scholarly journals Perencanaan Hidrolis Pintu Pada Bangunan Pengambilan Air (Intake)

Author(s):  
Binsar Silitonga ◽  
Hendry Hendry

The planning process of an intake water building must be conducted properly, such by considering several aspects namely topography, hydro-climatology, and also hydraulic condition of existing stream. In the planning of intake water building, the dimensions of water gate are based on the existing weir building. The Existing Dam building in this study is Sei Bingei weir. This weir was constructed to detain the flow of Bingei River. The weir is used to collect water to fill the demand of water company (PAM) Tirta Sari Binjai City.

2006 ◽  
Author(s):  
Michael Ziessler ◽  
Dieter Nattkemper ◽  
Stefan Vogt ◽  
Samuel Ellsworth ◽  
Jonathan Sayers

Author(s):  
Akhmad Ulul Albab

This thesis aims to examine the management process applied in the Madrasah Murottilil Qur'an Al-Rifa'ie 2 Malang. Beginning with the curriculum planning process, implementing the curriculum, and how to evaluate the curriculum of the Madrasah Murottilil Qur'an Al-Rifa'ie 2 Malang. This research aims to find out and describe the managerial process of the curriculum, and the inhibiting factors in the implementation of efforts to achieve the vision, mission that has been set.This thesis is a report on the results of field research using a qualitative descriptive method with a case study research approach that takes place at the Al-Rifa'ie 2 Malang Boarding School.Data collection is done by interview, observation, and documentation. Data analysis is done by reducing data, then presenting data, and finally from the compiled data conclusions are drawn. Checking the validity of the data is done with credibility which includes Triangulation, peer checking, extension of observation time, increasing perseverance.The results of the analysis show that the curriculum management implemented by p Madrasah Murottilil Qur'an Al-Rifa'ie 2 At the planning stage, the process carried out was planning the implementation time, the learning program, making the academic calendar, and how the evaluation was held. At the implementation stage, it starts with a new santri test, conducts learning and conducts an ascension test. The evaluation process is carried out at least 2x in one month, and 1 and after one semester.


2019 ◽  
pp. 149-159
Author(s):  
Yury M. Goland

The article reviews the implementation of the perspective planning in the USSR during the period of the New Economic Policy — NEP, from methodological discussions to the development of five-year plans — sectoral and for the entire national economy. The article analyzes the discussion of the proposal of the first five-year plan submitted by S. Strumilin at the congress of planning bodies in March, 1927. It is shown that the sharp criticism of this plan for being imbalanced by the leading economists of the country, in particular, V. Bazarov and N. Kondratiev, is valid. The author points out the influence of political factors on the planning process. The popular cliche that the forced industrialization in the five-year plan was necessary to prepare for the war is refuted.


Author(s):  
О. Д. Донець ◽  
В. П. Іщук

The basic results of calculation and research works carried out in the process of creation of power unit of regional passenger airplanes’ family are given. The design features of the propulsion engines and engine of the auxiliary power plant are described. The aforementioned propulsion system includes propulsion engines D-436-148 and engine AI-450-MS of auxiliary power plant. In order to comply with the requirements of Section 4 of the ICAO standard (noise reduction of the aircraft in site), in part of ensuring the noise reduction of engines, when creating the power plant of the An-148/An-158 aircraft family, a single- and double-layer acoustic filler was used in the structure of the engine nacelle and air intake. The use of electronic system for automatic control of propulsion engines such as FADEC and its integration into the digital airborne aircraft complex ensured the operation of engines, included in the power plant provided with high specific fuel consumption, as well as increased the level of automation of the power plant control and monitoring, and ensured aircraft automation landing in ICAO category 3A. In addition, the use of the aforementioned electronic system, allowed to operate the power plant of the aircraft in accordance with technical status. The use of the AI-450-MS auxiliary power plant with an electronic control system such as FADEC, and the drive of the service compressor from a free turbine, eliminated the effect of changes in power and air takeoff, on the deviation of the engine from optimal mode, which also minimized the fuel consumption. The use of fuel metering system TIS-158, allowed to ensure control of its condition and assemblies, without the use of auxiliary devices, built-in control means. In the fire protection system, the use of the electronic control and monitor unit, as well as the use of digital serial code for the exchange of information between the elements of the system and the aircraft systems, has reduced the number of connections, which increased the reliability of the system and reduced its weight characteristics.


2017 ◽  
Vol 1 (1) ◽  
pp. 1-16
Author(s):  
John Harner ◽  
Lee Cerveny ◽  
Rebecca Gronewold

Natural resource managers need up-to-date information about how people interact with public lands and the meanings these places hold for use in planning and decision-making. This case study explains the use of public participatory Geographic Information System (GIS) to generate and analyze spatial patterns of the uses and values people hold for the Browns Canyon National Monument in Colorado. Participants drew on maps and answered questions at both live community meetings and online sessions to develop a series of maps showing detailed responses to different types of resource uses and landscape values. Results can be disaggregated by interaction types, different meaningful values, respondent characteristics, seasonality, or frequency of visit. The study was a test for the Bureau of Land Management and US Forest Service, who jointly manage the monument as they prepare their land management plan. If the information generated is as helpful throughout the entire planning process as initial responses seem, this protocol could become a component of the Bureau’s planning tool kit.


Author(s):  
N.S. Mustafa ◽  
N.H.A. Ngadiman ◽  
M.A. Abas ◽  
M.Y. Noordin

Fuel price crisis has caused people to demand a car that is having a low fuel consumption without compromising the engine performance. Designing a naturally aspirated engine which can enhance engine performance and fuel efficiency requires optimisation processes on air intake system components. Hence, this study intends to carry out the optimisation process on the air intake system and airbox geometry. The parameters that have high influence on the design of an airbox geometry was determined by using AVL Boost software which simulated the automobile engine. The optimisation of the parameters was done by using Design Expert which adopted the Box-Behnken analysis technique. The result that was obtained from the study are optimised diameter of inlet/snorkel, volume of airbox, diameter of throttle body and length of intake runner are 81.07 mm, 1.04 L, 44.63 mm and 425 mm, respectively. By using these parameters values, the maximum engine performance and minimum fuel consumption are 93.3732 Nm and 21.3695×10-4 kg/s, respectively. This study has fully accomplished its aim to determine the significant parameters that influenced the performance of airbox and optimised the parameters so that a high engine performance and fuel efficiency can be produced. The success of this study can contribute to a better design of an airbox.


Sign in / Sign up

Export Citation Format

Share Document