epb tbm
Recently Published Documents


TOTAL DOCUMENTS

55
(FIVE YEARS 34)

H-INDEX

6
(FIVE YEARS 2)

2021 ◽  
Vol 2021 ◽  
pp. 1-14
Author(s):  
Tao Li ◽  
Jinwu Zhan ◽  
Chao Li ◽  
Zhongsheng Tan

The adaptability of an earth pressure balance (EPB) tunnel boring machine (TBM) to complex geological strata needs to be evaluated when a tunnel project is set up. It is helpful for better design and more suitable technical parameters of the machine. Because the factors that influence adaptability are numerous and interrelated, their effects also differ; hence, a quantitative assessment of adaptability is generally difficult. In the present study, a method for quantitatively evaluating the excavation adaptability of an EPB TBM was developed using an analytic hierarchy process (AHP) and fuzzy comprehensive evaluation. The method first involves an initial selection of factors that may influence tunnelling. Based on the expert questionnaire and their influence weights determined by AHP, the 10 evaluation indexes from 25 primary indexes were selected to establish the evaluation index system (EIS) including a target, criteria, and index level. Fuzzy membership functions are then derived one after another based on the effect of each evaluation index on the EBP TBM tunnelling process. A fuzzy mathematical method was finally presented to determine the adaptability of an EPB TBM excavation performance. The proposed method was applied to two special sections of diameter 6.98 m excavated by two EPB TBMs in the Shenzhen Metro Line 11 project. The geological exploration shows that these two tunnel sections pass through typical composite strata in Shenzhen. The determined adaptability grades of the EPB TBMs used for composite strata were confirmed by the actual tunnel excavation. It indicates that the developed method is reasonable and useful to evaluate tunnelling adaptability of EPB TBM.


Author(s):  
Masoud Forsat ◽  
Mohammad Taghipoor ◽  
Masoud Palassi

AbstractThe present research exposes the investigation on three-dimensional modeling of the single and twin metro tunnels for the case of the Tehran metro line. At first, simulation implemented on the comparison of the ground movements in the single and twin tunnels. Then the simulation has been performed on the influence of effective parameters of EPB-TBM on the surface settlements throughout excavation. The overcutting, shield conicity, grouting, and the final lining system modeled and the influence of face supporting pressure, grout injection pressure, as well as the clear distance of the tunnels, has been analyzed. The initial results showed a valid ground settlement behavior. The maximum settlements occurred at the end of the shield tail and it was higher in the single tunnel. The face supporting pressure had more effect on the surface settlement in comparison to the grout injection pressure. By increasing the face pressure in the single tunnel, the place of maximum settlement moved back while the grout pressure is insignificant for decreasing the settlements. Furthermore, the influence of the clear distance in the twin tunnels led to zero after the length of 30 m. Accordingly, for more distances, the tunnels must be examined independently and as two different single tunnels.


Author(s):  
N.A. Labanda ◽  
A.O. Sfriso ◽  
D. Tsingas ◽  
R. Aradas ◽  
M. Martini
Keyword(s):  

Author(s):  
C.J. Shepheard ◽  
A.S.N. Alagha ◽  
G.M.B. Viggiani ◽  
S.K. Haigh

2021 ◽  
Vol 107 ◽  
pp. 103646
Author(s):  
Sinan Acun ◽  
Nuh Bilgin ◽  
Ulaş Erboylu
Keyword(s):  

2020 ◽  
Vol 49 (1) ◽  
pp. 20190847
Author(s):  
Hamed Baghali ◽  
Hamid Chakeri ◽  
Mohammad Sharghi ◽  
Daniel Dias

Sign in / Sign up

Export Citation Format

Share Document