surcharge preloading
Recently Published Documents


TOTAL DOCUMENTS

66
(FIVE YEARS 19)

H-INDEX

9
(FIVE YEARS 3)

2022 ◽  
Vol 2148 (1) ◽  
pp. 012031
Author(s):  
Jinfang Hou ◽  
Jian Yu

Abstract The foundation of the immersed tube transition section of the Hong Kong-Zhu Hai-Macao Bridge Project is distributed with thick silty soil. The method of sand compaction pile + surcharge preloading is used to treat the soft soil ground. In order to determine the foundation consolidation settlement and subsequent residual settlement in the transition section of the immersed tube tunnel, a monitoring system using long wires combined with wireless transmission and long-distance data collection was developed to obtain the measured foundation settlements during the surcharge period. After comparing the measured value with the calculated value, the formula for the composite foundation of the sand compaction pile was revised to obtain a more reasonable residual settlement of the foundation, which could guide the design and construction of the immersed tube tunnel.


2021 ◽  
Vol 2021 ◽  
pp. 1-11
Author(s):  
Daqing Wang ◽  
Dong Wei ◽  
Guoyi Lin ◽  
Jiannan Zheng ◽  
Zhiting Tang ◽  
...  

Combined vacuum and surcharge preloading has gradually been widely used because of its advantages of low cost, green environmental protection, and good treatment effect. The conventional prefabricated vertical drain presents obvious defects in vacuum preloading treatment, such as obvious silting, serious bending of the drainage board, large attenuation of vacuum degree of drainage board along the depth, long construction period, and so on, which affect the final reinforcement effect. In this paper, the MIDAS finite element simulation of combined vacuum and surcharge preloading of prefabricated vertical drains (PVDs) and prefabricated horizontal drains (PHDs) is established through the comparative experiment of the engineering field. The comparative experimental study is carried out from the aspects of the vertical settlement, horizontal displacement, and pore water pressure. The results show that under combined vacuum and surcharge preloading, the consolidation effect of soft soil with PHDs is better than that with PVDs. When PHDs are used, the vertical settlement increases by 7.2% compared with PVDs; the horizontal displacement is larger; and the pore water pressure dissipates faster. This is because when the PHDs are adopted, the consolidation direction of the soil is consistent with the direction of the vacuum suction, which is mainly caused by vertical settlement. With the consolidation, the spacing between PHDs is gradually shortened, and the drainage distance is reduced, which can effectively reduce the consolidation time and improve the reinforcement effect of the soil. In addition, the PHDs can move downward uniformly with the soil during the consolidation process and have almost no bending deformation, which makes the vacuum transfer more uniform and effective.


2021 ◽  
Vol 2021 ◽  
pp. 1-10
Author(s):  
Linjie Li ◽  
Shuaidong Yang ◽  
Tong Su

The permeability coefficient and void ratio are related to the stress state of the soil, which manifests as the temporal and spatial variability of consolidation. Based on the modified Cambridge model, this paper quotes the functional relationship between the soil permeability coefficient and void ratio and soil stress obtained by Tylor’s research and then uses finite-element software ABAQUS and its secondary development platform to establish a plastic drainage plate surcharge preloading numerical model that considers the influence of the void ratio and permeability coefficient with stress changes. The results show that considering the variability of the permeability coefficient in the consolidation process of the soft foundation has a great influence on the change of the consolidation state but has a small effect on the final consolidation state. For soft foundation surcharge preloading reinforcement treatment, if the strength of the soft foundation is low but the surcharge is large, the geometric nonlinearity and material nonlinearity should be considered. Using the theory of large deformation consolidation to calculate the consolidation of soil is closer to the actual situation.


2021 ◽  
Author(s):  
Jun Wang ◽  
Heng Zhuang ◽  
Lin Guo ◽  
Yuanqiang Cai ◽  
Mingfeng Li ◽  
...  

2021 ◽  
Vol 49 (1) ◽  
pp. 304-322
Author(s):  
Trong Nghia Nguyen ◽  
Dennes T. Bergado ◽  
Mamoru Kikumoto ◽  
Phuoc H. Dang ◽  
Salisa Chaiyaput ◽  
...  

Author(s):  
Dikang Zhang ◽  
Hongtao Fu ◽  
Jun Wang ◽  
Dongqi Zhu ◽  
Xiuqing Hu ◽  
...  

2020 ◽  
Vol 3 (3) ◽  
pp. 911
Author(s):  
Michael Christopher Yapriadi ◽  
Inda Sumarli ◽  
Ali Iskandar

The development in Indonesia continues to grow. Hence, the feasible land for construction is drastically decreased. However, some projects must be constructed on that kind of land. One solution to solve this problem is by using a soil improvement. A project in Bandung Selatan chose to apply Surcharge Preloading with PVD soil improvement method. This project used a combination of 9,2 metres surcharge preload and a 28 metres depth PVD, with triangular formation and 1,2 metres spacing. The soil improvement was finished after 548 days. This analysis aims to evaluate the settlement from the soil improvement result, which is 1,297 metres. This analysis uses a finite difference method program. The excess pore water pressure from the analysis result is 0,229 T/m2 on the 548th day. Therefore, these soil layers have possibilities to settle again in future. The 90% degree of consolidation settlement for this soil layers is 2,31 metres, which will be reached on the 813,4th days. It is suspected that there are some mistakes either during the soil improvement designing or the soil improvement process. Pembangunan di Indonesia terus berkembang. Akibatnya jumlah tanah yang baik untuk proyek konstruksi semakin menipis. Kendati demikian, ada kalanya suatu proyek harus dilaksanakan di lokasi tersebut. Salah satu solusi yang dapat ditempuh adalah dengan melakukan perbaikan tanah. Sebuah proyek di Bandung Selatan melakukan perbaikan tanah dengan metode Surcharge Preloading dengan PVD. Proyek ini menggunakan kombinasi antara timbunan setinggi 9,2 meter dan PVD sedalam 28 meter, dengan formasi segitiga yang dipasang dengan jarak antar PVD 1,2 meter. Perbaikan tanah dilakukan selama 548 hari. Analisis ini bertujuan melakukan evaluasi terhadap kurang maksimalnya penurunan di lapangan yang hanya mencapai 1,297 meter. Analisis dilakukan dengan bantuan program beda hingga. Berdasarkan hasil analisis, besarnya excess pore water pressure pada hari ke-548 adalah 0,229 T/m,2, sehingga lapisan tanah tersebut masih memiliki potensi untuk mengalami penurunan. Adapun penurunan konsolidasi 90% yang dapat terjadi sebesar 2,31 meter pada hari ke-813,4. Diduga terdapat kesalahan baik dalam perhitungan perencanaan awal ataupun saat pelaksanaan di lapangan.