Abstract
This paper presents an economical assessment of the benefits of introducing 5G technologies into pilot use cases pertaining to the railroad transportation and energy sectors. For each of the pilots, undergone by EFACEC Engenharia e Sistemas and EFACEC Energia, respectively, under the scope of the H2020 5Growth project, evaluates the expenditure and benefits expected from introducing 5G capabilities over their on-going operations. This evaluation is expressed regarding the Portugal case, and are also scaled to assess the European-wide case. The main objective of the study summarized in this paper is to understand if solutions proposed by the H2020 5Growth project, and 5G as a whole, are also advantageous from an economic point of view. The results of the techno-economic analysis reported in this paper show, on a European scale, millions of euros saved by the different stakeholders involved in the deployment of 5G solutions.