scholarly journals Finite Element Analysis of Vertical and Horizontal Drainage Structures under Vacuum Combined Surcharge Preloading

2021 ◽  
Vol 2021 ◽  
pp. 1-11
Author(s):  
Daqing Wang ◽  
Dong Wei ◽  
Guoyi Lin ◽  
Jiannan Zheng ◽  
Zhiting Tang ◽  
...  

Combined vacuum and surcharge preloading has gradually been widely used because of its advantages of low cost, green environmental protection, and good treatment effect. The conventional prefabricated vertical drain presents obvious defects in vacuum preloading treatment, such as obvious silting, serious bending of the drainage board, large attenuation of vacuum degree of drainage board along the depth, long construction period, and so on, which affect the final reinforcement effect. In this paper, the MIDAS finite element simulation of combined vacuum and surcharge preloading of prefabricated vertical drains (PVDs) and prefabricated horizontal drains (PHDs) is established through the comparative experiment of the engineering field. The comparative experimental study is carried out from the aspects of the vertical settlement, horizontal displacement, and pore water pressure. The results show that under combined vacuum and surcharge preloading, the consolidation effect of soft soil with PHDs is better than that with PVDs. When PHDs are used, the vertical settlement increases by 7.2% compared with PVDs; the horizontal displacement is larger; and the pore water pressure dissipates faster. This is because when the PHDs are adopted, the consolidation direction of the soil is consistent with the direction of the vacuum suction, which is mainly caused by vertical settlement. With the consolidation, the spacing between PHDs is gradually shortened, and the drainage distance is reduced, which can effectively reduce the consolidation time and improve the reinforcement effect of the soil. In addition, the PHDs can move downward uniformly with the soil during the consolidation process and have almost no bending deformation, which makes the vacuum transfer more uniform and effective.

2014 ◽  
Vol 1030-1032 ◽  
pp. 1037-1040
Author(s):  
Jin Fang Hou ◽  
Ju Chen ◽  
Jian Yu

The artificial island ground on an open sea is covered by thick soft soil. It must be improved before using. In accordance with a designing scheme, the ground treatment method is inserting drain boards on land and jointed dewatering surcharge preloading, the residual settlement is not more than 30cm after improvement and the average consolidation degree is more than 85%. In order to estimate ground improvement effect and construction safety, instruments are buried to monitor the whole ground improving processes. By monitoring settlement and pore water pressure, it is shown that the total ground settlement in construction is 2234mm, its final settlement is 2464mm, and consolidation degree and residual settlement respectively satisfy requirements. In ground improvement, horizontal displacement is small and construction is safe. Meanwhile, the results of soil properties and vane shear strength detection tests show the soft soil ground is greatly reduced in water content and porosity ratio, and improved in strength. It is named that the ground improvement method is reasonable and reaches expected effect.


2011 ◽  
Vol 2011 ◽  
pp. 1-12
Author(s):  
Mohammed Y. Fattah ◽  
Kais T. Shlash ◽  
Nahla M. Salim

The problem of the proposed “Baghdad metro line” which consists of two routes of 32 km long and 36 stations is analyzed. The tunnel is circular in cross-section with a 5.9 m outer diameter. The finite element analyses were carried out using elastic-plastic and modified Cam clay models for the soil. The excavation has been used together with transient effects through a fully coupled Biot formulation. All these models and the excavation technique together with Biot consolidation are implemented into finite-element computer program named “Modf-CRISP” developed for the purpose of these analyses. The results indicate that there is an inward movement at the crown and this movement is restricted to four and half tunnel diameters. A limited movement can be noticed at spring line which reaches 0.05% of tunnel diameter, while there is a heave at the region below the invert, which reaches its maximum value of about 0.14% of the diameter and is also restricted to a region extending to 1.5 diameters. The effect of using reduced zone on excess pore water pressure and surface settlement (vertical and horizontal) was also considered and it was found that the excess pore water pressure increases while the settlement trough becomes deeper and narrower using reduced .


2011 ◽  
Vol 368-373 ◽  
pp. 2795-2803
Author(s):  
Heng Hu ◽  
Yan Li ◽  
Zhi Liang Dong ◽  
Yan Luo ◽  
Gong Xin Zhang

All the time, security control method of loading is an important research part in the surcharge preloading, which is directly related to safety of the construction process. Starting from the stress path, discussing the variation of excess pore water pressure and relationship between stress path and security, and bringing forward the control method with a safety factor Fs based on the stress path. By measuring the change of excess pore water pressure, the control method with a safety factor Fs can reflect quantitatively the security status of soil and achieve the purpose of the process control, finally the security control method including the safety factor of loading and speed control is put forward to monitor construction safety. The safety factor of loading Fs is verified and back analyzed with the finite-element software, getting the correction factor from 0.90 to 1.20.


