Integration of mini-frac stress results with core data to identify ductile behavior of overpressured sandstone reservoir in deep-water offshore Krishna-Godavari basin, India

Author(s):  
Jayanta Dutta ◽  
Nitin Bhardwaj ◽  
Ashutosh Kumar
ICIPEG 2016 ◽  
2017 ◽  
pp. 617-641
Author(s):  
A. Al-Hasani ◽  
I. M. Saaed ◽  
A. M. Salim ◽  
H. T. Janjuhah

Geofluids ◽  
2020 ◽  
Vol 2020 ◽  
pp. 1-10
Author(s):  
Zhiwang Yuan ◽  
Li Yang ◽  
Yingchun Zhang ◽  
Rui Duan ◽  
Xu Zhang ◽  
...  

For deep-water faulted sandstone reservoirs, the general practice is to design long horizontal wells improving well productivity. During the project implementation stage, well tests are performed on all drilled wells to evaluate well productivity accurately. Furthermore, multisize chokes are often utilized in a shorten test time for loosen formation, high test cost, and high well productivity. Nevertheless, the conventional productivity evaluation approach cannot accurately evaluate the well test productivity and has difficulty in determining the underneath pattern. As a result, the objective of this paper is to determine a productivity evaluation method for multisize chokes long horizontal well test in deep-water faulted sandstone reservoir. This approach introduces a productivity model for long horizontal wells in faulted sandstone reservoir. It also includes the determination of steady-state test time and the productivity evaluation method for multisize chokes. In this paper, the EGINA Oilfield, a deep-water faulted sandstone reservoir, located in West Africa was chosen as the research target. Based on Renard and Dupuy’s steady-state equation, the relationship between the productivity index per meter and the length of horizontal section was derived. Consequently, this relationship is used to determine the productivity pattern for long horizontal wells with the same geological features, which can provide more accurate productivity evaluations for tested wells and forecast the well productivity for untested wells. After implementing this approach on the EGINA Oilfield, the determined relationship is capable to accurately evaluate the test productivity for long horizontal wells in reservoirs with similar characteristics and assist in examination and treatment for horizontal wells with abnormal productivity.


2019 ◽  
Vol 108 ◽  
pp. 697-704 ◽  
Author(s):  
Jongchan Kim ◽  
Sheng Dai ◽  
Junbong Jang ◽  
William F. Waite ◽  
Timothy S. Collett ◽  
...  

2006 ◽  
Author(s):  
Raj K. Singh ◽  
Fred R. Holasek ◽  
Vijay Ratan ◽  
S.C. Gulati ◽  
B.A. Thyagaraju

Sign in / Sign up

Export Citation Format

Share Document