hydraulic condition
Recently Published Documents


TOTAL DOCUMENTS

35
(FIVE YEARS 8)

H-INDEX

4
(FIVE YEARS 1)

2019 ◽  
Vol 14 (2) ◽  
pp. 275-286 ◽  
Author(s):  
Ewelina SZAŁKIEWICZ ◽  
◽  
Tomasz DYSARZ ◽  
Tomasz KAŁUŻA ◽  
Albert MALINGER ◽  
...  

2018 ◽  
Vol 227 ◽  
pp. 209-215 ◽  
Author(s):  
N. Sepehrnia ◽  
L. Memarianfard ◽  
A.A. Moosavi ◽  
J. Bachmann ◽  
F. Rezanezhad ◽  
...  

Author(s):  
Binsar Silitonga ◽  
Hendry Hendry

The planning process of an intake water building must be conducted properly, such by considering several aspects namely topography, hydro-climatology, and also hydraulic condition of existing stream. In the planning of intake water building, the dimensions of water gate are based on the existing weir building. The Existing Dam building in this study is Sei Bingei weir. This weir was constructed to detain the flow of Bingei River. The weir is used to collect water to fill the demand of water company (PAM) Tirta Sari Binjai City.


Sign in / Sign up

Export Citation Format

Share Document