On the role of intergranular nanocavities in long-term stress corrosion cracking of Alloy 690

2021 ◽  
pp. 117453
Author(s):  
Zhao Shen ◽  
Edward Roberts ◽  
Naganand Saravanan ◽  
Phani Karamched ◽  
Takumi Terachi ◽  
...  
CORROSION ◽  
10.5006/3374 ◽  
2019 ◽  
Vol 76 (2) ◽  
pp. 142-175
Author(s):  
Koji Arioka

Plant life extension from the initial licensed life to beyond 60 years is now being discussed for light water cooled nuclear powered reactors (LWRs). Reliable prediction for material degradation is extremely important to keep the reliability of LWRs during such long-term operation. One of the specific perspectives for this prediction is to take into account the changes in material properties during long-term operation, such as cavity formation, even at the LWR operating temperature. The mechanism of cavity formation and the associated phenomena are closely intertwined with interdisciplinary technological and scientific knowledge. Therefore, historical key knowledge from both phenomenological and fundamental research studies related to cavity formation was first reviewed to understand the overall picture. Subsequently, current research results related to long-term stress corrosion cracking initiation in the LWR environment were summarized to explain what is known, what is still unknown, and what are the critical remaining subjects.


CORROSION ◽  
1973 ◽  
Vol 29 (6) ◽  
pp. 251-260 ◽  
Author(s):  
W. R. WEARMOUTH ◽  
G. P DEAN ◽  
R. N. PARKINS

Author(s):  
David Shanks ◽  
Rob Leeson ◽  
Corina Blaga ◽  
Rafael G. Mora

Implementation of Integrity Management Programs (IMP) for pipelines has motivated the design of Fitness-For-Service methodologies to assess Stress Corrosion Cracking (SCC) and fatigue-dependent features reported by Ultrasonic Crack Detection (UTCD) In-Line Inspections. The philosophical approach defined by the API 579 [1] “Fitness-For-Service” from the petrochemical industry in conjunction with Risk-based standards and regulations (i.e. CSA-Z662-2003 [2] and US DOT 49 Parts 192 [3] and 195 [4]) and in-line inspection validation (i.e. API 1163 [5]) approaches from the pipeline industry have provided the engineering basis for ensuring the safety, reliability and continued service of the in-line inspected pipelines. This paper provides a methodology to develop short and long-term excavation and re-inspection programs through a four (4) phase-process: Pre-Assessment, Integrity Criticality Assessment, Remediation and Repair, Remaining Life Extension and In-Service Monitoring. In the first phase, Pre-assessment, areas susceptible to Stress Corrosion Cracking (SCC) and fatigue-dependent features are correlated to in-line inspection data, soil modeling, pipeline and operating conditions, and associated consequences in order to provide a risk-based prioritization of pipeline segments and technical understanding for performing the assessment. The second phase, Integrity Criticality Assessment, will develop a short-term maintenance program based on the remaining strength of the in-line inspection reported features previously correlated, overlaid and risk-ranked. In addition, sites may be identified in Phase 1 for further investigation. In the third phase, a Remediation and Repair program will undertake the field investigation in order to repair and mitigate the potential threats as well as validating the in-line inspection results and characterization made during the Pre-assessment and Integrity Criticality Assessment (Phases 1 & 2). With the acquired knowledge from the previous three (3) phases, a Remaining Life Extension and In-Service Monitoring program will be developed to outline the long-term excavation and re-inspection program through the use of SCC and Fatigue crack growth probabilistic modeling and cost benefit analysis. The support of multiple Canadian and US pipeline operating companies in the development, validation and implementation of this methodology made this contribution possible.


Author(s):  
Arindam Chakraborty ◽  
Wasimreza Momin ◽  
Angah Miessi ◽  
Peihua Jing ◽  
Haiyang Qian

Leak-Before-Break (LBB) is employed in design of nuclear power reactor piping to eliminate consideration of the dynamic effects of pipe rupture from the plant design basis for the affected piping system. LBB cannot be applied if environmental conditions that could lead to degradation by stress corrosion cracking exists. For Alloy 600/82/182 dissimilar metal welds (DMW) in pressurized water reactor plants, primary water stress corrosion cracking (PWSCC) is found to be active. Application of weld overlay (WOL) of non-susceptible Alloy 690/52/152 material has been shown to mitigate PWSCC growth in DMW. Therefore, LBB can be considered for a DMW with Alloy 690/52/152 overlay. However, WOL sizing design postulates a complex crack which is through wall in the overlay material and part through or full circumferential in the DMW base material. This significantly reduces the critical flaw size and in turn the maximum allowable flaw size for leak rate. The current industry practice conservatively ignores the full circumferential crack in the original pipe material and assumes a through wall crack along the entire pipe thickness. This assumptions leads to significantly reduced leakage due to smaller crack opening. The problem becomes more critical with small diameter pipes. The current work calculates the crack opening displacements (CODs) for a pipe with complex crack. Since it is a function of several geometry and materials parameters, response functions are generated to calculate CODs.


Sign in / Sign up

Export Citation Format

Share Document