2019 ◽  
Vol 2019 ◽  
pp. 1-18 ◽  
Author(s):  
Jianqing Jiang ◽  
Reqiang Liu

One of the commonly used techniques to improve marine soft ground is the drainage consolidation method by plastic board drains (PBDs). But some complex marine soft ground will cause construction inconvenience of PBDs in certain areas of these sites, thus affecting the improvement effect. An alternative possible approach to overcoming these deficiencies may be the combination of PBDs and sand wick drains (SWDs) (i.e., composite prefabricated vertical drains (CPVDs)) as vertical drainage channels in the same site. In order to verify the suitability and performance of this method in marine soft ground improvement, a case study was performed based on the field monitoring and construction of the marine soft ground of an intercity express railway project in China. The construction procedure using the CPVD system, the field monitoring instrumentation scheme, and the design of fill surcharge level were described, and the field monitoring data were presented. The settlement characteristics, dissipation features of pore water pressure, and the horizontal movement pattern were assessed. In addition, predictions of ultimate settlement, postconstruction settlement, and consolidation degree were discussed by applying a modified hyperbolic model. The results show that the marine ground improved by the CPVD system is suitable for the construction of intercity express railway and high-speed railway. The improvement construction period of complex marine soft ground will be greatly shortened by the proposed parallel construction programme. This work will provide technical supports and application reference for the improvement of the similar marine soft ground.


2011 ◽  
Vol 415-417 ◽  
pp. 869-874
Author(s):  
Yun Cao

Dynamic compaction is a widely used method for subgrade treatment due to its merit. This article presented example of dynamic compaction test in a liquid foundation project and investigated the relationship between settlement, ground heave and drop counts, the relationship between horizontal displacement and depth of soil, the relationship between drop counts, depth, horizontal displacement and pore water pressure, and the relation curve of pore water pressure and time during single point impact test. According to the conclusion before and after the testing, some appropriate engineering parameters were obtained and some advices were put forward.


2015 ◽  
Vol 23 (2) ◽  
pp. 9-18 ◽  
Author(s):  
Mohammed Y. Fattah ◽  
Raid R. Al-Omari ◽  
Haifaa A. Ali

Abstract In this paper, a method for the treatment of the swelling of expansive soil is numerically simulated. The method is simply based on the embedment of a geogrid (or a geomesh) in the soil. The geogrid is extended continuously inside the volume of the soil where the swell is needed to be controlled and orientated towards the direction of the swell. Soils with different swelling potentials are employed: bentonite base-Na and bentonite base-Ca samples in addition to kaolinite mixed with bentonite. A numerical analysis was carried out by the finite element method to study the swelling soil's behavior and investigate the distribution of the stresses and pore water pressures around the geocells beneath the shallow footings. The ABAQUS computer program was used as a finite element tool, and the soil is represented by the modified Drucker-Prager/cap model. The geogrid surrounding the geocell is assumed to be a linear elastic material throughout the analysis. The soil properties used in the modeling were experimentally obtained. It is concluded that the degree of saturation and the matric suction (the negative pore water pressure) decrease as the angle of friction of the geocell column material increases due to the activity of the sand fill in the dissipation of the pore water pressure and the acceleration of the drainage through its function as a drain. When the plasticity index and the active depth (the active zone is considered to be equal to the overall depth of the clay model) increase, the axial movement (swelling movement) and matric suction, as a result of the increase in the axial forces, vary between this maximum value at the top of the layer and the minimum value in the last third of the active depth and then return to a consolidation at the end of the depth layer.


2001 ◽  
Vol 38 (1) ◽  
pp. 1-15 ◽  
Author(s):  
Guoxi Wu

A nonlinear effective stress finite element approach for dynamic analysis of soil structure is described in the paper. Major features of this approach include the use of a third parameter in the two-parameter hyperbolic stress-strain model, a modified expression for unloading–reloading modulus in the Martin–Finn–Seed pore-water pressure model, and an additional pore-water pressure model based on cyclic shear stress. The additional pore-water pressure model uses the equivalent number of uniform cyclic shear stresses for the assessment of pore-water pressure. Dynamic analyses were then conducted to simulate the seismically induced soil liquefaction and ground deformation of the Upper San Fernando Dam under the 1971 San Fernando Earthquake. The analyses were conducted using the finite element computer program VERSAT. The computed zones of liquefaction and deformation are compared with the measured response and with results obtained by others.Key words: effective stress method, finite element analysis, Upper San Fernando Dam, earthquake deformation, VERSAT.


