all decisions taken throughout the course of a project are consistent with an organization’s ultimate strategic aim. This research aims to identify the factors affecting the risk appetite of megaproject selection in the construction sector. The study adds to the knowledge of risk appetite in mega construction project selection and qualitatively examines the factors affecting risk appetite. Exploratory research design is used to identify these factors. The factors are identified using semi-structured interviews of 30 practitioners from the top and middle management working on mega construction projects. Thematic analysis was performed using NVIVO academic software. The most highlighted factors are financial attributes, board of directors’ agility, political factors, project location and demographics. The proposed conceptual framework identifies the factors affecting the risk appetite of mega construction project selection. These factors may be utilized as a starting point by construction project organizations to evaluate the risk appetite of a mega construction project. Risk appetite-based project selection will decrease chances of failures, delays, and cost overruns in mega-projects. These factors can be used by researchers as a rationale for developing predictive or descriptive models of project selection based on risk appetite.


Author(s):  
Alfredo Federico Serpell ◽  
Ximena Ferrada ◽  
Larissa Rubio

Abstract The function of project risk management (PRM) is to understand the uncertainty that surrounds a project and to identify the potential threats than can affect it as well as to know how to handle these risks in an appropriate way. Then, the measurement of the performance of PRM becomes an important concern, an issue that has not yet been addressed in the research literature. It is necessary to know how successful the application of the PRM process is and how capable is the process within the organization. Regarding construction projects, it is essential to know whether the selected responses to mitigate or eliminate identified risks were suitable and well implemented after the execution of the project. This paper presents a critical analysis of the relevance of measuring the performance of PRM and the benefits of doing so. Additionally, it presents a preliminary and pioneering methodology to measure the performance of PRM through the evaluation of the adequacy of responses applied to mitigate risks as well as to evaluate the resulting impacts as indicators of the effectiveness of these actions at the end of the project. This knowledge will allow construction companies to incorporate good practices, generate lessons learned, and thereby to promote a continuous improvement of the whole PRM process.


2019 ◽  
Vol 7 ◽  
Author(s):  
Matej Masár ◽  
Mária Hudáková

Current trends show that education in the field of project risk management is a very actual topic. Long - term projects, which was realized in 2018, was mainly focused on R&D across the world. Short - term projects, was focused on innovation and improve manufacturing processes. Many projects failed because project managers did not manage project risks. Project managers have less knowledge and skills on how to effectively manage project risks, especially risks in the planning phase of projects. The main aim of this article is to analyze the current state of usage project risk assessment across the world, based on own empirical research, which was provided, by authors in 2018 and 2019 (mainly level of usage project risk management methods, experience and level of education). The research focused on analyzing the current state of project risk assessment among continents. The authors focused on the average level of use qualitative and quantitative project risk analysis by project managers, level of project risk management experience by project managers and complexity of learning in using of qualitative and quantitative project risk management methods and tools.  Some recommendation were established to educate project managers in the field of project risk management.


2018 ◽  
pp. 1606-1632
Author(s):  
Radu-Ioan Mogos ◽  
Constanta-Nicoleta Bodea ◽  
Stelian Stancu ◽  
Augustin Purnus ◽  
Maria-Iuliana Dascalu

During the last years, the development of the project risk management competencies became a ubiquitous objective for education and training in project management due to the increasing constraints which companies face on the implementation of their projects. Alignment to the professional standards and usage of innovative methods in designing and delivery of instruction represent common requirements that education and training providers should consider and fulfill. The authors examine the main challenges in addressing project risk management subject in the education programmes and identify how these challenges could be dealt by using curriculum management systems. In order to implement the identified improvements, the authors propose an innovative architecture for a curriculum management system, which can be adopted by those universities interested in developing competencies-based programmes in project management. Some preliminary results are presented and discussed.


2011 ◽  
Vol 243-249 ◽  
pp. 6362-6368
Author(s):  
Yan Zhang ◽  
Chang Jiang Liu

In the field of engineering and construction, unqualified construction quality, time delays, cost more than expected phenomena to occur. Because of these characteristics such as its large-scale construction projects, long cycle, the production of single and complex, there is greater risk than the production of general products, the risk increases the difficulty of construction project management, operating costs and the possibility of potential losses, therefore, risk management emerged and become an increasingly important integral part of project management. In this paper, fuzzy analytic hierarchy be used to construction project risk assessment, and to order the sort of each risk in order to prevent significant risks. On an actual project - the new stadium construction in Weifang City risk management case study, the reduction of risk of project failure is expected, but also the project is hoped for other industries to provide some reference for risk management.