Research on Reasonable Water Injection Parameters of Water Flowing Barrier to Delay Bottom Water Coning

Author(s):  
Ying Fu ◽  
Zheng-jun Zhu ◽  
Chao Zhang ◽  
Tao Shi ◽  
Hui Ma ◽  
...  
Author(s):  
Samir Prasun ◽  
A. K. Wojtanowicz

Maximum stabilized water-cut (WC), also known as ultimate water-cut in a reservoir with bottom-water coning, provides important information to decide if reservoir development is economical. To date, theory and determination of stabilized water-cut consider only single-permeability systems so there is a need to extend this concept to Naturally Fractured Reservoirs (NFRs) in carbonate rocks — known for severe bottom water invasion. This work provides insight of the water coning mechanism in NFR and proposes an analytical method for computing stabilized water-cut and relating to well-spacing design. Simulated experiments on a variety of bottom-water hydrophobic NFRs have been designed, conducted, and analyzed using dual-porosity/dual-permeability (DPDP) commercial software. They show a pattern of water cut development in NFR comprising the early water breakthrough and very rapid increase followed by water cut-stabilization stage, and the final stage with progressive water-cut. The initial steply increase of water-cut corresponds to water invading the fractures. The stabilized WC production stage occurs when oil is displaced at a constant rate from matrix to the water-producing fractures. During this stage water invades matrix at small values of capillary forces so they do not oppose water invasion. In contrast, during the final stage (with progressing water cut) the capillary forces grow significantly so they effectively oppose water invasion resulting in progressive water cut. A simple analytical model explains the constant rate of oil displacement by considering the driving effect of gravity and viscous forces at a very small value of capillary pressure. The constant oil displacement effect is confirmed with a designed series of simulation experiments for a variety of bottom-water NFRs. Statistical analysis of the results correlates the duration of the stabilized WC stage with production rate and well-spacing and provides the basis for optimizing the recovery. Results show that stabilized water-cut stage does not significantly contribute to recovery, so the stage needs to be avoided. Proposed is a new method for finding the optimum well spacing that eliminates the stabilized WC stage while maximizing recovery. The method is demonstrated for the base-case NFR.


Author(s):  
Yanlai Li ◽  
Jie Tan ◽  
Songru Mou ◽  
Chunyan Liu ◽  
Dongdong Yang

AbstractFor offshore reservoirs with a big bottom water range, the water cut rises quickly and soon enters the ultra-high water cut stage. After entering the ultra-high water cut stage, due to the influence of offshore production facilities, there are few potential tapping measures, so it is urgent to explore the feasibility study of artificial water injection development. The quasi-three-dimensional and two-dimensional displacement experiments are designed using the experimental similarity criteria according to the actual reservoir parameters. Several experimental schemes are designed, fluid physical properties, interlayer distribution, and development mode according to the actual reservoir physical properties. Through the visualization of experimental equipment, the bottom water reservoir is visually stimulated. The displacement and sweep law of natural water drive and artificial water injection in bottom water reservoir with or without an interlayer, different viscosity, and different well spacing is analyzed. The following conclusions are obtained: (1) For reservoirs with a viscosity of 150 cp. The recovery factor after water injection is slightly higher than before water injection. However, the recovery factor is lower than that without injection production. The reason is that the increment of injection conversion is limited to reduce one production well after injection conversion. (2) For reservoirs with a viscosity of 30 cp. The recovery factor after injection is 39.8%, which is slightly higher than 38.9% without injection. (3) For reservoirs with a viscosity of 150 cp. In the case of the interlayer. The recovery factor after injection is 30.7%, which is significantly higher than 24.8% without injection. (4) After the well spacing of the low-viscosity reservoir is reduced, the recovery factor reaches 46.1%, which is higher than 38.9% of the non-infill scheme. After the infill well in a low-viscosity reservoir is transferred to injection, the recovery factor is 45.6%, which has little change compared with non-injection, and most of the cumulative production fluid is water. The feasibility and effect of water flooding in a strong bottom water reservoir are demonstrated. This study provides the basis for the proposal of production well injection conversion and the adjustment of production parameters in the highest water cut stage of a big bottom water reservoir.


2020 ◽  
Vol 56 (3) ◽  
pp. 453-464
Author(s):  
Qingping Jiang ◽  
Chao Jindong ◽  
Wang Zhigang ◽  
Ninghong Jia ◽  
Kong Chuixian ◽  
...  

2021 ◽  
Author(s):  
Youssef Beltaifa ◽  
Sascha Holzberger ◽  
Ferhat Aslan ◽  
Maurice Kettner ◽  
Peter Eilts

1988 ◽  
Vol 53 (6) ◽  
pp. 517-524 ◽  
Author(s):  
Yoshiaki UEDA ◽  
Kazuya KOYAMA ◽  
Kazuo FUJITA
Keyword(s):  

2009 ◽  
Vol 131 (10) ◽  
Author(s):  
Ibrahim Sami Nashawi ◽  
Ealian H. Al-Anzi ◽  
Yousef S. Hashem

Water coning is one of the most serious problems encountered in active bottom-water drive reservoir. It increases the cost of production operations, reduces the efficiency of the depletion mechanism, and decreases the overall oil recovery. Therefore, preventive measures to curtail water coning damaging effects should be well delineated at the early stages of reservoir depletion. Production rate, mobility ratio, well completion design, and reservoir anisotropy are few of the major parameters influencing and promoting water coning. The objective of this paper is to develop a depletion strategy for an active bottom-water drive reservoir that would improve oil recovery, reduce water production due to coning, delay water breakthrough time, and pre-identify wells that are candidates to excessive water production. The proposed depletion strategy does not only take into consideration the reservoir conditions, but also the currently available surface production facilities and future development plan. Analytical methods are first used to obtain preliminary estimates of critical production rate and water breakthrough time, then comprehensive numerical investigation of the relevant parameters affecting water coning behavior is conducted using a single well 3D radial reservoir simulation model.


Sign in / Sign up

Export Citation Format

Share Document