Multi-objective Scheduling Model for Reconfigurable Assembly Systems

Author(s):  
Avinash Kumar ◽  
L. N. Pattanaik ◽  
Rajeev Agrawal
Water ◽  
2019 ◽  
Vol 11 (9) ◽  
pp. 1836 ◽  
Author(s):  
Guanjun Liu ◽  
Hui Qin ◽  
Qin Shen ◽  
Rui Tian ◽  
Yongqi Liu

Reservoirs play a significant role in water resources management and water resource allocation. Traditional flood limited water level (FLWL) of reservoirs is set as a fixed value which over-considers the reservoir flood control and limits the benefits of reservoirs to a certain extent. However, the dynamic control of the reservoir FLWL is an effective solution. It is a method to temporarily increase the water level of the reservoir during the flood season by using forecast information and discharge capacity, and it can both consider flood control and power generation during the flood season. Therefore, this paper focuses on multi-objective optimal scheduling of dynamic control of FLWL for cascade reservoirs based on multi-objective evolutionary algorithm to get the trade-off between flood control and power generation. A multi-objective optimal scheduling model of dynamic control of FLWL for cascade reservoirs which contains a new dynamic control method is developed, and the proposed model consists of an initialization module, a dynamic control programming module and an optimal scheduling module. In order to verify the effectiveness of the model, a cascade reservoir consisting of seven reservoirs in the Hanjiang Basin of China were selected as a case study. Twenty-four-hour runoff data series for three typical hydrological years were used in this model. At the same time, two extreme schemes were chosen for comparison from optimized scheduling schemes. The comparison result showed that the power generation can be increased by 9.17 × 108 kW·h (6.39%) at most, compared to the original design scheduling scheme, while the extreme risk rate also increased from 0.1% to 0.268%. In summary, experimental results show that the multi-objective optimal scheduling model established in this study can provide decision makers with a set of alternative feasible optimized scheduling schemes by considering the two objectives of maximizing power generation and minimizing extreme risk rate.


Sign in / Sign up

Export Citation Format

Share Document