2012 ◽  
Vol 204-208 ◽  
pp. 50-53
Author(s):  
Zhong Ming He ◽  
Wei Wu ◽  
Ling Zeng ◽  
Zhong Xin Cai

A numerical model was built by Finite Element software,discussed the effect of rainfall on slope pore water pressure、volatile water content and depth of infiltration in rainstorm condition. The results indicated that: (1)the variation of slope surface pore water pressure is more significant and the depth of infiltration is larger with the increase of rainfall intensity on the condition of fixed rainfall duration;(2)The slope section appears three pore water pressure divisions: transient saturated zone、negative pressure region and hydrostatic pressure area after the rainfall.


2012 ◽  
Vol 238 ◽  
pp. 451-454
Author(s):  
Zhong Ming He ◽  
Wei Wu ◽  
Ling Zeng ◽  
Zhong Xin Cai

A numerical model is built by Finite Element Software, discussed the effect of rainfall on slope pore water pressure, volatile water content and depth of infiltration in continuous rain condition. The result indicated that when the rainfall intensity and rainfall duration reach a certain condition, the ground water table rises slowly, and mostly, the spill points of ground water locate in the foot of slope. The slope section appears three pore water pressure divisions: transient saturated zone, negative pressure region and hydrostatic pressure area after the rain.


Author(s):  
Adib Lathiful Huda ◽  
Sri Prabandiyani Retno Wardani ◽  
Suharyanto Suharyanto

Salah satu penyebab kegagalan struktur bendungan adalah terjadinya rembesan yang dipicu oleh tingginya tekanan air pori yang terjadi pada tubuh bendungan. Pada Bendungan Panohan, kebocoran rembesan terjadi hingga memotong lereng hilir bendungan yang dapat mengganggu stabilitas tubuh bendungan. Tujuan dari penelitian ini adalah untuk mengevaluasi tekanan air pori dan rembesan di tubuh Bendungan Panohan menggunakan metode analisis instrumentasi piezometer dan v-notch yang kemudian dibandingkan dengan analisis metode elemen hingga (finite element method / FEM) menggunakan program perangkat lunak SEEP/W. Metode FEM menggunakan parameter desain material selama tahap perencanaan bendungan. Kedua analisis dilakukan pada section C - C Bendungan Panohan menggunakan beberapa variasi ketinggian muka air waduk. Hasil perbandingan menunjukkan bahwa nilai tekanan air pori dan rembesan pada metode FEM lebih besar dari hasil analisis dengan metode pembacaan instrumentasi pada kondisi muka air minimal dan normal. Kondisi sebaliknya terjadi pada kondisi ketinggian air banjir, yaitu nilai tekanan air pori dan rembesan dari pembacaan instrumentasi lebih besar dari hasil analisis metode FEM. Seiring dengan naiknya ketinggian muka air waduk, terjadi kenaikan nilai tekanan air pori dan rembesan dari kedua hasil analisis. Kondisi rembesan yang terjadi pada  Bendungan Panohan saat ini tidak aman pada kondisi muka air banjir, karena memiliki nilai debit rembesan 0,38 ltr/det melebihi dari yang disyaratkan yaitu sebesar 0,35 ltr/det.Kata kunci : bendungan panohan; tekanan air pori; rembesan; FEM ABSTRACTOne of the causes of the failure of a dam structure is the occurrence of seepage triggered by high pore water pressure that occurs in the body of the dam. In the Panohan Dam, seepage occurs on the downstream slope of the dam which can disturb the stability of the dam body. The purpose of this research is to evaluate the pore water pressure and seepage in the Panohan Dam body using the piezometer and v-notch instrumentation reading method which is then compared with the finite element (FEM) method using SEEP/W software program. FEM method uses material parameters during the dam planning stage. Both analyses were carried out on the C – C section of the Panohan Dam using several variations of reservoir water level. The comparison results show that pore water pressure in the FEM method is greater than the pore water pressure value based on the piezometer method at the minimum and normal water level conditions. The opposite condition occurs in maximum water level conditions. The seepage value of the v-notch reading is greater than the seepage value from the FEM method. Seepage that occurs in the Panohan Dam is currently unsafe under the maximal water level conditions.